State the purpose of initial verification (2 marks)
State the purpose of periodic inspection and testing (2 marks)
When would a Minor Electrical Installation Works Certificate be issued? (2 marks)
Who would be responsible for signing an Electrical Installation Certificate? (3 marks)
Identify the meaning of IP4X and state where it would be applied for requirements for basic
protection. (2 marks)
, Name Date
Identify the meaning of IP2X and state where it would be applied for requirements for basic
protection (2 marks)
2. A new metallic trunking system has been installed on an internal wall to supply some three phase
sockets. It is to be inspected prior to the cables being installed. Complete the table below, stating
five items that should be checked before the cables are installed, what is being checked for and the
human sense to be used in each case.
(15 marks)
Item What item is being checked before What the item is being Human sense used.
Number the cables are installed checked for
1
2
3
4
5
An earth electrode test is to be carried out on installation forming part of a TT system.
State the two instruments that could be used to carry out the test. (1 Mark)
Explain briefly the three main stages in conducting an Earth Electrode Test using test method E1
(3 marks)
2365 Unit 614 Mock Exam Version A (100% Verified) Questions & Answers Latest Update.
Section A
State the purpose of initial verification (2 marks)
State the purpose of periodic inspection and testing (2 marks)
When would a Minor Electrical Installation Works Certificate be issued? (2 marks)
Who would be responsible for signing an Electrical Installation Certificate? (3 marks)
Identify the meaning of IP4X and state where it would be applied for requirements for basic
protection. (2 marks)
, Name Date
Identify the meaning of IP2X and state where it would be applied for requirements for basic
protection (2 marks)
2. A new metallic trunking system has been installed on an internal wall to supply some three phase
sockets. It is to be inspected prior to the cables being installed. Complete the table below, stating
five items that should be checked before the cables are installed, what is being checked for and the
human sense to be used in each case.
(15 marks)
Item What item is being checked before What the item is being Human sense used.
Number the cables are installed checked for
1
2
3
4
5
An earth electrode test is to be carried out on installation forming part of a TT system.
State the two instruments that could be used to carry out the test. (1 Mark)
Explain briefly the three main stages in conducting an Earth Electrode Test using test method E1