100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Ensayo

SCH4801 ASSIGNMENT 2 2025

Puntuación
-
Vendido
1
Páginas
18
Grado
A+
Subido en
20-06-2025
Escrito en
2024/2025

SCH4801 ASSIGNMENT 2 2025

Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
20 de junio de 2025
Número de páginas
18
Escrito en
2024/2025
Tipo
Ensayo
Profesor(es)
Desconocido
Grado
A+

Temas

Vista previa del contenido

SCH4801 ASSIGNMENT 2 2025


DISCLAIMER: THIS IS NOT AN OFFICIAL GUIDE FROM UNISA. THE REPORT IS
NOT PREPARED NOR APPROVED BY UNISA, RATHER REPRESENTS A
POSSIBLE SOLUTION TO THE TASK CONSISTENT WITH THEORY OF SCH4801.
THIS REPORT IS INTENDED TO ASSIST STUDENTS IN GETTING STARTED WITH
THEIR ASSIGNMENT, AND IN NO CASE THIS DOCUMENT SHOULD BE USED
FOR CHEATING. WE BELIEVE THIS WILL BE A GOOD STARTING POINT AS IT
WAS PREPARED BY OUR TEAM OF PROFESSIONAL PRIVATE TUTORS WHO
ARE EXPERTS IN THE FIELD, AND IT WAS PREPARED USING VARIOUS
SOURCES. ANY SIMILARITY WITH ANY EXISTING THEORY OR DISCUSSION BY
OTHER AUTHORS IS EXCUSED. THE AUTHORS HOWEVER DO NOT CLAIM
MONOPOLY TO KNOWLEDGE HENCE MODIFICATION OF THE ANSWERS
CONTAINED IN THIS FRAMEWORK MAY NOT BE PROHIBITED AS IT
CONTRIBUTES TO EXPANSION OF KNOWLEDGE. FOR ANY FURTHER
GUIDELINE ABOUT THE INFORMATION CONTAINED HERE AND THE MODULE
IN GENERAL, CONTACT PASSMATE TUTORIALS.



WE ASSIST WITH OTHER MODULES INCLUDING:

ECSs, FACs, MACs, MNGs, INTs, TRLs, HMEMS, PRMs, PROs, MNBs, DSC, QMI,
MNMs, MNO, MNPs, FIN, PUBs, MNMs, RESEARCH among others.

WE OFFER CLASSES, ASSIGNMENT GUIDELINES, EXAMINATION
PREPARATION, RESEARCH AND RESEARCH PROPOSALS, DISSERTATION
EDITING etc.

OTHER THAN UNISA, WE ALSO ASSIST STUDENTS AT VARIOUS INSTITUTIONS
INCLUDING MANCOSA, REGENT, REGEYNESES, BOSTON, STADIO, OLG, UJ,
UP etc

For any enquiries the following numbers can be used for calling, sms, whatsapp and
telegram

CONTACT PASSMATE TUTORIALS @061 262 1185/068 053 8213/0717 513 144 or email


,SCH4801 ASSIGNMENT 2 2025



SECTION A

1.1 Inventory-related decisions

Procurement managers at Toyota are considering a future sourcing strategy of 40% from
local suppliers and 60% from global suppliers, which will significantly impact their
inventory decisions. To balance efficiency and responsiveness, evaluating three key
inventory categories relevant to Toyota and their potential trade-offs is crucial. Toyota's
current operations already involve sourcing raw materials and components, assembling
vehicles, and distributing finished products, implying the existence of these inventory
categories within their value chain.

Raw Materials and Components:

Raw materials and components are the inputs required for vehicle production, such as
brake pedals, catalytic converters, fuel tanks, shift lever knobs, and rear seat assembly
locks according to Ambe (2014). For Toyota, this category is vital as disruptions here
directly halt production.

o Efficiency Considerations: Sourcing 60% of components globally may
offer cost efficiencies through economies of scale and access to a wider
pool of competitive suppliers. However, managing inventory for a larger
proportion of globally sourced materials introduces challenges. To
maintain efficiency, Toyota would aim for lower inventory levels of these
raw materials to reduce holding costs and capital tied up. This is aligned
with Toyota's focus on eliminating waste and maintaining high efficiency
through 'The Toyota Production System' (TPS).

o Responsiveness Considerations: The 60% global sourcing strategy
introduces longer lead times and potentially higher uncertainties due to
greater distances and logistical complexities. To maintain responsiveness
to production demands, Toyota might need to increase buffer or safety
stock for these global components to mitigate risks of supply disruptions,
as experienced in 2019 due to a strike at a local supplier. While local
sourcing (40%) can provide quicker replenishment and greater flexibility to

, SCH4801 ASSIGNMENT 2 2025


unforeseen changes, the 2019 component shortage from a single local
supplier demonstrates that over-reliance, even locally, can severely impact
operations.

o Trade-offs: The primary trade-off is between lower purchasing costs
from global economies of scale (efficiency) and higher inventory
holding costs (including safety stock and inventory in transit) to ensure
continuous production despite longer and less predictable global lead
times (responsiveness). Toyota must carefully manage supplier
relationships for these diverse sources, assessing them based on cost,
quality, delivery, and environmental issues.

Work-in-Progress (WIP) Inventory:

WIP according to Bowersox, Closs, Cooper and Bowersox (2020) refers to partially
completed vehicles or sub-assemblies currently undergoing production processes
within Toyota's Prospection plant. Toyota's manufacturing philosophy, TPS, aims for high
efficiency by minimizing waste, including overproduction and unnecessary processes,
which directly impacts WIP levels.

o Efficiency Considerations: Toyota's TPS is built on Just-in-Time (JIT)
production, which seeks to deliver components at the exact time and
quantity needed, thereby minimizing WIP levels. Lower WIP significantly
reduces holding costs, storage space, and the risk of obsolescence or
damage to incomplete products, as seen in the extensive damage to
vehicles on-site during the 2022 KwaZulu-Natal floods. This aligns with
Toyota's objective of achieving higher quality and lower costs through lean
practices.

o Responsiveness Considerations: While minimal WIP is efficient, a
completely stockless system (theoretical JIT) can make Toyota highly
vulnerable to disruptions. The future mix of global (60%) and local (40%)
suppliers, with associated longer lead times for global components,
means that managing WIP to maintain responsiveness is complex.
Strategic positioning of WIP at "push-pull boundaries" can allow for greater
$8.18
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
passmatetutorials University of South Africa (Unisa)
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1052
Miembro desde
2 año
Número de seguidores
695
Documentos
673
Última venta
2 semanas hace
Passmate

We connect careers and dreams!

3.7

105 reseñas

5
50
4
13
3
21
2
5
1
16

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes