1. Leadership in Ener- has 4 certification levels.
gy and Environmental
Design (LEED)
2. Installation of EVSE at is worth as many as 15 LEED points.
an existing building
3. Installing electric ve- may improve public perception of a business.
hicle charging equip-
ment
4. When a business in- the public may sense that the business supports sustainability.
stalls charging equip-
ment
5. Determining the ap- requires the person planning the installation to consider all of the above.
propriate location for
EVSE
6. Proper location of may include consideration of ADA guidelines depending on location.
EVSE
7. Jurisdictional codes should always be checked when determining the location and other fea-
and requirements tures of the EVSE.
8. Bollards, curbs, and can protect charging equipment from physical damage from vehicles.
wheel stops
9. Adequate site light- increases the safety of an EVSE location.
ing
10. Trailblazing signs are for directing drivers to the location of EV charging equipment.
11. 4% of general parking spaces should be accessible.
, EVITP Final Exam Questions and Verified Answers
Study online at https://quizlet.com/_hfg1m0
According to the ADA
guidelines
12. ADA parking space can be used as a guide when determining the number of EV charging
guidelines spaces that should be made accessible.
13. ADA guidelines are useful when planning an EVSE installation because all of the above.
14. Operable parts of ac- should be located 15"-48" above finish grade per ADA guidelines.
cessible equipment
15. The maximum depth such as a curb or housekeeping pad, in front of accessible equipment is
of a barrier 10".
16. DC fast chargers pose accessibility challenges because their cables and connectors are
larger and heavier than standard Level 1 and Level 2 EVSE.
17. Benefits of commis- include all of the above.
sioning the installa-
tion of electric vehi-
cle supply equipment
(EVSE)
18. commissioning is the process that ensures mechanical, electrical, and other building sys-
tems are installed, tested, and perform interactively in accordance with
design documents.
19. test EVSE ground One of the tests performed by an EVSE test set.
fault response
20. Documentation transfers important information about an installation from the contractor to
the owner.
21. true A statement indicating that the documentation transfer is important.
EVITP Final Exam Questions and Verified Answers
CORRECT ANSWERS | LATEST EXAM | GRADED A+ | VERIFIED
Study online at https://quizlet.com/_hfg1m0
ANSWERS | JUST RELEASED
1. Leadership in Ener- has 4 certification levels.
gy and Environmental
Design (LEED)
2. Installation of EVSE at is worth as many as 15 LEED points.
an existing building
3. Installing electric ve- may improve public perception of a business.
hicle charging equip-
ment
4. When a business in- the public may sense that the business supports sustainability.
stalls charging equip-
ment
5. Determining the ap- requires the person planning the installation to consider all of the above.
propriate location for
EVSE
6. Proper location of may include consideration of ADA guidelines depending on location.
EVSE
7. Jurisdictional codes should always be checked when determining the location and other fea-
and requirements tures of the EVSE.
8. Bollards, curbs, and can protect charging equipment from physical damage from vehicles.
wheel stops
9. Adequate site light- increases the safety of an EVSE location.
ing
10. Trailblazing signs are for directing drivers to the location of EV charging equipment.
11. 4% of general parking spaces should be accessible.
, EVITP Final Exam Questions and Verified Answers
Study online at https://quizlet.com/_hfg1m0
According to the ADA
guidelines
12. ADA parking space can be used as a guide when determining the number of EV charging
guidelines spaces that should be made accessible.
13. ADA guidelines are useful when planning an EVSE installation because all of the above.
14. Operable parts of ac- should be located 15"-48" above finish grade per ADA guidelines.
cessible equipment
15. The maximum depth such as a curb or housekeeping pad, in front of accessible equipment is
of a barrier 10".
16. DC fast chargers pose accessibility challenges because their cables and connectors are
larger and heavier than standard Level 1 and Level 2 EVSE.
17. Benefits of commis- include all of the above.
sioning the installa-
tion of electric vehi-
cle supply equipment
(EVSE)
18. commissioning is the process that ensures mechanical, electrical, and other building sys-
tems are installed, tested, and perform interactively in accordance with
design documents.
19. test EVSE ground One of the tests performed by an EVSE test set.
fault response
20. Documentation transfers important information about an installation from the contractor to
the owner.
21. true A statement indicating that the documentation transfer is important.