Exam (elaborations)

Six Sigma Black Belt Session 11 Exam Questions and Answers Fully Solved Graded A+

Document preview thumbnail
Preview 2 out of 5 pages

Six Sigma Black Belt Session 11 Exam Questions and Answers Fully Solved Graded A+ A pharmacy performed an FMEA on the prescription preparation process. One element of the process had an RPN much higher than the others. Which statement is true? A) The element with a high RPN indicates conformance with safety standards. B) The process element with a high RPN is the most reliable process. C) The high RPN number is a baseline for raising the RPN's of other elements. D) The element with a high RPN has higher risk, and should be a top priority for corrective action. E) All elements with an RPN have been proven to be reliable. - Answers D) The element with a high RPN has higher risk, and should be a top priority for corrective action. Which of the following is the best description of External Set-up? A) Set-up activities which take place outside B) Set-up activities which take place while the process is not running C) Set-up activities which take place while the process is running D) Set-up activities which are conducted by external personnel E) Set-up activities which require external inputs from other processes - Answers C) Set-up activities which take place while the process is running A financial services firm routinely processes a large volume of account change requests. A Lean Six Sigma team wants to understand the resources required to maintain a maximum target cycle time of 16 hours. When demand fluctuates, personnel can be reassigned temporarily to increase the rate of processing. If the normal processing rate is 2 per minute, what should the maximum items in process (queue) before reassigning resources? A) 16 B) 32 C) 120 D) 960 E) 1920 - Answers E) 1920 Things-in-Process (Queue) = 16 hours x (2 Items/Minute x 60 Minutes) = 1920. Which is one of the most crucial actions in the process of achieving continuous flow? A) Creating a value stream map. B) Eliminating non valued-added steps. C) Reducing batch size toward one. D) Calculating Takt time. E) Changing the flow to a cellular design. - Answers C) Reducing batch size toward one. Which of the following is a component of Design for Manufacturability?

Content preview

Six Sigma Black Belt Session 11 Exam Questions and Answers Fully Solved Graded A+

A pharmacy performed an FMEA on the prescription preparation process. One element of the process
had an RPN much higher than the others. Which statement is true?

A) The element with a high RPN indicates conformance with safety standards.

B) The process element with a high RPN is the most reliable process.

C) The high RPN number is a baseline for raising the RPN's of other elements.

D) The element with a high RPN has higher risk, and should be a top priority for corrective action.

E) All elements with an RPN have been proven to be reliable. - Answers D) The element with a high RPN
has higher risk, and should be a top priority for corrective action.

Which of the following is the best description of External Set-up?

A) Set-up activities which take place outside

B) Set-up activities which take place while the process is not running

C) Set-up activities which take place while the process is running

D) Set-up activities which are conducted by external personnel

E) Set-up activities which require external inputs from other processes - Answers C) Set-up activities
which take place while the process is running

A financial services firm routinely processes a large volume of account change requests. A Lean Six Sigma
team wants to understand the resources required to maintain a maximum target cycle time of 16 hours.
When demand fluctuates, personnel can be reassigned temporarily to increase the rate of processing. If
the normal processing rate is 2 per minute, what should the maximum items in process (queue) before
reassigning resources?

A) 16

B) 32

C) 120

D) 960

E) 1920 - Answers E) 1920



Things-in-Process (Queue) = 16 hours x (2 Items/Minute x 60 Minutes) = 1920.

, Which is one of the most crucial actions in the process of achieving continuous flow?

A) Creating a value stream map.

B) Eliminating non valued-added steps.

C) Reducing batch size toward one.

D) Calculating Takt time.

E) Changing the flow to a cellular design. - Answers C) Reducing batch size toward one.

Which of the following is a component of Design for Manufacturability?

A) Emphasize unique parts for each application.

B) Design all parts in house to ensure compatibility.

C) Use the minimum number of parts possible.

D) Specify improved process capability to allow tighter tolerances.

E) Allow greater adjustment to encourage craftsmanship. - Answers C) Use the minimum number of
parts possible.

In setting up a work cell, which of the following activities is NOT required to create the future state map?

A) Identify any needs for additional equipment.

B) Establish operator quality self checks for each operation.

C) Map the existing process.

D) Collect baseline performance data.

E) Review process step cycle times and setup times. - Answers B) Establish operator quality self checks
for each operation.

Once a work cell has been Piloted and Launched, which of the following activities is an important factor
for success?

A) Detailed plan for rearranging facilities or equipment.

B) Develop operator self-maintenance plans.

C) Conduct ergonomic and safety assessment.

D) Collect data on all losses and organize ongoing Kaizen efforts.

Document information

Uploaded on
May 21, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.5
(76)
Sold
504
Followers
16
Items
33031
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions