m2-Which xof xthe xfollowing xis xnot xa xconstruction xschedule xmilestone: xa)
xsubmittal x
x
approval xb) xProject xDelivery xand xteam xselection xprocess xc)
xProcurement
(Bidding/negotiating/purchasing) xActivities. xd) xContract xCompletion x-
xCORRECT x
x
ANSWER-Project xDelivery xand xteam xselection
xprocess
x
m6-If xa xdate xto xproceed xis xnot xstipulated xin xthe xagreement, xthe xowner xshould xissue
xto xthe x
x
contractor xa: x- xCORRECT xANSWER-Notice xto
xProceed
x
m6-Pre-construction xActivities xBegin xwhen xthe xcontractor xhas xreceivedL x-
xCORRECT x
x
ANSWER-A xLetter xof xIntent xto
xAward
x
m6-Which xof xthe xfollowing xis xnot xa xmobilization xand xStart xup xcost x-
xCORRECT x
x
ANSWER-Royalties, xLicenses xand
xFees
x
m6-It xis ximportant xto xestablish xthe xsite xconditions xprior xto: x- xCORRECT
xANSWER-
x
mobilization
x
m6-Mobilization xtypically xoccurs xafter: x- xCORRECT xANSWER-Receipt xof xa xnotice
xto x
x
proceed xand xfollowing xa xreconstruction
xmeeting
x
m6-Which xtwo xtypes xof xbonds xmight xbe xrequired xduring xconstruction x-
xCORRECT x
x
ANSWER-Performance xBond xand xBid
xBond
x
m6-Inspections xare xdone xby xthe xAHJ xto xdetermine xif xthe xconstruction xcomplies
xwith x-
x
CORRECT xANSWER-Codes xand
xRegulations
,x
m6-The xcontractor xShould xbeing xPreparation xand xDelivery xfor xthe xPre-
construction x
x
Submittals xafter xwhich xEvent x- xCORRECT xANSWER-Execution xof
xAgreement
x
m6-Payment xand xPerformance xbonds xare xwhich xtype xof xdocument x-
xCORRECT x
x
ANSWER-Pre-construction
xSubmittal
x
m6-It xis ximportant xfor xsubcontract xand xpurchase xorder xdocuments xto xreference
xthe x-
x
CORRECT xANSWER-contract
xdocuments
x
m6-Which xtwo xParties xare xresponsible xfor xsubmittal xof xa xset xof xconstruction
xdocuments x
x
tot xhe xAHJ xfor xpermit xreview x- xCORRECT xANSWER-Owner xand
xArchitect
x
m6-What xis xtypically xthe xcontractor's xfirst xactivity xon xthe xproject xsite x-
xCORRECT x
x
ANSWER-
Mobilization
x
m7According xto xthe xAIA xA201 xThe xcontractor xhas xsole xresponsibility xand xcontrol
xover x
x
the xfollowing xconstruction xactivities x- xCORRECT xANSWER-Means,
xmethods,
x
techniques, xsequences, xprocedures, xcoordination, xjob xsite
xsafety
x
m7The xresponsibility xof xinspecting xwork xalready xperformed xfor xproper xconditions
xto x
x
receive xsubsequent xwork xlies xwith xthe x- xCORRECT xANSWER-
Contractor
x
M7- xThe xcontractor's xsuperintendent: x- xCORRECT xANSWER-Can xnot xbe
xchanged x
x
without xthe xowners xconsent xand xcommunication xis xas xbinding xas xif xgiven xby
xthe
x
contractor
x
m7- xTrue xor xFalse x- xby xexecuting xthe xcontract xthe xcontractor xconfirms xthat xthe
xcontract x
, x
time xis xreasonable x- xCORRECT xANSWER-
True
x
m7- xThe xdate xof xsubstantial xcompletion xis xestablished xby xthe x- xCORRECT
xANSWER-
x
A/E
x
`m7- xUnder xA201 xwho xhas xthe xresponsibility xto xpay xsales, xconsumer, xuse xand
xsimilar x
x
taxes xfor xthe xwork xprovided? x- xCORRECT xANSWER-
contractor
x
m-7If xthe xcontractor xis xdelayed xin xthe xprogress xof xthe xwork xby xthe xowner xthe
xcontractor xshould: x- xCORRECT xANSWER-Write xthe xA/E xrequesting xa xchange xorder
xgranting xan xextension xof xtime. x
x
m7- xProduct xequivalency, xmanufacturer, xinstallation, xoperating xcost, xmaintenance
xcosts, x
and xwarranty xare xmajor xfactors xto xbe xconsidered xfor: x- xCORRECT
xANSWER-
x
Substitution
xRequest
x
m7- xAll xof xthe xfollowing xmy xbe xaccomplished xthrough xissuing xchange xorder xexcept
xwhich xone? xa) xChange xin xbid xdate. xb)Decrease xin xcontract xcost. xc)Extension xof
xContract xtime. xd) xReduction xin xScope xof xwork. x- xCORRECT xANSWER-a xChange xin
xbid xdate. x
x
m7 x- xAll xof xthe xfollowing xare xdefined xas xa xcontract xmodification xexcept xwhich xone? x
a)change xorder xb) xConstruction xchange xDirective/work xchange xdirective xc)Architect's
xsupplemental xinstructions/field xorder xd) xAddendum x- xCORRECT xANSWER-
addendum x
x
m7Under xAIA x201, xwho xhas xthe xauthority xto xstop xwork, xif xnonconforming xwork xfails
xto xbe x
x
corrected? x- xCORRECT xANSWER-
Owner
x
m7-Drawings xprepared xby xthe xcontractor x,subcontractor, xor xmaterial xsupplier xthat
xshows x
x
how xa xparticular xaspect xof xthe xwork xis xto xbe xfabricated xand xinstalled xare
xcalled: x-
x
CORRECT xANSWER-Shop
xDrawings
x
m7-Standard xgeneral xconditions xare xpublished xby xall xof xthe xfollowing xexcept: xa) xAIA
xb) x