x x x x x
ANSWERS (SOLVED) x x
x
x
1. xThe xmethod xof xcomputation xof xContractor's xoverhead xand xprofits xfor xChange
xOrder x
x
prices, xwhere xboth xadditions xand xdeletions xare xinvolved, xis xfound xin
xthe:
x
a)
xAgreement.
x
b) xConditions xof xthe
xContract.
x
c) xDivision
x01.
x
d) xInstructions xto xBidders. x- xCORRECT xANSWER-b) xConditions xof xthe
xContract.
x
x
2. xGeneral xRequirements xare xpart
xof:
x
a) xSupplementary
xConditions.
x
b) xBidding
xRequirements.
x
c)
xSpecifications.
d) xSummary xof xWork. x- xCORRECT x ANSWER-c)
xSpecifications.
x
3. xThe xthree xessential xconsiderations xin xthe xevaluation xof xa xproduct xare: x
a) Requirements, xCriteria, xand xTests. x
b) Costs, xMaintenance, xand xInstallation. x
c) Life xCycle xCost, xInstallation xCost, xand xMaintenance xCost. x
d) Case xstudies, xFailures, xand xProblems. x- xCORRECT xANSWER-a) xRequirements,
xCriteria, xand xTests. x
x
x
4. xWhose xresponsibility xis xit xto xfurnish xthe xShop
xDrawings?
x
a) xThe
xArchitect/Engineer
x
b) xThe
xContractor
x
c) xThe
xOwner
,d) xThe xSubcontractor x - x CORRECT x ANSWER-b) x The
xContractor
x
5. xThe xdivision xof xthe xWork xamong xmultiple xprime xContracts xis xdescribed
xin:
x
a) xInstructions xto
xBidders.
x
b) xSupplementary
xConditions.
x
c) xDivision
x01.
x
d) xSpecial xConditions. x- xCORRECT xANSWER-c) xDivision
x01.
x
6. xDuring xthe xProject xConception xStage, xthe xA/E xmay xbe xretained xto: x
a) Develop xoutline xspecifications x
b) Describe xthe xcharacter xof xthe xmechanical xsystem x
c) Prepare xrenderings x
d) Assist xin xfinancial xfeasibility xstudies x- xCORRECT xANSWER-d) xAssist xin xfinancial
xfeasibility xstudies x
x
7. xWhat xis xthe xmain xpurpose xof xMasterFormat? x
a) for xscheduling, xvalue xmanagement, xrecording xof xdesign xdata xand xmanaging xcosts.
x
b) used xduring xthe xplanning xstage xof xa xproject. x
c) to xorganize xthe xProject xManual, xreference xkeynotes xand xdetailed xcost xestimates. x
d) when xthere xis xa xstandardized xneed xfor xinformation xto xappear xupon xeach xpage xof
xa xproject xmanual. x- xCORRECT xANSWER-c) xto xorganize xthe xProject xManual,
xreference xkeynotes xand xdetailed xcost xestimates. x
x
8. xThe xperson xwho xbecomes xsecondarily xliable xfor xanother's xdebt xor xperformance xis
xcalled xthe: x
a) Guarantee x
b) Warrantor x
c) Guarantor x
d) Warrantee x- xCORRECT xANSWER-c) xGuarantor x
x
9. xIntegrated xprojects xare xdistinguished xby xall xof xthe xfollowing xcharacteristics xexcept:
x
a) Development xof xvirtual xproject xmodel xthrough xinput xfrom xa xcollaborative xteam x
b) Trust-based xcollaboration xbetween xproject xteam xmembers x
c) Maximized xefficiency xthrough xdesign, xfabrication, xand xconstruction x
d) "Just xas xneeded" xteam xinvolvement xto xreduce xowner's xpre-construction xexpenses
x- xCORRECT xANSWER-d) x"Just xas xneeded" xteam xinvolvement xto xreduce xowner's
xpreconstruction xexpenses x
x
, x
10. xOutline xSpecifications xare xwritten
xfor
x
a) xonly xDivisions x02-14 xwhere xactual xproducts xare
xdiscussed x
x
b) xDivisions x01-
49
c) xonly xDivisions x01-14 x(excluding xmechanical xand
xelectrical)
d) xthe xexclusive xuse xof xthe xA/E x- xCORRECT xANSWER-b) xDivisions
x01-49
x
11. xAn xexample xof xa xMasterFormat xLevel x3 xspecification xSection xis: x
a) 05 x00 x00 xMetals. x
b) 05 x20 x00 xMetal xJoists. x
c) 05 x21 x00 xSteel xJoist xFraming. x
d) 05 x21 x19 xOpen xWeb xSteel xJoist xFraming. x- xCORRECT xANSWER-d) x05 x21 x19
xOpen xWeb xSteel xJoist xFraming. x
x
12. xWhat xactivities xtake xplace xin xthe xProject xConception xStage? x
a) The xengineers xdevelop xthe xmechanical xand xelectrical xsystems. x
b) The xsite xis xselected xand xthe xdemolition xis xdone. x
c) Feasibility xstudies xand xbudget xis xset. x
d) The xprogram xis xevaluated xand xthe xengineers xare xselected. x- xCORRECT
xANSWER-c) xFeasibility xstudies xand xbudget xis xset. x
x
13. xThe xdocument xrecommended xto xorganize xpreliminary xconstruction xinformation
xinto xa x
x
standard xorder xon xthe xbasis xof xsystems xand xassemblies
xis:
x
a)
xMasterFormat
x
b)
xUniformat
x
c) xOutline
xSpecifications
d) xProject xManual x- xCORRECT xANSWER-b)
xUniformat
x
14. xAll xdesign xand xconstruction xdrawings xcan xbe xclassified xas xone xof xtwo xtypes xof
xviews: xa) xNumeric xand xgraphic. x
b) Vertical xand xhorizontal. x
c) Scaled xand xnonscaled. x x
d) Exterior xand xinterior. x- xCORRECT xANSWER-c) xScaled xand xnonscaled. x
x
15. xSubstitution xrequirements xand xprocedures xduring xbidding x