• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

Nccco Test

Document preview thumbnail
Preview 2 out of 13 pages

Exam of 13 pages for the course Nccco at Nccco (NCCCO Test)

Content preview

NCCCO Test

1. ancillary attach- devices attached to the crane that perform functions other than lifting a load with
ment a hook, such as forks, augers, grapples, or a digging bucket

2. anti-two block de- a device that prevents two blocking from occurring if crane is used with load hoist
vice mechanism

3. column (mast) the vertical structure of the crane between the inner(main) boom and base
*TQ

4. designated per- a person selected or assigned by the employer or employers representative as
son being competent to perform specific duties

5. extension cylin- the hydraulic cylinders used to extend and react boom extensions
ders

6. gross capacity the capacity listed on the cranes load chart
*no deductions

7. load radius (ABC) the horizontal distance from the center line of the cranes rotation to the center of
*TQ gravity of the load
*articulating boom crane

8. load radius (ABL) the horizontal distance from the center of the cranes rotation to the center of the
rotator
*articulating boom loader

9. net capacity the total weight a crane may lift after the load handling deductions have been
subtracted from the gross capacity
*net after deduction

10. general safely 1. a fire extinguisher (min 5.BC rating) must be maintained on the crane or vehicle
precautions *TQ at all times
2. Do not refuel the vehicle while the engine is running



, NCCCO Test

11. general precau- 1. control function labels must be legible
tions of control 2. ensure that controls return freely to their neutral position before engaging
systems :check power source
for the following 3. ensure that o reload protection (OLP) systems have not been compromised
*TQ

12. Manual control 1. flooring of elevated stand-up platforms must be made of slip-resistant material
systems: check 2. elevated stand-up platforms must have designated handholds to access and
for the following egress the platform. do not use controls to hoses as handholds
3. TQ**** use three-point contact (both feet and one hand, or both hands and one
foot) for access and egress of elevated platforms

13. cable and remote 1. to prevent unauthorized operation, switch the remote OFF and remove the key
controls: check when not in use
for the following 2. never walk backwards when using the remote control
*TQ

14. top set control only one person may occupy the operators station area (except during training)
station *TQ

15. ancillary attach- 1. do not exceed the load rating of the attachment; note that the attachments load
ments: general rating may bless than the cranes rating
precautions *TQ 2. account for any load handling deductions (Ex. weight of attachments)
3. when using pallet forms. make sure the fork tines are entered under the load to
balance the load and lift level
4. do not push down on the lifting attachment with the boom
5. do not allow lifting attachments to push upward on the boom
6. never lift personnel lifting device that is approved by the crane manufacturer and
is attached or pinned to the last boom extension

16. Articulating 1. use the right attachment for materials to be lifted
boom loader a d 2. the plastic supports on tieback of the fork must closely fit the load to prevent
fork shifting and damage the load

Document information

Uploaded on
June 4, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
codersimon
3.8
(87)
Sold
808
Followers
478
Items
6423
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions