Power Engineering 3B1 Chapter 15
Questions with Complete Solutions
(Latest 2025)
__________ _______ are leak proof containers that have an
internal or external operating pressure.
a. Pressure vessels
b. Fired boilers
c. Fractionation towers
d. Milk cartons - Correct Answers ✅a. Pressure vessels
An unfired pressure vessel is a container having a design
pressure between ____ kPa and 20 685 kPa and does not
contain an integral source of heat.
a. 0
b. 103
c. 1000
d. 1500 - Correct Answers ✅b. 103
The ____________ is responsible for performing the design
calculations and making them available to the inspectors for
the jurisdiction and owner.
a. designer
b. operator
c. manufacturer
d. welder - Correct Answers ✅c. manufacturer
, Power Engineering 3B1 Chapter 15
Questions with Complete Solutions
(Latest 2025)
In accordance with provincial regulations, the _____ is
generally responsible for ensuring that equipment has been
inspected by a jurisdiction inspector before it is placed into
service.
a. designer
b. operator
c. manufacturer
d. owner - Correct Answers ✅d. owner
The ___________ standard takes precedence over the ASME
Code, if a conflict exists.
a. CSA B-51
b. CSA B-52
c. Inspectors
d. Owners - Correct Answers ✅a. CSA B-51
Once the construction of the pressure vessel has been
completed, the manufacturer attaches a ___________ to the
vessel and completes and certifies the vessel data report.
a. pressure
b. nameplate
c. seal
d. signature - Correct Answers ✅b. nameplate
Questions with Complete Solutions
(Latest 2025)
__________ _______ are leak proof containers that have an
internal or external operating pressure.
a. Pressure vessels
b. Fired boilers
c. Fractionation towers
d. Milk cartons - Correct Answers ✅a. Pressure vessels
An unfired pressure vessel is a container having a design
pressure between ____ kPa and 20 685 kPa and does not
contain an integral source of heat.
a. 0
b. 103
c. 1000
d. 1500 - Correct Answers ✅b. 103
The ____________ is responsible for performing the design
calculations and making them available to the inspectors for
the jurisdiction and owner.
a. designer
b. operator
c. manufacturer
d. welder - Correct Answers ✅c. manufacturer
, Power Engineering 3B1 Chapter 15
Questions with Complete Solutions
(Latest 2025)
In accordance with provincial regulations, the _____ is
generally responsible for ensuring that equipment has been
inspected by a jurisdiction inspector before it is placed into
service.
a. designer
b. operator
c. manufacturer
d. owner - Correct Answers ✅d. owner
The ___________ standard takes precedence over the ASME
Code, if a conflict exists.
a. CSA B-51
b. CSA B-52
c. Inspectors
d. Owners - Correct Answers ✅a. CSA B-51
Once the construction of the pressure vessel has been
completed, the manufacturer attaches a ___________ to the
vessel and completes and certifies the vessel data report.
a. pressure
b. nameplate
c. seal
d. signature - Correct Answers ✅b. nameplate