QSP/QSD Exam Questions And Answers 100% Pass What 4 distinct phases of construction activities does the General Permit Recognize - ANS Grading and Land Development Streets and Utilities Vertical Construction Final Landscaping and site Stabilization Any construction or demolition activity, including, but not limited to, clearing, grading, grubbing, or excavation, or any other activity that results in a land DISTURBANCE of equal to or greater than ___ acre - ANS 1 LUPs - ANS Linear Underground/Overhead Utility Projects What is the primary federal law governing storm water pollution and regulation - ANS Clean Water Act The person in charge of the utility company, municipality, or other public or private company or agency that owns or operates the ____ may also serve as the LRP - ANS LUP Visual Monitoring is required for... - ANS All sites subject to this General Permit ©EVERLY 2025 ALL RIGHTS RESERVED Records are required to remain onsite during the construction period for a minimum of ___ - ANS 3 Years When does Risk Level 1 site have to sample? - ANS When required for non-visible pollutants When would receiving water monitoring occur? - ANS Effluent that exceeds the receiving water monitoring triggers contained in the GP and with direct discharges to receiving water When would bioassessment sampling take place? - ANS RISK level 3 and LUP Type 3 Sites larger than 30 acres and with direct discharges to receiving waters. (before and after sire completion) Where do records need to be available? - ANS At the construction site until construction is complete. LUPs may be retained in a crew members vehicle and made available upon request ATS - ANS Active Treatment Systems What do ATS do? - ANS Add chemicals to facilitate flocculation, coagulation and filtration of suspended sediment particles. Measured by NELs When does risk level 1 site have to sample - ANS When required for non-visible pollutants Which construction activity is not covered under the CGP - ANS Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility When is the primary federa

Montrer plus Lire moins
Établissement
QSP/QSD
Cours
QSP/QSD









Oups ! Impossible de charger votre document. Réessayez ou contactez le support.

École, étude et sujet

Établissement
QSP/QSD
Cours
QSP/QSD

Infos sur le Document

Publié le
16 mai 2025
Nombre de pages
14
Écrit en
2024/2025
Type
Examen
Contient
Questions et réponses

Sujets

Aperçu du contenu

©EVERLY 2025 ALL RIGHTS RESERVED




QSP/QSD Exam Questions And Answers
100% Pass



What 4 distinct phases of construction activities does the General Permit Recognize -
ANS Grading and Land Development
Streets and Utilities
Vertical Construction
Final Landscaping and site Stabilization


Any construction or demolition activity, including, but not limited to, clearing, grading,
grubbing, or excavation, or any other activity that results in a land DISTURBANCE of equal to or
greater than ___ acre - ANS 1



LUPs - ANS Linear Underground/Overhead Utility Projects



What is the primary federal law governing storm water pollution and regulation - ANS Clean
Water Act


The person in charge of the utility company, municipality, or other public or private company or
agency that owns or operates the ____ may also serve as the LRP - ANS LUP



Visual Monitoring is required for... - ANS All sites subject to this General Permit

, ©EVERLY 2025 ALL RIGHTS RESERVED


Records are required to remain onsite during the construction period for a minimum of ___ -
ANS 3 Years



When does Risk Level 1 site have to sample? - ANS When required for non-visible pollutants



When would receiving water monitoring occur? - ANS Effluent that exceeds the receiving
water monitoring triggers contained in the GP and with direct discharges to receiving water



When would bioassessment sampling take place? - ANS RISK level 3 and LUP Type 3 Sites
larger than 30 acres and with direct discharges to receiving waters. (before and after sire
completion)



Where do records need to be available? - ANS At the construction site until construction is
complete. LUPs may be retained in a crew members vehicle and made available upon request



ATS - ANS Active Treatment Systems



What do ATS do? - ANS Add chemicals to facilitate flocculation, coagulation and filtration of
suspended sediment particles. Measured by NELs



When does risk level 1 site have to sample - ANS When required for non-visible pollutants



Which construction activity is not covered under the CGP - ANS Routine maintenance to
maintain original line and grade, hydraulic capacity, or original purpose of the facility


When is the primary federal law governing storm water pollution and regulation? -
ANS Clean Water Act
$12.99
Accéder à l'intégralité du document:

Garantie de satisfaction à 100%
Disponible immédiatement après paiement
En ligne et en PDF
Tu n'es attaché à rien

Faites connaissance avec le vendeur

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
Everly Teachme2-tutor
Voir profil
S'abonner Vous devez être connecté afin de suivre les étudiants ou les cours
Vendu
18
Membre depuis
1 année
Nombre de followers
0
Documents
2796
Dernière vente
2 mois de cela
Study packs.

Find Quality Exam Materials made by professionals With A guaranteed A+

4.3

4 revues

5
2
4
1
3
1
2
0
1
0

Récemment consulté par vous

Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Foire aux questions