CM 210 EXAM 1 STUDY GUIDE

Content preview

CM 210 EXAM 1 STUDY GUIDE
Design-Build - Answers :A project delivery method in which there is only one contract
between the owner and a design-build entity. The design-builder is responsible for both
the design and the construction of the project. This method is often referred to as single-
source project delivery.

Design-Bid-Build - Answers :A project delivery method in which the owner holds two
separate contracts for design and construction. This method is often referred to as the
traditional project delivery method.

construction manager at risk - Answers :A delivery method which entails a commitment
by the Construction Manager (CM) to deliver the project within a Guaranteed Maximum
Price (GMP) which is based on the construction documents and specifications at the
time of the GMP plus any reasonably inferred items or tasks.

Integrated Project Delivery (IPD) - Answers :All participants collaborate closely from the
projects earliest conceptualization to move in. Owner has multiple agreements with
independent design and construction firms

Zoning Ordinance - Answers :• Degree/amount of building development
• Allowable uses; separate incompatible uses
• Safe and efficient transportation• Locations of parks and open space
• Promote aesthetics (e.g., facades and signs)
• Control development density

Building codes - Answers :International Residential Code (IRC)
International Building Code (IBC)

Fire resistance rating and types of construction - Answers :Type I - Fire-resistive
Type II - Non-combustible - steel/concrete
Type III - Ordinary - mix of combustible and non
Type IV - Heavy timber construction
Type V - Wood-framed

Area of refuge - Answers :provides protection from fire or smoke for individuals who
cannot use stairs/elevators while awaiting emergency personnel

Public Way - Answers :the area outside a building, between the ExitDischarge and a
Public Street. Must have a minimum clearwidth of 10'

Occupancy loads - Answers :Example - Dormitories 50 gross1 2' x 12' = 144 sf / 50 =
2.88 = 3 occupants

Americans with Disabilities Act (ADA) - Answers :comprehensive civil rights protections
to individuals with disabilities...public accommodations ,transportation.

, Ensure that individuals with disabilities are not excluded from services, programs and
activities because buildings are inaccessible

draw vs design - Answers :a drawing is a tool
design is an idea

Soil Moisture Content - Answers :reflects the amount of water in the soil

Soil testing - Answers :determining what contents the soil is made up of, stone, gravel,
sand, silt, etc.

Sloped soil - Answers :Soil that sloped down to the bottom of a job site

benched soil - Answers :soil that is benched and different elevation platforms are made

shored soils - Answers :vertical walls of soil, shoring is used to hold to it up

Soil volume - Answers :how dense the soil is, increases after soil is excavated

Soil Load Bearing Capacity - Answers :Maximum amount of pressure a foundation soil
can bear without harmful settlement

Footings - Answers :The base of a foundation wall or column, which is wider to provide
a larger bearing surface

Grade Beam - Answers :A reinforced concrete beam that transmits the load from a
bearing wall into a spaced foundation such as pile caps or caissons.

Slab Foundation - Answers :A flat, poured concrete foundation that is just a few inches
above the surface of the ground

Mat Foundation - Answers :A large footing under an entire building, which distributes
the building load over the entire area. It is also known as 'raft foundation'.

piling - Answers :A type of foundation system that uses a column to support the loads of
the structure.

Displacement Piles - Answers :a foundation system that dislodges soils radially and
vertically as a slender wood, steel or pre-cast concrete pile shaft is driven, or
mechanically vibrated into the ground

Non-Displacement Piles - Answers :Piles formed by boring or other methods of
excavation. H, open-end pipe and sheet piles are considered low-displacement piles.
Excavation, soil is removed.

Document information

Uploaded on
May 28, 2025
Number of pages
13
Written in
2024/2025
Type
Other
Person
Unknown
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(380)
Sold
2242
Followers
1451
Items
63884
Last sold
23 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions