Aggregate planning - Answers :Intermediate-range capacity planning, usually covering 2
to 12 months.

Sales and operations planning - Answers :Intermediate-range decisions to balance
supply and demand, integrating financial and operations planning.

Level capacity strategy - Answers :Maintaining a steady rate of regular-time output while
meet- ing variations in demand by a combination of options.

Chase demand strategy - Answers :Matching capacity to demand; the planned output
for a period is set at the expected demand for that period.

Simulation models - Answers :Computerized models that can be tested under different
scenarios to identify acceptable solutions to problems.

Yield management - Answers :The application of pricing strategies to allocate capacity
among various categories of demand.

Master production schedule (MPS) - Answers :This schedule indicates the quantity and
timing of planned completed production.

Rough-cut capacity planning (RCCP) - Answers :Approximate balancing of capacity and
demand to test the feasibility of a master schedule.

Time fences - Answers :Points in time that separate phases of a master schedule
planning horizon.

Available-to-promise (ATP) inventory - Answers :Uncommitted inventory.

Dependent demand - Answers :Demand for items that are subassemblies or component
parts to be used in the production of finished goods.

Material requirements planning (MRP) - Answers :A methodology that translates master
schedule requirements for end items into time-phased requirements for subassemblies,
components, and raw materials.

Master schedule - Answers :One of three primary inputs in MRP; states which end items
are to be pro- duced, when these are needed, and in what quantities.

Cumulative lead time - Answers :The sum of the lead times that sequential phases of a
process require, from ordering of parts or raw materials to completion of final assembly.

, Bill of materials (BOM) - Answers :One of the three primary inputs of MRP; a listing of
all of the raw materials, parts, subassemblies, and assemblies needed to produce one
unit of a product.

Product structure tree - Answers :A visual depiction of the requirements in a bill of
materials, where all components are listed by levels.

Low-level coding - Answers :Restructuring the bill of materials so that multiple
occurrences of a component all coincide with the lowest level at which the component
occurs.

Inventory records - Answers :One of the three primary inputs in MRP; includes
information on the status of each item by time period.

Gross requirements - Answers :Total expected demand for an item or raw material in a
time period.

Scheduled receipts - Answers :Open orders scheduled to arrive from vendors or
elsewhere in the pipeline.

Projected on hand - Answers :Expected amount of inventory that will be on hand at the
beginning of each time period.

Net requirements - Answers :The actual amount needed in each time period.

Planned-order
receipts - Answers :Quantity expected to be received by the beginning of the period in
which it is shown.

Planned-order releases - Answers :Planned amount
to order in each time period; planned-order receipts offset by lead time.

Pegging - Answers :The process of identi- fying the parent items that have generated a
given set of material requirements for an item.

Regenerative system - Answers :Approach that updates MRP records periodically.

Net-change system - Answers :Approach that updates MRP records continuously.

Planned orders - Answers :Schedule indicating the amount and timing of future orders.

Order releases - Answers :Authorization for the execution of planned orders.

Changes - Answers :Revisions of due dates or order quantities, or cancellations of
orders

Información del documento

Subido en
15 de mayo de 2025
Número de páginas
6
Escrito en
2024/2025
Tipo
Otro
Personaje
Desconocido
$13.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA
3.8
(360)
Vendido
2133
Seguidores
1447
Artículos
57920
Última venta
2 días hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes