ENCE325 UPDATED Exam Questions and CORRECT Answers The widening of a state highway is an example of which sector of the construction industry? [Commercial, Industrial, Residential, Infrastructure] - CORRECT ANSWER Infrastructure - Specialty trade contractors are typically hired on the job by? - CORRECT ANSWER contractor A construction project is characterized by the following? [It uses resources, It is unique, It results in deliverables or All of the above] - CORRECT ANSWER the above - The - All of

Voorbeeld van de inhoud

MGRADES


ENCE325 UPDATED Exam Questions and
CORRECT Answers
The widening of a state highway is an example of which sector of the construction industry?
[Commercial, Industrial, Residential, Infrastructure] - CORRECT ANSWER -
Infrastructure


Specialty trade contractors are typically hired on the job by? - CORRECT ANSWER - The
contractor


A construction project is characterized by the following? [It uses resources,

It is unique, It results in deliverables or All of the above] - CORRECT ANSWER - All of
the above


In which of the following stages does the contractor have the major responsibility to coordinate
all necessary tasks associated with that stage? [Design, Programming, Feasibility, Close-out] -
CORRECT ANSWER - close-out


Which member of the contractor's team is responsible for the day-to-day production activities on
the jobsite? - CORRECT ANSWER - The superintendent


The residential sector of the industry is characterized by which of the following? [Buildings are
typically publicly financed, Projects are fairly low tech, Projects typically use steel and concrete
building materials, Projects are typically designed by engineers] - CORRECT ANSWER -
projects are fairly low tech


What is the major rating system for green buildings - CORRECT ANSWER - LEED


During the start-up and mobilization stage the following activities occur? - CORRECT
ANSWER - The contractor moves onto the jobsite

, MGRADES


The Owner is responsible for the project feasibility stage. (True or False) - CORRECT
ANSWER - true


According to Dykstra, there are 3 outcomes of the bidding and award stage. They include all,
except which of the following? [Award of construction contract, bid submittals by contractors,
bid review, bid package] - CORRECT ANSWER - Bid Review


A design-build delivery method typically results in the owner having one contract with the
architect and another contract with the contractor. (True or False) - CORRECT
ANSWER - False


The owner will decide which of the following as a result of the feasibility stage (select all correct
answers). [Ask the Architect to fund the project
Move forward with project, Abandon the project, Adjust the scope, budget, and/or schedule, Ask
the Contractor to design the project] - CORRECT ANSWER - Move forward with project,
abandon the project, adjust the scope, budget and schedule


Project design typically occurs in three distinct phases: Answer in order of design and phase
progression - CORRECT ANSWER - Schematic Design, Design Development and
Construction Documents


An owner is considering building a 120 unit housing development on the outskirts of town. What
would you refer to in determining if livestock would be allowed as part of the property
development? - CORRECT ANSWER - Zoning Ordinance


Private owners may prefer to negotiate a fixed price with a contractor. In that situation, the
delivery method is called - CORRECT ANSWER - Design Negotiate Build (DNB)


In an agency construction management (agency CM) delivery method, the CM is financially
responsible and self-performs work. (True or False) - CORRECT ANSWER - False

Documentinformatie

Geüpload op
9 mei 2025
Aantal pagina's
6
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$11.99

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
MGRADES
4.0
(235)
Verkocht
1539
Volgers
108
Items
111873
Laatst verkocht
1 dag geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen