Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ICC COMMERCIAL PLUMBING INSPECTOR EXAM |QUESTIONS WITH CORRECT VERIFIED ANSWERS |PRE-EVALUATED A+

Rating
-
Sold
-
Pages
45
Grade
A+
Uploaded on
06-05-2025
Written in
2024/2025

ICC COMMERCIAL PLUMBING INSPECTOR EXAM |QUESTIONS WITH CORRECT VERIFIED ANSWERS |PRE-EVALUATED A+

Institution
ICC COMMERCIAL PLUMBING INSPECTOR
Course
ICC COMMERCIAL PLUMBING INSPECTOR

Content preview

ICC COMMERCIAL PLUMBING INSPECTOR
EXAM |QUESTIONS WITH CORRECT
VERIFIED ANSWERS |PRE-EVALUATED A+




Sump pumps shall be permitted in an elevator shafts provided that they are
____________ ___________ to the plumbing system. - ANSWER-Indirectly
connected IPC 301.6 exception


What type of water heaters are permitted in bedrooms ? - ANSWER-Direct vent
water heaters IFGC 303.3


The international residential code is applicable to plumbing work in townhouses not
more than______________in height with a separate means of egress - ANSWER-
Three stories


The provisions of the appendices do not apply unless____________. - ANSWER-
Specifically adopted

,In order to safeguard life, health and property, the IPC regulates all of the following
within the building environment, except_____________. - ANSWER-Cost


Where different sections of the code specify different requirements,
the_____________requirement shall apply. - ANSWER-Most restrictive


Existing plumbing systems must be brought into compliance with the IPC if the
system is______________. - ANSWER-A hazard to property


Where code provisions are in conflict with the referenced
standard,The_____________provisions shall apply. - ANSWER-Code


Where the code official fins that a proposed alternative material does not comply with
the intent of the code provisions, the code official shall_____________. - ANSWER-
State the reason for disapproval in writing to the applicant


For materials not specifically covered by the code, supporting data necessary to
verify compliance with the code must include______________. - ANSWER-Research
report


Tests performed by______________may be required by the code official where there
is insufficient evidence of the code. - ANSWER-An approve agency


Required department records shall be retained______________. - ANSWER-As
required by public
records


The code official shall be appointed by the_____________. - ANSWER-Chief
appointing authority

,The prescribed portions of standards referenced in the IPC and listed in chapter 15
are considered______________. - ANSWER-Requirements


The code official shall require construction documents and specifications to be
prepared by registered design professional when_______________. - ANSWER-
Required by state law


Which of the following information is not specifically required on the permit
application? - ANSWERType of construction


Who is responsible for inspection scheduling? - ANSWER-The permit holder


A permit is not required for________________. - ANSWER-Repairing of leaks in pipes,
valves or fixtures


Permits expire if work is not commenced within___________days of issuance. -
ANSWER-180


An application for an appeal of the code officials decision must be filed
within______________days after receipt of the notice. - ANSWER-20


The code official it's off the rise to suspend or revoke a permit____________. -
ANSWER-That was issued based on an accurate information


Where tests are required as evidence of compliance with the code, the test reports
Shall be retain for_____________. - ANSWER-The period required for retention of
public records

, When the plumbing permit is issued, the construction documents shall be
stamped___________. -
ANSWER-Approved


Generally, one set of approved construction documents shall be retained by the code
official for at least_________days following completion of the work. - ANSWER-180


The board of appeals is not authorized to rule on an appeal based on the claim
that______________. -
ANSWER-The code requirements should be waived


Construction documents for buildings more than_______________stories in height
shall indicate the materials and methods for maintaining the required fire resistance
rating. - ANSWER-2


The code official may allow temporary connection to the utilities source__________. -
ANSWER-For testing plumbing systems


A___________ is permitted to discharge to an approved nine Portible water system. -
ANSWER-Clothes washer


When there is a conflict between the requirements of the code and the manufacturers
installation instructions, the______________requirements apply. - ANSWER-More
restrictive


A sump pump is permitted at the base of an elevator shaft when the discharge
is_____________. -
ANSWER-Indirectly connected to the plumbing system

Written for

Institution
ICC COMMERCIAL PLUMBING INSPECTOR
Course
ICC COMMERCIAL PLUMBING INSPECTOR

Document information

Uploaded on
May 6, 2025
Number of pages
45
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.35
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseShanit Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
19
Member since
2 year
Number of followers
8
Documents
495
Last sold
2 weeks ago
NurseShanit

I am dedicated to achieving the highest standards of academic excellence. Elevate your path to success by staying ahead with the most current exam updates and resources. My commitment to providing you with the latest information ensures you are well-prepared and confident for your exams. With access to comprehensive updates, study materials, and expert insights, you can effectively navigate the complexities of your coursework and examinations. By utilizing these resources, you position yourself to not only meet but exceed your academic goals. Embrace the opportunity to transform your academic journey and unlock new levels of achievement with the support of the most up-to-date exam information available. ALL THE BEST IN YOUR STUDIES

Read more Read less
5.0

275 reviews

5
273
4
1
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions