• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

CM 4211 COMPREHENSIVE EXAMS 2025/2026 QUESTIONS WITH ANSWERS TAGGED A+

Document preview thumbnail
Preview 3 out of 24 pages

CM 4211 COMPREHENSIVE EXAMS 2025/2026 QUESTIONS WITH ANSWERS TAGGED A+

Content preview

CM 4211 COMPREHENSIVE EXAMS 2025/2026 QUESTIONS
WITH ANSWERS TAGGED A+
✔✔Heightened security is needed any time an attractive nuisance is involved? -
✔✔False

✔✔In the Hertz case, Boh Brothers settled with the driver of the Hertz vehicle? -
✔✔True

✔✔Contract liability is one of the main sources of liability in the construction industry? -
✔✔True

✔✔Statutory liability is one of the main sources of liability in the construction industry? -
✔✔True

✔✔Strict liability is a fourth source of liability. ? - ✔✔False

✔✔A tort liability cannot arise from the breach of an express provision in the contract? -
✔✔False

✔✔The attractive nuisance doctrine emanated from children playing in a railroad yard? -
✔✔True

✔✔OSHA has a separate section for just construction? - ✔✔True

✔✔The carpenter who stuck his hand through a duct hole was found to be
comparatively negligent? - ✔✔True

✔✔In the Hertz case, Boh Brothers was found liable even though it had "under
construction" signs displayed? - ✔✔True

✔✔Comparative negligence can totally prevent an injured person from winning a case?
- ✔✔False

✔✔Contract liability does not include a breach of an implied provision? - ✔✔False

✔✔Even though a construction site is an attractive nuisance, a borrow pit on the site is
not? - ✔✔False

✔✔The design-build contract reduces conflicts between the designer and the builder? -
✔✔True

,✔✔A cost-plus-a-fixed-fee contract encourages the contractor to finish as early as
possible? - ✔✔True

✔✔In a cost-reimbursable contract, the contractor is reimbursed for its costs and also
receives a fee? - ✔✔True

✔✔A prime contract is one that always involves the contractor? - ✔✔False

✔✔A construction manager is never hired by an owner until the design is complete? -
✔✔False

✔✔Engineers are usually involved in the design of commercial buildings? - ✔✔True

✔✔In a design-bid-build contract, the prime contractor is involved with the design? -
✔✔False

✔✔"Fast track" is when the contractor can start building part of the project while other
parts are still being designed? - ✔✔True

✔✔In a turnkey contract, the project is turned over to the owner complete so as to allow
the owner to turn the key and start using the facility? - ✔✔True

✔✔The owner determines the means, methods, techniques, sequences, and
procedures of the construction (unless the contract provides otherwise)? - ✔✔False

✔✔The "E" in A/E stands for an engineer? - ✔✔true

✔✔The contractor who contracts directly with the owner is a prime contractor? - ✔✔true

✔✔Fixed fee contracts are another name for lump sum contracts and are always done
for one lump sum amount.? - ✔✔false

✔✔A cost-plus-a-percentage-fee contract encourages the contractor to hold down on
costs? - ✔✔false

✔✔A design-bid-build is the traditional approach of a construction contract? - ✔✔true

✔✔A construction contract may be differentiated by the services provided? - ✔✔true

✔✔A cost-plus-an-incentive-fee contract encourages the contractor to hold down on
costs? - ✔✔true

, ✔✔The owner may have a prime contract on a construction project with a bank? -
✔✔true

✔✔A unit cost contract is a form of a fixed fee contract? - ✔✔true

✔✔A design only prime contract would involve the prime contractor? - ✔✔false

✔✔General conditions are conditions specific for a particular project? - ✔✔false

✔✔An advertisement should describe what the project is and where it is? - ✔✔true

✔✔An Invitation for Bids may not be used in lieu of an advertisement on private
projects? - ✔✔false

✔✔AIA form documents are not considered to be standard? - ✔✔false

✔✔Supplementary conditions are conditions common for many projects? - ✔✔false

✔✔Supplementary conditions may alter general conditions? - ✔✔true

✔✔Private projects often require more supplementary information than public bids? -
✔✔true

✔✔"One-of-a-kind" contracts are prepared for a particular project? - ✔✔true

✔✔It is unimportant in advertisement to identify the owner? - ✔✔false

✔✔Bid documents are always part of the contract documents? - ✔✔false

✔✔Drawings include the quantities of materials for the project? - ✔✔true

✔✔The bid form is not part of the Bid documents? - ✔✔false

✔✔Instructions to Bidders add information to what was put in the Advertisement? -
✔✔true

✔✔"AGC" stands for American General Constructors? - ✔✔false

✔✔Standard form construction contracts are considered to be fair? - ✔✔true

✔✔An advertisement should say where and when the bid opening will occur? - ✔✔true

✔✔An advertisement would be part of the bid documents? - ✔✔true

Document information

Uploaded on
May 27, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.5
(41)
Sold
291
Followers
11
Items
36202
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions