ASQ CQT-Exam Questions With
Verified Correct Answers!!
In preparation for construction of a cause and
effect diagram, it is important to
(A) plot separate charts for each source
(B) focus only on what makes things go wrong
(C) record everything people suggest
(D) validate possible root causes - ✔✔C record everything people suggest
A quality technician uses a c chart to monitor the number of defects in a square foot of material.
After the initial startup period, the mean number of defects is calculated at 13.5. What should the
control limits be for the c chart?
LCL UCL
(A) 0.00 54.00
(B) 0.00 27.00
(C) 2.48 24.52
(D) 9.83 17.17 - ✔✔C 2.48 24.52
-
--
--
--
--
- ----------
The shape of the distribution above is best described as
(A) normal
(B) multi-modal
(C) positively skewed
, (D) negatively skew - ✔✔C positively skewed
A material review board (MRB) usually has the
responsibility for which of the following?
(A) Analyzing and dispositioning of nonconforming
material
(B) Defining the statistical specifications of
nonconforming material
(C) Assuring the availability of materials to
meet production schedules
(D) Controlling the cost of materials - ✔✔A Analyzing and dispositioning of
nonconforming material
The most common form of specification in manufacturing
facilities is the
(A) control plan
(B) operator instruction sheet
(C) blueprint
(D) in-process check sheet - ✔✔C blueprint
Statistical quality control generally requires inspection to be
conducted (A) at the warehouse to maintain quality of parts in storage
Verified Correct Answers!!
In preparation for construction of a cause and
effect diagram, it is important to
(A) plot separate charts for each source
(B) focus only on what makes things go wrong
(C) record everything people suggest
(D) validate possible root causes - ✔✔C record everything people suggest
A quality technician uses a c chart to monitor the number of defects in a square foot of material.
After the initial startup period, the mean number of defects is calculated at 13.5. What should the
control limits be for the c chart?
LCL UCL
(A) 0.00 54.00
(B) 0.00 27.00
(C) 2.48 24.52
(D) 9.83 17.17 - ✔✔C 2.48 24.52
-
--
--
--
--
- ----------
The shape of the distribution above is best described as
(A) normal
(B) multi-modal
(C) positively skewed
, (D) negatively skew - ✔✔C positively skewed
A material review board (MRB) usually has the
responsibility for which of the following?
(A) Analyzing and dispositioning of nonconforming
material
(B) Defining the statistical specifications of
nonconforming material
(C) Assuring the availability of materials to
meet production schedules
(D) Controlling the cost of materials - ✔✔A Analyzing and dispositioning of
nonconforming material
The most common form of specification in manufacturing
facilities is the
(A) control plan
(B) operator instruction sheet
(C) blueprint
(D) in-process check sheet - ✔✔C blueprint
Statistical quality control generally requires inspection to be
conducted (A) at the warehouse to maintain quality of parts in storage