⫸ If a $1,000,000 project is 75% complete and a WIP report shows that the project is underbilled by $15,000, what does this mean? Answer: Work has been performed on this project for unapproved change orders ⫸ In earned value, if the planned percent complete value is less than the percent complete value, then the project is ahead of schedule. Answer: True ⫸ The Actual Cost of Work Performed is the Earned Value for a project. Answer: False ⫸ If the cost performance index for an earned value analysis is greater than one, then the project is under budget at that point in time. Answer: True ⫸ In the Charlotte Pipe Company video, the plumbing contractor and owner accepted a value engineering alternative to change the underground cast iron pipe to PVC to reduce cost, which ultimately reduced the fuction and quality of the underground plumbing system. Answer: True ⫸ One major barrier to the use of VE on construction projects is that VE is not required on public or private projects. Answer: False ⫸ Typically, any VE savings realized are split evenly between the general contractor and the owner. Answer: True ⫸ During this step of the VE job plan, the project team looks to generate different ideas and alternatives to perform functions of a project. Answer: Creative phase ⫸ Which value analysis approach listed keeps the function and quality the same while lowering the cost? Answer: cost reduction approach ⫸ Checklists provide risks from lessons learned on previous projects and should be reviewed first before using a formal risk identification tool. Answer: False ⫸ Uncertainty is the set of positive and negative outcomes that could occur within a known risk. Answer: True ⫸ Brainstorming is a tool used to identify and assess project risks. Answer: False ⫸ Which of the following is a proper risk statement (short version)? Answer: If a delay in the delivery of structural steel happens, then the activities on the critical path could be delayed, which will cause an increase in the project duration ⫸ In a work in progress report, what does Billed to Date mean? Answer: The actual billings that reflect company accounting records

Content preview

CM 4221 EXAM QUESTIONS AND ANSWERS
ALL CORRECT RECENT UPDATES 2025.


⫸ If a $1,000,000 project is 75% complete and a WIP report shows that the
project is underbilled by $15,000, what does this mean? Answer: Work has
been performed on this project for unapproved change orders


⫸ In earned value, if the planned percent complete value is less than the
percent complete value, then the project is ahead of schedule. Answer: True


⫸ The Actual Cost of Work Performed is the Earned Value for a project.
Answer: False


⫸ If the cost performance index for an earned value analysis is greater
than one, then the project is under budget at that point in time. Answer:
True


⫸ In the Charlotte Pipe Company video, the plumbing contractor and
owner accepted a value engineering alternative to change the underground
cast iron pipe to PVC to reduce cost, which ultimately reduced the fuction
and quality of the underground plumbing system. Answer: True


⫸ One major barrier to the use of VE on construction projects is that VE is
not required on public or private projects. Answer: False


⫸ Typically, any VE savings realized are split evenly between the general
contractor and the owner. Answer: True

, ⫸ During this step of the VE job plan, the project team looks to generate
different ideas and alternatives to perform functions of a project. Answer:
Creative phase


⫸ Which value analysis approach listed keeps the function and quality the
same while lowering the cost? Answer: cost reduction approach


⫸ Checklists provide risks from lessons learned on previous projects and
should be reviewed first before using a formal risk identification tool.
Answer: False


⫸ Uncertainty is the set of positive and negative outcomes that could occur
within a known risk. Answer: True


⫸ Brainstorming is a tool used to identify and assess project risks. Answer:
False


⫸ Which of the following is a proper risk statement (short version)?
Answer: If a delay in the delivery of structural steel happens, then the
activities on the critical path could be delayed, which will cause an increase
in the project duration


⫸ In a work in progress report, what does Billed to Date mean? Answer:
The actual billings that reflect company accounting records


⫸ What is one benefit of the Arcelor top-down parking garage construction
system? Answer: Removes the parking garage activities from the critical
path


⫸ What are fringe benefits? Answer: Employees benefits that employers
pay in addition to the employee's base pay

Document information

Uploaded on
June 14, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(13)
Sold
161
Followers
2
Items
54906
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions