What is the purpose of the suicide circuit?
Prevents generator voltage buildup
If the DC output of a three phase rectifier is lower that specified, what would the most likely
cause?
One input phase is missing
At what point is the main motor field voltage highest?
When the elevator is running
When might you place jumpers on the overloads?
Never jump out the overloads
If the generator is rotating and you apply voltage to the field but no armature voltage is
produced, what is most likely wrong?
Generator field is open
If there is voltage at the generator armature but not at the motor armature, what is most likely
wrong?
The loop circuit is open
What is typically used in a solid state motor drive system to measure actual motor speed?
Tachometer
100
1|Page
, SCR will not conduct until it is gated
101
SCR convert AC to DC
which of the following statements applies to facias?
Hanger covers should be installed after the interlock and door adjustments have been
completed
When installing Hostway doors, what is the purpose of the sight guard?
Used to provide a clean door edge that blocks the Hostway from publics view
You have received a large shipment of doors for a high-rise installation and have to get them
stored properly. Which of the following statements is correct?
Store the doors vertically on the long edge
When setting sills, which of the following statements applies?
Worth the effort to make a template to determine sill locations on a high-rise
When setting sills in compliance with the ASME rules, what is the minimum clearance allowed
between the platform sill and Hostway sill?
½ inch
When setting sills in compliance with ASME rules, what is the max clearance allowed between
the platform sill and hoisway sill?
1 ½ inch
When setting sills, which of the following must be done?
If rough spots exist on the roughed floor, set the sill to finished floor height to account for
thickness of material
You are installing a door frame, which of the following statements applies?
Use plumb lines hanging from magnets to plumb the side frames
After installing entrances frames are prior to the blocks being installed, what is the next step in
the procedure?
Place a spreader board with cloth or paper on the ends halfway up the frame between side
jams
2|Page
CORRECT QUESTIONS AND VERIFIED
DETAILED ANSWERS |FREQUENTLY TESTED
QUESTIONS AND SOLUTIONS|ALREADY
GRADED A+|LATEST UPDATE |GUARANTEED
PASS
What is the purpose of the suicide circuit?
Prevents generator voltage buildup
If the DC output of a three phase rectifier is lower that specified, what would the most likely
cause?
One input phase is missing
At what point is the main motor field voltage highest?
When the elevator is running
When might you place jumpers on the overloads?
Never jump out the overloads
If the generator is rotating and you apply voltage to the field but no armature voltage is
produced, what is most likely wrong?
Generator field is open
If there is voltage at the generator armature but not at the motor armature, what is most likely
wrong?
The loop circuit is open
What is typically used in a solid state motor drive system to measure actual motor speed?
Tachometer
100
1|Page
, SCR will not conduct until it is gated
101
SCR convert AC to DC
which of the following statements applies to facias?
Hanger covers should be installed after the interlock and door adjustments have been
completed
When installing Hostway doors, what is the purpose of the sight guard?
Used to provide a clean door edge that blocks the Hostway from publics view
You have received a large shipment of doors for a high-rise installation and have to get them
stored properly. Which of the following statements is correct?
Store the doors vertically on the long edge
When setting sills, which of the following statements applies?
Worth the effort to make a template to determine sill locations on a high-rise
When setting sills in compliance with the ASME rules, what is the minimum clearance allowed
between the platform sill and Hostway sill?
½ inch
When setting sills in compliance with ASME rules, what is the max clearance allowed between
the platform sill and hoisway sill?
1 ½ inch
When setting sills, which of the following must be done?
If rough spots exist on the roughed floor, set the sill to finished floor height to account for
thickness of material
You are installing a door frame, which of the following statements applies?
Use plumb lines hanging from magnets to plumb the side frames
After installing entrances frames are prior to the blocks being installed, what is the next step in
the procedure?
Place a spreader board with cloth or paper on the ends halfway up the frame between side
jams