On the shoulder adjacent to traffic being controlled correct answers The work zone starts at the
first advance warning sign; therefore, where should the flagger stand when directing traffic in a
TTC zone?
three correct answers How many orange and black TTC signs should there be in each direction
on a 2-way, 2-lane rural roadway?
500 ft. correct answers What should the sign spacing be on a two-lane, two-way rural highway?
350 ft correct answers How many feet apart should the advanced warning signs be on a high
speed urban roadway?
on the left hand side of the highway correct answers For additional emphasis on a high speed
urban roadway, signs may be posted: _________
The distance required to safely route traffic from one lane to another correct answers Taper
length refers to:
speed and width of lane closed correct answers taper length is based on:
equal in feet to the speed limit correct answers in a taper, the maximum distance between
channelizing devices should be:
traffic should pass to the left correct answers on a barricade, if the stripes start at the upper right
side and angle down to the lower left side: ________
at least 28" tall and retroreflectorized with at least two white bands and two orange bands correct
answers at night and/or on high speed roads greater than 45 mph, cones shall be: __________
, at the beginning of the taper correct answers one a rural two-lane road, where would you place
the flagger in respect to the beginning of the taper for a closed lane?
1) Type of work to be done
2) traffic volume
3) traffic speed
4) school bus routes correct answers What are some factors that should be considered in
formulating a TTC plan?
diversion correct answers the rerouting of traffic onto a temporary bypass road is known as a:
__________
removed by grinding correct answers pavement markings no longer needed should be:
routinely correct answers a TTC zone should be checked:
Standard Statement correct answers in the MUTCD a mandatory condition is a:
a statement of a permissive condition correct answers in the mutcd an option is:
temporary traffic control plan correct answers A TTC plan is a:
typical application drawings correct answers A TTC plan should include:
be trained and/or certified correct answers The MUTCD states that individuals responsible for
the implementation of TTC measures should: