COSC FINAL EXAM QUESTIONS AND ANSWERS

Instelling
Cosc
Vak
Cosc










Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
Cosc
Vak
Cosc

Documentinformatie

Geüpload op
7 mei 2025
Aantal pagina's
19
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

COSC FINAL EXAM QUESTIONS AND ANSWERS

LEED recognizes four levels of sustainable design; Certified, Silver, Gold, and
Diamond.
True or False - Answers :False

We discussed a number of ways to pay for construction services. Which one is the best
fit for projects where the scope of work is not fully known at the time compensation is
established?

Cost plus a fee
Lump sum
Design/build
CMAR - Answers :Cost Plus a Fee

We discussed a number of ways to pay for construction services. Which one involved
paying the general contractor a fixed dollar amount to complete the construction
project?

Cost plus a fee
Lump sum
Construction Manager
Design/build - Answers :Lump Sum

When we discussed friction plies in class, I used an analogy to help explain the concept.
Which analogy did I use?

A nail driven into wood
Rebar embedded in concrete
Baking flour in cake mix
A stick stuck in clay soil - Answers :A nail driven into wood

In the ___________ project delivery method, the construction manager acts more like a
general contractor and takes greater responsibility/risk for construction quality,
schedule, and cost.

Design/build
Design/bid/build
CMAR
Construction Manager (fee based) - Answers :CMAR

Which type of code is used to regulate land use?

Zoning Code
Building Code

,Fire Code
None of the above - Answers :Zoning Code

A _____________________ code requirement contains detailed information, is simpler
to implement, and provides certainty for designers and builders.

descriptive
prescriptive
performance
functioning - Answers :prescriptive

According to the IBC, Type V construction is more fire resistant than Type I
construction.

True
False - Answers :False

In the _________________ project delivery method, work does not begin until all design
work is complete.

Design/build
Fast track
High rise
Design/bid/build - Answers :Design/bid/build

Prior to 2000, the three model building codes most prevalent in the United States
were...

National, International, and Basic
National, Basic, and Standard
National, Uniform, and Standard
Uniform, Basic, and Standard - Answers :National, Uniform, and Standard

Overlapping design and construction phases of a construction project is an example of
__________________ used to shorten or compress the overall project schedule.

phased or fast-tract
sequential
design/bid/build
lump sum - Answers :phased or fast-tract

In the __________________ project delivery method, the owner contracts with a single
entity throughout the project.

Design/build
Design/bid/build

, Hard bid
Cost plus - Answers :Design/build

To successfully navigate the IBC, one needs to know the...

proposed building occupancy and construction type
proposed building size and area
proposed building size and use
proposed building construction type and height - Answers :proposed building occupancy
and construction type

Caroline Ask with the City of College Station recommended several "best management
practices" related to stormwater management. One BMP was a designated concrete
washout area. What is the primary reason for containing concrete washout on the
project site?

Concrete contains a high sodium content
Concrete contains a low sodium content
Concrete has a high pH level
Concrete has a low pH level - Answers :Concrete has a high pH level

As it relates to occupancy classifications in the IBC, which one of the following
statements is true?

Francis Hall is classified as group E, Educational
a hospital is classified as group H, Healthcare
group M, Mercantile includes uses such as stores, markets, and salesrooms
a restaurant or bar would be classified as group B, Business - Answers :group M,
Mercantile includes uses such as stores, markets, and salesrooms

Which type of pile is not hammered into the ground?

Concrete
Steel
Timber
Helical - Answers :Helical

A best management practice for preventing stormwater pollution is to provide a
designated entrance to the project site.

True
False - Answers :True

Contractors are required to create, post, and monitor a(n) _____________ that
describes how storm water and erosion will be addressed on the construction site.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GEEKA YALA UNIVERSITY
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2013
Lid sinds
3 jaar
Aantal volgers
1447
Documenten
48755
Laatst verkocht
11 uur geleden

3.8

345 beoordelingen

5
172
4
61
3
44
2
16
1
52

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen