NCCCO CORE
1. What is prohibited by OSHA 1926 Subpart cc regarding Splicing
wire rope on a crane?
2. What should be of major concern when considering Voids, tanks, loose fill, de-
surfaces for crane set up locations? pressions
3. Which items are included in the suspended weight Load weight, rigging, load
when calculating parts of line? block
4. What site condition must an operator be concerned Soil stability must be suffi-
about prior to setting up a crane? cient
5. What is an example of duty cycle crane operations? High speed concrete
placement
6. Where must barriers be erected in accessible areas to Within the equipment's
provide protection in the cranes work area? rotating superstructure
7. According to ASME B30.5, How frequently is a crane Every 3 years
operator required to have a physical?
8. What is the result of rapid hoist acceleration? Produces hook loads
higher than actual weight
9. Wire rope lubricant should not: hinder visual inspection
10. On what principle is crane stability based? leverage
11. Who must confirm that an overhead power line is Line owner
de-energized?
12. The use of equipment to hoist personnel is prohibited Other methods would be
except where the employer can demonstrate what? more hazardous
13.
1/9
, NCCCO CORE
Which of the following would not cause the effect of D. Graduated lever control
impact loading on the crane? application
A. Sudden snatching of the load
B. Rapid hoist acceleration
C. High boom angle operations in windy conditions
D. Graduated lever control application
14. According to OSHA 1926 subpart cc, How frequently Each shift
must operational aides be checked?
15. What is the minimum number of parts of line required 4
to lift a load that weighs 38,588 lbs. ?
16. Which factor is the most important to consider about Compaction of approach
site access? roads
17. What is one purpose of the load moment indicator? To warn the operator of an
overload condition
18. How are construction site hazards and restrictions lo- A pre-operational work
cated and identified? site inspection
19. How many calendar days may a crane work with a 7
broken anti two-block devise, after receipt of the parts?
20. According to OSHA 1926 subpart cc, when employees Hooks with self closing
are engaged in hooking and unhooking loads in the latch
fall zone, what type of hook must be used?
21. What is the purpose of the working area diagram? To identify operational
quadrants
22. 5
2/9
1. What is prohibited by OSHA 1926 Subpart cc regarding Splicing
wire rope on a crane?
2. What should be of major concern when considering Voids, tanks, loose fill, de-
surfaces for crane set up locations? pressions
3. Which items are included in the suspended weight Load weight, rigging, load
when calculating parts of line? block
4. What site condition must an operator be concerned Soil stability must be suffi-
about prior to setting up a crane? cient
5. What is an example of duty cycle crane operations? High speed concrete
placement
6. Where must barriers be erected in accessible areas to Within the equipment's
provide protection in the cranes work area? rotating superstructure
7. According to ASME B30.5, How frequently is a crane Every 3 years
operator required to have a physical?
8. What is the result of rapid hoist acceleration? Produces hook loads
higher than actual weight
9. Wire rope lubricant should not: hinder visual inspection
10. On what principle is crane stability based? leverage
11. Who must confirm that an overhead power line is Line owner
de-energized?
12. The use of equipment to hoist personnel is prohibited Other methods would be
except where the employer can demonstrate what? more hazardous
13.
1/9
, NCCCO CORE
Which of the following would not cause the effect of D. Graduated lever control
impact loading on the crane? application
A. Sudden snatching of the load
B. Rapid hoist acceleration
C. High boom angle operations in windy conditions
D. Graduated lever control application
14. According to OSHA 1926 subpart cc, How frequently Each shift
must operational aides be checked?
15. What is the minimum number of parts of line required 4
to lift a load that weighs 38,588 lbs. ?
16. Which factor is the most important to consider about Compaction of approach
site access? roads
17. What is one purpose of the load moment indicator? To warn the operator of an
overload condition
18. How are construction site hazards and restrictions lo- A pre-operational work
cated and identified? site inspection
19. How many calendar days may a crane work with a 7
broken anti two-block devise, after receipt of the parts?
20. According to OSHA 1926 subpart cc, when employees Hooks with self closing
are engaged in hooking and unhooking loads in the latch
fall zone, what type of hook must be used?
21. What is the purpose of the working area diagram? To identify operational
quadrants
22. 5
2/9