CM 210 EXAM 1 STUDY GUIDE
Design-Build - Answers :A project delivery method in which there is only one contract
between the owner and a design-build entity. The design-builder is responsible for both
the design and the construction of the project. This method is often referred to as single-
source project delivery.
Design-Bid-Build - Answers :A project delivery method in which the owner holds two
separate contracts for design and construction. This method is often referred to as the
traditional project delivery method.
construction manager at risk - Answers :A delivery method which entails a commitment
by the Construction Manager (CM) to deliver the project within a Guaranteed Maximum
Price (GMP) which is based on the construction documents and specifications at the
time of the GMP plus any reasonably inferred items or tasks.
Integrated Project Delivery (IPD) - Answers :All participants collaborate closely from the
projects earliest conceptualization to move in. Owner has multiple agreements with
independent design and construction firms
Zoning Ordinance - Answers :• Degree/amount of building development
• Allowable uses; separate incompatible uses
• Safe and efficient transportation• Locations of parks and open space
• Promote aesthetics (e.g., facades and signs)
• Control development density
Building codes - Answers :International Residential Code (IRC)
International Building Code (IBC)
Fire resistance rating and types of construction - Answers :Type I - Fire-resistive
Type II - Non-combustible - steel/concrete
Type III - Ordinary - mix of combustible and non
Type IV - Heavy timber construction
Type V - Wood-framed
Area of refuge - Answers :provides protection from fire or smoke for individuals who
cannot use stairs/elevators while awaiting emergency personnel
Public Way - Answers :the area outside a building, between the ExitDischarge and a
Public Street. Must have a minimum clearwidth of 10'
Occupancy loads - Answers :Example - Dormitories 50 gross1 2' x 12' = 144 sf / 50 =
2.88 = 3 occupants
Americans with Disabilities Act (ADA) - Answers :comprehensive civil rights protections
to individuals with disabilities...public accommodations ,transportation.
, Ensure that individuals with disabilities are not excluded from services, programs and
activities because buildings are inaccessible
draw vs design - Answers :a drawing is a tool
design is an idea
Soil Moisture Content - Answers :reflects the amount of water in the soil
Soil testing - Answers :determining what contents the soil is made up of, stone, gravel,
sand, silt, etc.
Sloped soil - Answers :Soil that sloped down to the bottom of a job site
benched soil - Answers :soil that is benched and different elevation platforms are made
shored soils - Answers :vertical walls of soil, shoring is used to hold to it up
Soil volume - Answers :how dense the soil is, increases after soil is excavated
Soil Load Bearing Capacity - Answers :Maximum amount of pressure a foundation soil
can bear without harmful settlement
Footings - Answers :The base of a foundation wall or column, which is wider to provide
a larger bearing surface
Grade Beam - Answers :A reinforced concrete beam that transmits the load from a
bearing wall into a spaced foundation such as pile caps or caissons.
Slab Foundation - Answers :A flat, poured concrete foundation that is just a few inches
above the surface of the ground
Mat Foundation - Answers :A large footing under an entire building, which distributes
the building load over the entire area. It is also known as 'raft foundation'.
piling - Answers :A type of foundation system that uses a column to support the loads of
the structure.
Displacement Piles - Answers :a foundation system that dislodges soils radially and
vertically as a slender wood, steel or pre-cast concrete pile shaft is driven, or
mechanically vibrated into the ground
Non-Displacement Piles - Answers :Piles formed by boring or other methods of
excavation. H, open-end pipe and sheet piles are considered low-displacement piles.
Excavation, soil is removed.
Design-Build - Answers :A project delivery method in which there is only one contract
between the owner and a design-build entity. The design-builder is responsible for both
the design and the construction of the project. This method is often referred to as single-
source project delivery.
Design-Bid-Build - Answers :A project delivery method in which the owner holds two
separate contracts for design and construction. This method is often referred to as the
traditional project delivery method.
construction manager at risk - Answers :A delivery method which entails a commitment
by the Construction Manager (CM) to deliver the project within a Guaranteed Maximum
Price (GMP) which is based on the construction documents and specifications at the
time of the GMP plus any reasonably inferred items or tasks.
Integrated Project Delivery (IPD) - Answers :All participants collaborate closely from the
projects earliest conceptualization to move in. Owner has multiple agreements with
independent design and construction firms
Zoning Ordinance - Answers :• Degree/amount of building development
• Allowable uses; separate incompatible uses
• Safe and efficient transportation• Locations of parks and open space
• Promote aesthetics (e.g., facades and signs)
• Control development density
Building codes - Answers :International Residential Code (IRC)
International Building Code (IBC)
Fire resistance rating and types of construction - Answers :Type I - Fire-resistive
Type II - Non-combustible - steel/concrete
Type III - Ordinary - mix of combustible and non
Type IV - Heavy timber construction
Type V - Wood-framed
Area of refuge - Answers :provides protection from fire or smoke for individuals who
cannot use stairs/elevators while awaiting emergency personnel
Public Way - Answers :the area outside a building, between the ExitDischarge and a
Public Street. Must have a minimum clearwidth of 10'
Occupancy loads - Answers :Example - Dormitories 50 gross1 2' x 12' = 144 sf / 50 =
2.88 = 3 occupants
Americans with Disabilities Act (ADA) - Answers :comprehensive civil rights protections
to individuals with disabilities...public accommodations ,transportation.
, Ensure that individuals with disabilities are not excluded from services, programs and
activities because buildings are inaccessible
draw vs design - Answers :a drawing is a tool
design is an idea
Soil Moisture Content - Answers :reflects the amount of water in the soil
Soil testing - Answers :determining what contents the soil is made up of, stone, gravel,
sand, silt, etc.
Sloped soil - Answers :Soil that sloped down to the bottom of a job site
benched soil - Answers :soil that is benched and different elevation platforms are made
shored soils - Answers :vertical walls of soil, shoring is used to hold to it up
Soil volume - Answers :how dense the soil is, increases after soil is excavated
Soil Load Bearing Capacity - Answers :Maximum amount of pressure a foundation soil
can bear without harmful settlement
Footings - Answers :The base of a foundation wall or column, which is wider to provide
a larger bearing surface
Grade Beam - Answers :A reinforced concrete beam that transmits the load from a
bearing wall into a spaced foundation such as pile caps or caissons.
Slab Foundation - Answers :A flat, poured concrete foundation that is just a few inches
above the surface of the ground
Mat Foundation - Answers :A large footing under an entire building, which distributes
the building load over the entire area. It is also known as 'raft foundation'.
piling - Answers :A type of foundation system that uses a column to support the loads of
the structure.
Displacement Piles - Answers :a foundation system that dislodges soils radially and
vertically as a slender wood, steel or pre-cast concrete pile shaft is driven, or
mechanically vibrated into the ground
Non-Displacement Piles - Answers :Piles formed by boring or other methods of
excavation. H, open-end pipe and sheet piles are considered low-displacement piles.
Excavation, soil is removed.