AAAE CM Module 2 (Answered)2025/2026 WITH VERIFIED SOLUTIONS
AAAE CM Module 2 (Answered)2025/2026 WITH VERIFIED SOLUTIONS NPIAS - Answer Federal plan for airports, addresses development and planning on projects eligible for AIP. State Aviation System Plans - Answer more detailed on how airports within a state can meet states needs Metropolitan or Regional System Plans - Answer more specific indexable and consider capacity, intermodal access and local travelers Airport Areas - Answer Airside, Landside Landside - Answer intermodal access,parking, rental cars ticketing, bag claims, etc Airside Areas - Answer Runways, taxiways, fence, etc.AAAE CM Module 2 (Answered)2025/2026 WITH VERIFIED SOLUTIONS ALP-Grant Assurance 29 - Answer requires ALP be updated at all times, shows land, terminal and facilities. protection zones, approach areas, proposed development and unusual design features ALP Contents - Answer Standard ALP contains following: 1 Cover sheet-signature blocks, and location maps 2 ALP Sheet-data of existing and fyture airfield layout 3 Airport Layout Drawing 4 Airport Airspace Drawing-intended to show imaginary surfaces 5 Inner Portion of Approach Drawing-profile view of runway approaches and obstructions and surfaces associated with the Terminal Instrment Procedures (TERPS)AAAE CM Module 2 (Answered)2025/2026 WITH VERIFIED SOLUTIONS 6 Terminal Area Drawing-and plan depicting terminal and surrounding facilities and heights. lighting and obstructions, also highway routes to and from airport and main business district 7 Land Use Drawing-on Airport and off airport depicting existing and recommended use of all land with property line to at least the 65 DNL noise contours 8 Runway Departure Surfaces Drawing-depicts available departure surfaces 9 Airport Property Map-how tracts were acquired and easements, termed EXHIBIT A on AIP grant applications 10 Data sheet-airport and runway data tables and wind rose(diagram showing percentage of time wind blows from a direction and speed) 11. Facilities layout-exisisting and future facilities 12 Utilities drawing-location and capacity of utilities 13 Airport access plan-major routes and modes of transportation that serve airport
Written for
- Institution
- AAAE CM Module 2
- Course
- AAAE CM Module 2
Document information
- Uploaded on
- June 7, 2025
- Number of pages
- 88
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aaae cm module 2 answered with verified
Document also available in package deal