PMT 4800V PRACTICE EXAM | 164
QUESTIONS | WITH COMPLETE
SOLUTIONS!!
, Research and Development (R&D)
Operations and Support Costs
Costs
Don't know?
2 of 163
Term
The _______ refers to the cost of procuring prime mission equipment.
Give this one a try later!
Flyaway Cost Life Cycle Cost
Development Cost Weapon System Cost
Don't know?
, 3 of 163
Term
The Army receives proposals from eight different companies in
response to a Request for Proposal (RFP). The Contracting Officer
has identified the most highly rated proposals, determined the
competitive range, and wants to get the offerors' best and final
proposals. What type of information exchange would the
Contracting Officer use to get the information needed to allow the
offerors to revise their proposals?
Give this one a try later!
Communications Clarifications
Discussions Solicitations
Don't know?
4 of 163
Term
What system engineering process establishes and maintains the
consistency of a system's functional, performance and physical
attributes with its requirements, design and operational information
and allows technical insight into all levels of the system design
throughout the system's life cycle?
, Give this one a try later!
Configuration Management Traceability Control
Product Control System Support Management
Don't know?
5 of 163
Term
The Army is testing a laser guided rifle to assess the system's
lethality. What type of testing is this?
Give this one a try later!
Live Fire Test & Evaluation Operational Test and Evaluation
(LFT&E) (OT&E)
Follow-on Operational Test and Developmental Test & Evaluation
Evaluation (FOT&E) (DT&E)
Don't know?
6 of 163
Term
QUESTIONS | WITH COMPLETE
SOLUTIONS!!
, Research and Development (R&D)
Operations and Support Costs
Costs
Don't know?
2 of 163
Term
The _______ refers to the cost of procuring prime mission equipment.
Give this one a try later!
Flyaway Cost Life Cycle Cost
Development Cost Weapon System Cost
Don't know?
, 3 of 163
Term
The Army receives proposals from eight different companies in
response to a Request for Proposal (RFP). The Contracting Officer
has identified the most highly rated proposals, determined the
competitive range, and wants to get the offerors' best and final
proposals. What type of information exchange would the
Contracting Officer use to get the information needed to allow the
offerors to revise their proposals?
Give this one a try later!
Communications Clarifications
Discussions Solicitations
Don't know?
4 of 163
Term
What system engineering process establishes and maintains the
consistency of a system's functional, performance and physical
attributes with its requirements, design and operational information
and allows technical insight into all levels of the system design
throughout the system's life cycle?
, Give this one a try later!
Configuration Management Traceability Control
Product Control System Support Management
Don't know?
5 of 163
Term
The Army is testing a laser guided rifle to assess the system's
lethality. What type of testing is this?
Give this one a try later!
Live Fire Test & Evaluation Operational Test and Evaluation
(LFT&E) (OT&E)
Follow-on Operational Test and Developmental Test & Evaluation
Evaluation (FOT&E) (DT&E)
Don't know?
6 of 163
Term