• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

F-80 Exam Questions with 100% Answers

Document preview thumbnail
Preview 2 out of 12 pages

F-80 Exam Questions with 100% Answers All elevators equipped with Phase I emergency elevator recall and Phase II emergency in-service elevator operation shall be maintained in proper working order such that the emergency elevator operations are operable at all times. All elevators shall be subjected, at least a _______, to a Phase I recall test. All elevators shall also be subjected, at least a ________, to a minimum of a Phase II one-floor operation test. A. Monthly, Monthly B. Weekly, Weekly C. Semi Annually, Annual D. Monthly, Semi Annually - ANSWER -A. Monthly, Monthly Shelters must not become overcrowded and must maintain adequate means of egress, including: a. providing a livable area of not less than? A. 60 Square Feet per shelter occupant B. 80 square feet per shelter occupant, or as otherwise approved by the NYC Department of Buildings C. Depends on the layout of the shelter D. There are no set requirements for shelter occupants - ANSWER -B. 80 square feet per shelter occupant, or as otherwise approved by the NYC Department of Buildings Adequate aisle space shall be maintained throughout the emergency shelter. Aisles shall not be less than? A. 36 inches in width, except that cross aisles (aisle space in the main hallways) shall not be less than 48 inches in width B. All aisle must at least 48 inches wide C. All aisle must be 36 inches wide D. Aisle width depends on the building layout. - ANSWER -A. 36 inches in width, except that cross aisles (aisle space in the main hallways) shall not be less than 48 inches in width Means of egress and exits shall be provided that are all of the following except? A. sufficient in number B. arranged to open in the direction of exit travel C. equipped with locks and chains D. remote from one another - ANSWER -C. equipped with locks and chains What determines the number of occupants authorized to be in a shelter? A. the New York City fire Department B. the buildings certificate of occupancy C. the department of homeless services D. the New York City buildings department - ANSWER -B.the buildings certificate of occupancy The Fire Department can deny, not renew, suspend or revoke a certificate for misconduct, which would include the failure of the certificate holder to properly fulfill his or her duties for any of the following reason EXCEPT? A. compromising the integrity or confidentiality of a Fire Department examination B. the failure of certificate holders to properly fulfill their duties C. any false and fraudulent conduct in connection with an application for a certificate or the duties of a certificate holder D. you can make changes to your certificate of fitness as long as you do so and pencil. - ANSWER -D.. you can make changes to your certificate of fitness as long as you do so and pencil. Who is required to have the emergency preparedness plan prepared? A. the coordinator of fire safety and alarm systems in a homeless shelter B. the owner of the building C. the FDNY D. The New York City Department of buildings - ANSWER -B. the owner of the building Upon confirmation of off-line status from the Central Station Company, for a drill in a shelter a system off-line entry should be made in the logbook. The entry must include all of the following information EXCEPT? A. The time the system was taken off-line B. The reason the system was taken off-line C. The name of the coordinator who took the alarm system off-line D. The time the system was restored. - ANSWER -C. The name of the coordinator who took the alarm system off-line how often are drills to be conducted in shelters? (Choose the most correct) A. Monthly B. Weekly C. Quarterly D. Monthly on each shift - ANSWER -D. Monthly on each shift Throughout the drill, the Coordinator of Fire Safety & Alarm Systems in Homeless Shelters and FEP staff should pay particular attention to and address all of the following EXCEPT? A. Difficulties experienced in determining that all building occupants are accounted for B. Ensuring that drills are conducted in as quick and timely manner no matter the results C. Difficulties experienced by people with disabilities or other special needs D. Identifying any problems with the fire alarm system. - ANSWER -B. Ensuring that drills are conducted in as quick and timely manner no matter the results The correct way to reset the fire alarm system after an alarm is activated from a manual fire alarm pull station? A. The alarm must be reset from the fire alarm pull station. B. The main panel must be reset before the fire alarm pull station is reset. C. The pull station must be reset to its normal position and then the main panel is reset. D. A key is always required to reset the fire alarm system. - ANSWER -C. The pull station must be reset to its normal position and then the main panel is reset. Which one of the following is NOT a characteristic of fixed temperature heat detectors? A. They have fusible elements. B. They are more sensitive than rate of rise heat detectors. C. They need to be replaced after they activate the alarm.

Content preview

F-80 Exam Questions with 100% Answers
All elevators equipped with Phase I emergency elevator recall and Phase II
emergency in-service elevator operation shall be maintained in proper working
order such that the emergency elevator operations are operable at all times. All
elevators shall be subjected, at least a _______, to a Phase I recall test. All
elevators shall also be subjected, at least a ________, to a minimum of a Phase II
one-floor operation test.
A. Monthly, Monthly
B. Weekly, Weekly
C. Semi Annually, Annual
D. Monthly, Semi Annually - ANSWER -A. Monthly, Monthly

Shelters must not become overcrowded and must maintain adequate means of
egress, including: a. providing a livable area of not less than?
A. 60 Square Feet per shelter occupant
B. 80 square feet per shelter occupant, or as otherwise approved by the NYC
Department of Buildings
C. Depends on the layout of the shelter
D. There are no set requirements for shelter occupants - ANSWER -B. 80 square
feet per shelter occupant, or as otherwise approved by the NYC Department of
Buildings

Adequate aisle space shall be maintained throughout the emergency shelter. Aisles
shall not be less than?
A. 36 inches in width, except that cross aisles (aisle space in the main hallways)
shall not be less than 48 inches in width
B. All aisle must at least 48 inches wide
C. All aisle must be 36 inches wide
D. Aisle width depends on the building layout. - ANSWER -A. 36 inches in width,
except that cross aisles (aisle space in the main hallways) shall not be less than 48
inches in width

Means of egress and exits shall be provided that are all of the following except?

, A. sufficient in number
B. arranged to open in the direction of exit travel
C. equipped with locks and chains
D. remote from one another - ANSWER -C. equipped with locks and chains

What determines the number of occupants authorized to be in a shelter?
A. the New York City fire Department
B. the buildings certificate of occupancy
C. the department of homeless services
D. the New York City buildings department - ANSWER -B.the buildings
certificate of occupancy

The Fire Department can deny, not renew, suspend or revoke a certificate for
misconduct, which would include the failure of the certificate holder to properly
fulfill his or her duties for any of the following reason EXCEPT?
A. compromising the integrity or confidentiality of a Fire Department examination
B. the failure of certificate holders to properly fulfill their duties
C. any false and fraudulent conduct in connection with an application for a
certificate or the duties of a certificate holder
D. you can make changes to your certificate of fitness as long as you do so and
pencil. - ANSWER -D.. you can make changes to your certificate of fitness as long
as you do so and pencil.

Who is required to have the emergency preparedness plan prepared?
A. the coordinator of fire safety and alarm systems in a homeless shelter
B. the owner of the building
C. the FDNY
D. The New York City Department of buildings - ANSWER -B. the owner of the
building

Upon confirmation of off-line status from the Central Station Company, for a drill
in a shelter a system off-line entry should be made in the logbook. The entry must
include all of the following information EXCEPT?
A. The time the system was taken off-line
B. The reason the system was taken off-line

Document information

Uploaded on
May 20, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheExamMaestro
3.6
(18)
Sold
159
Followers
5
Items
3828
Last sold
9 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions