Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

ACI CONCRETE FIELD TESTING TECHNICIAN - GRADE I EXAM 2025

Document preview thumbnail
Preview 3 out of 18 pages

The ACI Concrete Field Testing Technician – Grade I Exam assesses the knowledge and skills necessary to properly perform and record the results of seven basic field tests on freshly mixed concrete. These procedures include sampling, temperature measurement, slump testing, air content testing, unit weight and yield, making and curing test specimens, and more. Candidates are expected to understand ASTM standards such as C172, C1064, C138, C143, C231, and C31. The exam emphasizes real-world application and safety practices, along with accurate and standardized testing procedures in accordance with ACI and ASTM protocols. This certification is essential for professionals responsible for quality control and assurance in concrete construction projects.

Content preview

ACI CONCRETE FIELD TESTING TECHNICIAN -
GRADE I EXAM
Actual Questions and Answers
Expert-Verified Explanation
This Exam contains:
✪ Multiple-choice and True/False Format
✪ Expert-Verified Explanations
✪ Verified with Trusted Textbooks



1. The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete.
A. 1 in. [25 mm]
B. 2 in. [50 mm]
C. 3 in. [75 mm]
D. 4 in. [100 mm]
Answer: C
EXPLANATION: ASTM C1064 specifies that the temperature sensor must be submerged at least 3 inches
(75 mm) to obtain an accurate temperature of the fresh concrete.



2. The temperature measuring device must have a measuring range of:
A. 0–100°F
B. 30–120°F
C. 50–150°F
D. 20–110°F
Answer: B
EXPLANATION: Per ASTM C1064, the device must measure from 30°F to 120°F [0°C to 50°C] and be
accurate within ±1°F [0.5°C].



3. The temperature measuring device must be calibrated:
A. Monthly
B. Biannually
C. Annually
D. Never
Answer: C
EXPLANATION: Annual calibration ensures accuracy unless a malfunction is suspected.



4. The temperature of concrete may be measured in a wheelbarrow.
A. True

,B. False
Answer: A
EXPLANATION: ASTM C1064 allows concrete temperature measurement in a wheelbarrow if the sample
is representative.



5. A composite sample of concrete is required to measure temperature only.
A. True
B. False
Answer: B
EXPLANATION: A composite sample is not required solely for temperature measurement.



6. Prior to sampling, the sample container must be:
A. Dry and clean
B. Heated
C. Damped
D. Insulated
Answer: C
EXPLANATION: Moistening prevents absorption and maintains sample integrity.



7. After placing the sensor in concrete, the surrounding concrete should be:
A. Compressed with a rod
B. Pressed gently
C. Removed
D. Ignored
Answer: B
EXPLANATION: Gentle pressing around the sensor ensures contact for accurate readings.



8. The temperature device must remain in concrete for:
A. 10–15 seconds
B. 30 seconds
C. 2–5 minutes
D. 6–10 minutes
Answer: C
EXPLANATION: This period allows stabilization of the reading per ASTM standards.



9. Temperature readings must be reported to the nearest:
A. 0.1°F
B. 0.5°F
C. 1°F

, D. 2°F
Answer: C
EXPLANATION: ASTM C1064 specifies reporting to the nearest 1°F [0.5°C].



10. A maximum allowable concrete temperature is specified in ASTM C1064.
A. True
B. False
Answer: B
EXPLANATION: The standard does not define a maximum; it measures temperature only.



11. The slump test mold has a height of:
A. 6 in.
B. 8 in.
C. 10 in.
D. 12 in.
Answer: D
EXPLANATION: The mold is a frustum of a cone 12 inches tall.



12. The slump test mold is shaped like:
A. A cylinder
B. A cube
C. A frustum of a cone
D. A cone
Answer: C
EXPLANATION: This shape aids in lifting the mold cleanly for accurate slump measurement.



13. How many layers is the slump mold filled in?
A. 2
B. 3
C. 4
D. 1
Answer: B
EXPLANATION: ASTM C143 requires filling the mold in three equal layers.



14. Each layer in the slump mold must be rodded how many times?
A. 10
B. 15
C. 25
D. 30

Document information

Uploaded on
June 12, 2025
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
144
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions