OPERATIONS EXCELLENCE FINAL
EXAM 2025 QUESTIONS WITH
CORRECTLY SOLVED
ANSWERS/NEWEST UPDATE
Save
Terms in this set (53)
,Students have to non-value-added time
change
buildings Such walks are not waste, as they
between classes, are required given the current lay-
which often out of the campus. However (unless
involves walks of the students take great joy in the
5 minutes or walk), they do not add value to the
more. Walking customer; they are thus non-value
from one add time.
building to
another is
a waste
non-value-
added time
value-added
time.
a processing step that does not
Non-Value
enhance the product but must be
Added
done
value added the time in which useful work is
time actually being done on the unit
,What are the two c Built-in quality and just-in-time
pillars of the Correct
Toyota
Production
System?
a Just-in-time
and waste
reduction
b Waste
reduction and
built-in quality
c Built-in quality
and just-in-time
d Process
improvement
and waste
reduction
Built-In Quality practices ensure that
each Solution element, at every
Built-in Quality increment, meets appropriate
quality standards throughout
development.
, a logistics process in which goods
arrive when needed for production,
just in time
use, or sale rather than sitting in
storage
Which of the b Overtime
following does
not belong to
the seven
sources of
waste?
a Rework
b Overtime
c Transportation
d Inventory
Inventory
Overproduction
Waiting time
Seven Sources
Unnecessary transporting
of Waste
Processing waste
Inefficient work methods
Product defects
EXAM 2025 QUESTIONS WITH
CORRECTLY SOLVED
ANSWERS/NEWEST UPDATE
Save
Terms in this set (53)
,Students have to non-value-added time
change
buildings Such walks are not waste, as they
between classes, are required given the current lay-
which often out of the campus. However (unless
involves walks of the students take great joy in the
5 minutes or walk), they do not add value to the
more. Walking customer; they are thus non-value
from one add time.
building to
another is
a waste
non-value-
added time
value-added
time.
a processing step that does not
Non-Value
enhance the product but must be
Added
done
value added the time in which useful work is
time actually being done on the unit
,What are the two c Built-in quality and just-in-time
pillars of the Correct
Toyota
Production
System?
a Just-in-time
and waste
reduction
b Waste
reduction and
built-in quality
c Built-in quality
and just-in-time
d Process
improvement
and waste
reduction
Built-In Quality practices ensure that
each Solution element, at every
Built-in Quality increment, meets appropriate
quality standards throughout
development.
, a logistics process in which goods
arrive when needed for production,
just in time
use, or sale rather than sitting in
storage
Which of the b Overtime
following does
not belong to
the seven
sources of
waste?
a Rework
b Overtime
c Transportation
d Inventory
Inventory
Overproduction
Waiting time
Seven Sources
Unnecessary transporting
of Waste
Processing waste
Inefficient work methods
Product defects