• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

CM 4211 EXAMS SET 2025/2026 QUESTIONS WITH ANSWERS TAGGED A+

Document preview thumbnail
Preview 3 out of 17 pages

CM 4211 EXAMS SET 2025/2026 QUESTIONS WITH ANSWERS TAGGED A+

Content preview

CM 4211 EXAMS SET 2025/2026 QUESTIONS WITH
ANSWERS TAGGED A+
✔✔T - ✔✔If the owner's field rep. is not authorized to issue change orders, a contractor
who performs such a change may not get paid for the change work

✔✔T - ✔✔A construction change is a change to the work ordered by the owner but
which the owner feels does not require a change order

✔✔T - ✔✔A constructive change requires prompt notice by the contractor to the owner
to allow the contractor to get paid for the change work

✔✔T - ✔✔The force account method of equitable adjustment of cost when a change in
the work occurs requires daily records be kept of the change work agreed to by the
owner's representative on a daily basis

✔✔T - ✔✔On change work, the contractor may be entitled to impact costs in addition to
proximate costs provided that the contractor can prove such impact costs

✔✔T - ✔✔Failure of the owner to promptly investigate a differing site condition is a
breach of contract by the owner

✔✔T - ✔✔Prompt notification by the contractor to the owner of a differing site condition
may be waived by the courts if it is determined that the lack of notice did not prejudice
the rights of the owner

✔✔T - ✔✔An exculpatory clause in the contract relieving the owner from payment for
changes almost never outweighs a differing site conditions clause

✔✔T - ✔✔One of the stumbling blocks to recovery on a differing site conditions claim is
the keeping of adequate records to support the damage amount

✔✔T - ✔✔A differing site condition is one of the three main reasons for delays in
construction contracting

✔✔T - ✔✔A delay in the work may be caused by owner interference

✔✔T - ✔✔A compensable delay entitles the contractor to a cost and/or time adjustment

✔✔T - ✔✔A "take it or leave it" contract is a contract adhesion

✔✔T - ✔✔If work is delayed by the owner, but the contractor still completes the work
within the contract time limits, the contractor may be entitled to a cost adjustment

,✔✔T - ✔✔The two main reason of giving notice to the owner of a delay is to start the
delay time period and to give the owner time the opportunity to do something about the
delay, if possible

✔✔T - ✔✔Constructive notice is when the owner is charged with knowledge of a delay
even though the construction contractor does not give actual notice of the delay

✔✔T - ✔✔Liquidated damages are an agreed upon amount per day for each day that
the contract is finished after the adjusted completion date

✔✔T - ✔✔Liquidated damages are not a penalty

✔✔T - ✔✔Force majeure means a condition beyond the control of a party

✔✔T - ✔✔To support a claim for a time extension, a construction contractor must
support the claim by showing the delay was beyond its control and that it consumed
time affecting completion of the project

✔✔T - ✔✔Acceleration is the completion of contract work at a more rapid pace than
required by the contract

✔✔T - ✔✔Constructive acceleration is the forced completion of contract work in a
shorter period than should have been allowed by the issuance of a properly supported
contract time extension

✔✔T - ✔✔The failure of the owner to timely grant a time extension may result in
constructive acceleration

✔✔T - ✔✔Course of dealing is determined by how the owner and the construction
contractor performed on prior contracts

✔✔T - ✔✔Customs and trade practices are not considered when determining the clarity
of the express contract terms

✔✔T - ✔✔Reading the contract "as a whole" means that an interpretation must be
considered in context

✔✔T - ✔✔To prove course of dealing necessarily requires parole evidence

✔✔T - ✔✔The doctrine of contra proferentem is only considered a last resort

✔✔T - ✔✔The doctrine of contra proferentem states the contract will be construed
against the drafter of the document when all other manifestations do not resolve the
problem

, ✔✔T - ✔✔Documentation is another name for well kept job records

✔✔T - ✔✔The cardinal rule of good contract administration is to put it in writing

✔✔T - ✔✔Documentation is best when it is kept daily

✔✔T - ✔✔"He said she said" is an example of hearsay

✔✔T - ✔✔The writer of the documentation must have been present when the events in
the documentation were recorded and/or in a position to have accurate knowledge of
the events in order for the documentation to be introduced into evidence

✔✔T - ✔✔In order to introduce documentation into evidence it cannot have been
prepared for the specific purpose of use in litigation

✔✔T - ✔✔All documentation should answer the questions "when" and "what"

✔✔T - ✔✔A letter of transmittal does not require a response

✔✔T - ✔✔In a letter of notice, a position is taken as well as a basis for believing the
position is correct

✔✔T - ✔✔The job diary is a routine job record

✔✔T - ✔✔Risk can only be mitigated, not eliminated

✔✔T - ✔✔In order for a claim to be valid, it must be proven that the claimant is entitled
to an adjustment and the amount of the adjustment

✔✔T - ✔✔The most important provision regarding claims is the notice requirements

✔✔T - ✔✔If an owner does not timely respond to a contractor's claim, then he will be
deemed to have denied the claim

✔✔T - ✔✔If a construction contractor wins his claim, then mutual acceptance of
adjustments may be one of the three methods of resolving the claim

✔✔T - ✔✔"ORD" stands for "Owner Responsible Delay"

✔✔T - ✔✔"Force account" is another name for the "cost of work" method of resolving a
claim

✔✔T - ✔✔Impact costs are consequential costs not directly related to the work

Document information

Uploaded on
May 27, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.5
(41)
Sold
291
Followers
11
Items
36202
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions