100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Resumen

Summary Chapter 13. Lean, agile and mass customization strategies

Puntuación
-
Vendido
-
Páginas
4
Subido en
19-05-2025
Escrito en
2020/2021

A detailed summary of chapter 13. Lean, agile and mass customization strategies

Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

¿Un libro?
No
¿Qué capítulos están resumidos?
13
Subido en
19 de mayo de 2025
Número de páginas
4
Escrito en
2020/2021
Tipo
Resumen

Temas

Vista previa del contenido

Chapter 13 Lean, agile and mass customization
strategies
Lean production
Core of lean philosophy is the notion of putting the customer and what they value first.
Understanding customer values allows firms to understand what waste is and how to remove it using
the lean tools an techniques. 5 principles of lean production:
1. Specify what value means from the standpoint of an organizations target customer
2. Identify steps in the process that are required to deliver value to the customer, this is called
the value stream




3. Getting the value to flow through the value stream without interruption, rework, double
handling and waiting  done by load leveling (pace or work through the work station; or
called heijunka in Japanese)  takt time (the rate at which products pass through an
operation) = effective working time per shift / customer requirement per shift
4. Pull planning techniques are a vital part of lean production as they ensure that no part enters
the operation unless an order is attached to it
5. Requirement to strive for perfection  done through CI or kaizen (another essential element
of lean production)

Waste elimination (MUDA) in lean production
Waste reduction and removal is essential to delivering customer value through manufacturing and
service processes. Waste is the opposite of value. Original 7 production wastes from Shigeo Shingo
(as part of the Toyota Production System), 8 th waste is added (related to underutilizing the talents
and skills of the people employed in the process)
1. Transportation
2. Inventory
3. Motion
4. Waiting
5. Overproduction
6. Overprocessing
7. Defects
8. Skills

Lean tools and techniques in manufacturing
Generally lean production is only suitable for repetitive processes that are tightly controlled.
- Single minute exchange of dies (SMED)
= reducing the cycle time of machinery through minimizing machine downtime
Reduction of cycle time is achieved by doing as much of the changeover while the machine is
running to minimize the activities – and time these take – when the machine is stopped
$5.59
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
esmeedoesburg

Conoce al vendedor

Seller avatar
esmeedoesburg Breda University of Applied Sciences
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
6 meses
Número de seguidores
0
Documentos
25
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes