,1.What is the MOST important consideration when specifying light fixtures for a retail
store?
A. Wattage
B. Indirect glare
C. Reflected glare
D. Color rendering index
Answer: D
Explanation:
The NCIDQ IDPX exam tests the designer’s understanding of lighting design,
particularly for specific applications like retail stores, where the quality of light
significantly impacts the customer experience.
Option A (Wattage): Wattage refers to the power consumption of a light fixture, which
is important for energy efficiency but is not the most critical factor in a retail store.
t
en
Modern lighting (e.g., LEDs) focuses more on lumens (light output) than wattage, and
m
ve
wattage does not directly affect the quality of light for retail purposes.
ie
ch
Option B (Indirect glare): Indirect glare occurs when light reflects off surfaces in a way
A
r
ou
that causes discomfort but is not directly in the line of sight. While glare control is
Y
important, it is not the most critical factor in retail, where the focus is on product
ce
an
presentation. -E
nh
Option C (Reflected glare): Reflected glare is caused by light bouncing off shiny
ns
surfaces (e.g., glass displays) into the viewer’s eyes. While this should be minimized,
io
st
it is also not the most important consideration compared to how products are
ue
Q
perceived.
m
xa
Option D (Color rendering index): This is the correct choice. The Color Rendering
lE
ea
Index (CRI) measures how accurately a light source renders colors compared to a
R
h
reference light (e.g., daylight). In a retail store, the CRI is the most important
it
w
consideration because it directly affects how products (e.g., clothing, cosmetics)
)
02
8.
appear to customers. A high CRI (e.g., 80 or above) ensures that colors are true and
(V
ps
vibrant, enhancing the shopping experience and influencing purchasing decisions.
um
Verified Answer from Official Source:
D
X
The correct answer is verified from NCIDQ’s official study materials on lighting design
P
ID
for retail environments.
Q
ID
C
“In retail environments, the most important consideration when specifying light
fixtures is the Color Rendering Index (CRI), as it ensures accurate color
representation of products, enhancing their appeal to customers.” (NCIDQ IDPX
Study Guide, Lighting Design Section)
The NCIDQ IDPX Study Guide emphasizes that CRI is the most critical factor in retail
lighting because it affects how products are perceived by customers. A high CRI
ensures that colors are accurately displayed, which is essential for retail sales,
making Option D the correct answer.
Objectives:
Understand lighting design considerations for retail spaces (NCIDQ IDPX Objective:
Lighting Design).
,Apply lighting specifications to enhance user experience (NCIDQ IDPX Objective:
Design Development).
2.Which space would MOST likely have a dedicated HVAC system?
A. an office in a high rise
B. computer room in a school
C. lobby of a healthcare center
Answer: B
Explanation:
A computer room (e.g., server room) requires a dedicated HVAC system to maintain
precise temperature and humidity control, protecting sensitive equipment from heat
and static, per ASHRAE standards. An office in a high rise (A) typically uses a central
t
en
HVAC system shared across floors. A healthcare lobby (C) relies on general building
m
ve
HVAC, not a dedicated unit, unless critical (e.g., isolation). Computer rooms (B) have
ie
ch
unique cooling demands, making a dedicated system most likely.
A
r
ou
Verified Answer from Official Source: B - computer room in a school
Y
"Computer rooms most likely require dedicated HVAC systems to ensure consistent
ce
an
environmental control for equipment performance." (NCIDQ IDPX Study Guide,
-E
nh
Section 2: Building Systems) from Official Source: The NCIDQ highlights dedicated
ns
HVAC for spaces with specialized needs, like computer rooms, to prevent damage
io
st
and ensure operational reliability.
ue
Q
Objectives:
m
xa
Integrate specialized building systems (IDPX Objective 2.9).
lE
ea
R
h
it
w
3.During a final walk-through, the interior designer notices that a decorative light
)
02
8.
fixture was not installed on a dimmer as specified. Where should the designer
(V
ps
document the issue?
um
A. RFI
D
X
B. Change order
P
ID
C. Punch (deficiency) list
Q
ID
C
Answer: C
Explanation:
The NCIDQ IDPX exam tests the designer’s understanding of project closeout
procedures, including the documentation of deficiencies during a final walk-through. A
final walk-through is conducted to identify any incomplete or incorrect work before the
project is considered substantially complete.
Option A (RFI): A Request for Information (RFI) is used during construction to seek
clarification or additional information from the designer or other parties. It is not the
appropriate tool for documenting deficiencies at the end of a project.
Option B (Change order): A change order is a formal modification to the construction
contract, typically used to address changes in scope, cost, or schedule during
, construction. The light fixture not being on a dimmer is a deficiency (an error in
execution), not a change in scope, so a change order is not appropriate.
Option C (Punch (deficiency) list): This is the correct choice. A punch list (also called
a deficiency list) is a document created during the final walk-through to record any
items that are incomplete, incorrect, or not in accordance with the contract
documents. The light fixture not being on a dimmer as specified is a deficiency, and it
should be noted on the punch list for the contractor to correct before final completion.
Correction of Typographical Error:
The original question lists only three options (A, B, C), but the NCIDQ format typically
includes four options (A, B, C, D). The missing Option D does not affect the answer,
as Option C is clearly the correct choice based on the given options. For
completeness, a potential Option D might be something like “Construction schedule,”
which would be incorrect, as the schedule is not a tool for documenting deficiencies.
t
en
Verified Answer from Official Source:
m
ve
The correct answer is verified from NCIDQ’s official study materials on project
ie
ch
closeout and punch list procedures.
A
r
ou
“During a final walk-through, any deficiencies, such as items not installed as
Y
specified, should be documented on the punch (deficiency) list for the contractor to
ce
an
address before final completion.” (NCIDQ IDPX Study Guide, Project Closeout
-E
nh
Section)
ns
The NCIDQ IDPX Study Guide specifies that a punch list is the appropriate tool for
io
st
documenting deficiencies during a final walk-through. The light fixture issue is a
ue
Q
deficiency, and recording it on the punch list ensures it will be corrected, making
m
xa
Option C the correct answer.
lE
ea
Objectives:
R
h
Understand the purpose of a punch list in project closeout (NCIDQ IDPX Objective:
it
w
Project Closeout).
)
02
8.
Apply documentation processes to address construction deficiencies (NCIDQ IDPX
(V
ps
Objective:
um
Construction Administration).
D
X
P
ID
Q
ID
C
4.What spaces are typically grouped together in a multistory building’s service core?
A. lobby, elevator, corridors, stairs
B. stairs, elevator, toilet rooms, supply closet
C. kitchen, toilet rooms, loading docks, laundry
D. janitors closets, electrical closets, data rooms, HVAC
Answer: B
Explanation:
A multistory building’s service core centralizes vertical circulation and utilities for
efficiency and accessibility. Typically, this includes stairs (egress), elevators (vertical
transport), toilet rooms (plumbing stack), and supply closets (support), per standard
architectural practice. Lobby and corridors (A) are public areas, not core-specific.