100% tevredenheidsgarantie Direct beschikbaar na je betaling Lees online óf als PDF Geen vaste maandelijkse kosten 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

MN BOILER LICENSE QUESTIONS & ANSWERS(RATED A+)

Beoordeling
-
Verkocht
-
Pagina's
15
Cijfer
A+
Geüpload op
24-05-2025
Geschreven in
2024/2025

What is the maximum boiler horsepower you may take charge of on a chief engineer's license? - ANSWERUnlimited A 1st class engineer may take charge of a boiler plant not to exceed - ANSWER500 Boiler HorsePower If you were to fail a chief engineer's exam, how long must you wait before you would be allowed to take the test again - ANSWER30 Days What should be displayed in the boiler room? - ANSWEREngineer's License and Exemption or inspection certificates A 2nd class engineer may take complete charge of a boiler plant not to exceed...? - ANSWER100 Boiler Horse Power T/F When determining what engineers license will be needed, the total horsepower connected to the common header is used - ANSWERTrue In a boiler plant where there are two 250 horsepower boilers using heating surface connected to the same common header, what engineer's license would be required? - ANSWER1st Class Engineer What shift engineer's license would be required for two 250 HP boilers using heating surface connected to the same common header - ANSWER1st Class T/F A special engineer license is for high or low pressure boilers not to exceed 50 boiler HP - ANSWERTrue To whom would you report a boiler condition you thought not safe - ANSWERBoiler Inspector What grade license must the shift operator have where a chief engineer has charge of a plant of 500 BHP? - ANSWER2nd Class An engineer with one year of actual boiler operating experience verified by affidavit would be allowed to

Meer zien Lees minder
Instelling
MN BOILER LICENSE
Vak
MN BOILER LICENSE









Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
MN BOILER LICENSE
Vak
MN BOILER LICENSE

Documentinformatie

Geüpload op
24 mei 2025
Aantal pagina's
15
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

MN BOILER LICENSE QUESTIONS &
ANSWERS(RATED A+)
What is the maximum boiler horsepower you may take charge of on a chief
engineer's license? - ANSWERUnlimited

A 1st class engineer may take charge of a boiler plant not to exceed - ANSWER500
Boiler HorsePower

If you were to fail a chief engineer's exam, how long must you wait before you would
be allowed to take the test again - ANSWER30 Days

What should be displayed in the boiler room? - ANSWEREngineer's License and
Exemption or inspection certificates

A 2nd class engineer may take complete charge of a boiler plant not to exceed...? -
ANSWER100 Boiler Horse Power

T/F When determining what engineers license will be needed, the total horsepower
connected to the common header is used - ANSWERTrue

In a boiler plant where there are two 250 horsepower boilers using heating surface
connected to the same common header, what engineer's license would be required?
- ANSWER1st Class Engineer

What shift engineer's license would be required for two 250 HP boilers using heating
surface connected to the same common header - ANSWER1st Class

T/F A special engineer license is for high or low pressure boilers not to exceed 50
boiler HP - ANSWERTrue

To whom would you report a boiler condition you thought not safe - ANSWERBoiler
Inspector

What grade license must the shift operator have where a chief engineer has charge
of a plant of 500 BHP? - ANSWER2nd Class

An engineer with one year of actual boiler operating experience verified by affidavit
would be allowed to take an exam for - ANSWER2nd Class

An engineer having an engineer license, with 3 years actual boiler operating
experience verified by one or more affidavits would be allowed to take an exam for? -
ANSWER1st Class

What is meant by high pressure boiler? - ANSWERSteam or other vapor in excess of
15 PSIG or a water or other liquid boiler in which the pressure exceeds 160 PSIG or
a temperature of 250 F

, What would a special engineer's license allow you to operate? - ANSWERHigh and
Low pressure boilers and their appurtenances of not more than 50 HP

A shift engineer in a high-pressure, high-temperature hot water plant of 500 BHP
must have a? - ANSWER2nd class Grade A or B

T/F The Division of Boiler Inspection may suspend or revoke the license of any
master, pilot or engineer found under the influence of drugs or alcohol when on duty
- ANSWERTrue

T/F Boilers found to be operated by unlicensed or improperly licensed persons shall
not be used until the operators are properly licensed - ANSWERTrue

How often must you renew your high or low pressure boiler engineer's license -
ANSWEROnce every two years

A company is monitoring boilers by remote electronic surveillance; do they need a
licensed engineer for monitoring - ANSWERNo, see Section 13.183.501

What equipment would you be allowed operating responsibility with a 1st Class
Engineer's license Grade B - ANSWERTotal bhp not to exceed 500 hp liquid or
vapor boilers and their appurtences

Four, 20 million BTU input hot water boilers are connected to the same common
header. What license would be needed to be in charge of this plant? (temp of hot
water is less than 250 F and pressure is less than 160 psi) - ANSWERChief A, B, or
C license

What class and grade of license MUST the shift engineer have where a chief
engineer has charge of a hot water plant operating below 250 F and 160 psig total
bhp of 500 - ANSWERA 2nd Class Grade A, B, or C license

For the purpose of the rating bhp for engineer's license classification only, how many
sq ft of heating surface shall be equivalent to one bhp - ANSWER10 sq ft of heating
surface

What is meant by the term Low Pressure Boiler - ANSWERBoilers operating at a
steam or other vapor pressure of 15 psig lr less; or a water or other liquid boiler in
which the pressure does not exceed 160 psig or a temperature of 250 F

A special engineer may serve as an apprentice in what size maximum vapor boiler
plant - ANSWERIn any plant under the direct supervision of the properly licensed
engineer

Under the new boiler license law, which became effective April 15, 1982; who would
be allowed to fill out an affidavit for a person applying for a 2nd class, or higher,
boiler license - ANSWERThe employer of a 2nd class engineer

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
papersbyjol West Virginia
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
421
Lid sinds
3 jaar
Aantal volgers
253
Documenten
14048
Laatst verkocht
1 maand geleden

3.8

72 beoordelingen

5
27
4
18
3
17
2
2
1
8

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen