what is the maximum slope for glazing used in skylight before it must meet the provisions for vertical
glass? - Answer: 15 degrees
Plastic veneer used on the exterior can be installed up to which maximum height above grade? -
Answer: 50 feet
How is the hand of a door determined? - Answer: By the location of the hinges when the door is viewed
from the inside.
What is the minimum height required for a nonabsorbent wall surface above a bathtub? - Answer: 6 feet
Plaster coat shall be protected from freezing for a period of not less than how long after set has
occurred? - Answer: 24 hours
What is an agreement called that specifies that the contractor be paid actual for costs for labor and
material plus the fixed fees for the contractor's profit and overhead? - Answer: cost plus contract
What can be used to collect information on labor, materials, equipment, and overhead costs used during
the performance of a job? - Answer: a job cost system
What is the maximum slope for a ramp? - Answer: 1 unit vertical in 8 units horizontal
What protects a contractor from risk? - Answer: Insurance
What is your minimum wallboard thickness for the walls separating a house and garage? - Answer: 1/2
thick on the garage side
, An owner hires a construction manager for a project. Which of the following is true with regards to
subcontractors? - Answer: the subcontractors are prime contractors.
In seismic design category C, what is the maximum spacing for vertical reinforcement in masonry shear
walls? - Answer: 10 feet
A concrete block foundation wall that is adequately braced should be cured for a minimum of how much
time before backfilling? - Answer: 48 hours
Which type of mortar should be used for masonry that is installed below grade? - Answer: type M
What is the maximum distance horizontal reinforcement can be placed from the top of a masonry
partition wall? - Answer: 16 inches
What is the maximum spacing for masonry veneer to supporting wall anchors in non seismic locales? -
Answer: 24 inches on center horizontally and shall support not more than 2.67 square feet of wall area.
What is the minimum thickness (nominal) for an 8 foot high hollow masonry foundation wall that is 4
feet below finish grade on the exterior? - Answer: 8 inches
What would be the total amount of Medicare and Social Security taxes that the employer should
withhold on the last week of the year from an employee who earns$3,000 per week and has worked for
the employer the entire year? - Answer: $43.50
A permit is obtained on Friday, May 1. The materials are to be delivered May 8. The materials are
needed when labor begins on May 11. It is estimated that 15 days of labor are required. The crew will
work every day, including weekends and holidays. The project is scheduled to be completed on June 8.
How float days are available for the labor for this project? - Answer: 13
Which of the following would typically be covered by a contractor's comprehensive general liability
insurance policy? - Answer: Damage to adjoining property from a crane accident.
Complete Solutions Graded A+
what is the maximum slope for glazing used in skylight before it must meet the provisions for vertical
glass? - Answer: 15 degrees
Plastic veneer used on the exterior can be installed up to which maximum height above grade? -
Answer: 50 feet
How is the hand of a door determined? - Answer: By the location of the hinges when the door is viewed
from the inside.
What is the minimum height required for a nonabsorbent wall surface above a bathtub? - Answer: 6 feet
Plaster coat shall be protected from freezing for a period of not less than how long after set has
occurred? - Answer: 24 hours
What is an agreement called that specifies that the contractor be paid actual for costs for labor and
material plus the fixed fees for the contractor's profit and overhead? - Answer: cost plus contract
What can be used to collect information on labor, materials, equipment, and overhead costs used during
the performance of a job? - Answer: a job cost system
What is the maximum slope for a ramp? - Answer: 1 unit vertical in 8 units horizontal
What protects a contractor from risk? - Answer: Insurance
What is your minimum wallboard thickness for the walls separating a house and garage? - Answer: 1/2
thick on the garage side
, An owner hires a construction manager for a project. Which of the following is true with regards to
subcontractors? - Answer: the subcontractors are prime contractors.
In seismic design category C, what is the maximum spacing for vertical reinforcement in masonry shear
walls? - Answer: 10 feet
A concrete block foundation wall that is adequately braced should be cured for a minimum of how much
time before backfilling? - Answer: 48 hours
Which type of mortar should be used for masonry that is installed below grade? - Answer: type M
What is the maximum distance horizontal reinforcement can be placed from the top of a masonry
partition wall? - Answer: 16 inches
What is the maximum spacing for masonry veneer to supporting wall anchors in non seismic locales? -
Answer: 24 inches on center horizontally and shall support not more than 2.67 square feet of wall area.
What is the minimum thickness (nominal) for an 8 foot high hollow masonry foundation wall that is 4
feet below finish grade on the exterior? - Answer: 8 inches
What would be the total amount of Medicare and Social Security taxes that the employer should
withhold on the last week of the year from an employee who earns$3,000 per week and has worked for
the employer the entire year? - Answer: $43.50
A permit is obtained on Friday, May 1. The materials are to be delivered May 8. The materials are
needed when labor begins on May 11. It is estimated that 15 days of labor are required. The crew will
work every day, including weekends and holidays. The project is scheduled to be completed on June 8.
How float days are available for the labor for this project? - Answer: 13
Which of the following would typically be covered by a contractor's comprehensive general liability
insurance policy? - Answer: Damage to adjoining property from a crane accident.