Chapter 1 - (ANSWER)Chapter 1Business planning
Chapter 2 - (ANSWER)Licensing
Chapter 3 - (ANSWER)Financial management
Chapter 4 - (ANSWER)Risk management
Chapter 5 - (ANSWER)Labor law
Chapter 6 - (ANSWER)Workers comp
Chapter 7 - (ANSWER)Safety
Chapter 8 - (ANSWER)Contracts and liabilities
Chapter 9 - (ANSWER)Lien laws
Chapter 10 - (ANSWER)Project management
According to FS455 how many days is the complaint and all information pursue it to the
investigation by the department kept confidential and exempt from S.119.07(1) -
(ANSWER)Page 2 -47 the complaint and all information obtained pursuant to the
, FLORIDA CONTRACTORS MANUAL TEST FINAL EXAM AND PRACTICE EXAM QUESTIONS
CURRENTLY TESTING 2025 COMPLETE ACCURATE EXAM QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100% CORRECT ANSWERS)/ALREADY GRADED A+
investigation by the department are confidential and are exempt until 10 days after
probable cause has been found or until privilege of confidentiality is waived which ever
comes first
The law governing licensure of contractors in Florida is - (ANSWER)Page 2-5 Florida
statutes chapter 489 provide for the licensure and regulations of all types of contractors
in Florida
Incomplete contract exists at the time of death of a contractor the contract may be
completed by any contractor even though not certified or registered. - (ANSWER)Page
2-89 the contract may be completed by any person even though not certified or
registered and shall notify the board within 30 days after death of the contractor and the
board approves
A construction project is considered to be abandoned after ________ days if the
contractor terminate the project without proper notification to the owner and without just
cause - (ANSWER)Page 2-96 project is presumed abandon after 90 days if the
contractor terminates the project without just cause of proper notification to the owner or
fails to perform work without just cause for 90 consecutive days
Which of the following is not an act require disciplinary proceedings by the construction
industry licensing board - (ANSWER)Page 2-95&96 Aiding or abetting in an uncertified
or unregistered person to invade the provisions of this act
The scope of work of a building contractors limit to commercial and residential
construction which does not exceed ________ - (ANSWER)Page 2-69 building
contractor means a contractor whose services are limited to construction of commercial
buildings and single dwelling or multiple dwellings residential buildings which do not
exceed three stories in height
CURRENTLY TESTING 2025 COMPLETE ACCURATE EXAM QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100% CORRECT ANSWERS)/ALREADY GRADED A+
Chapter 1 - (ANSWER)Chapter 1Business planning
Chapter 2 - (ANSWER)Licensing
Chapter 3 - (ANSWER)Financial management
Chapter 4 - (ANSWER)Risk management
Chapter 5 - (ANSWER)Labor law
Chapter 6 - (ANSWER)Workers comp
Chapter 7 - (ANSWER)Safety
Chapter 8 - (ANSWER)Contracts and liabilities
Chapter 9 - (ANSWER)Lien laws
Chapter 10 - (ANSWER)Project management
According to FS455 how many days is the complaint and all information pursue it to the
investigation by the department kept confidential and exempt from S.119.07(1) -
(ANSWER)Page 2 -47 the complaint and all information obtained pursuant to the
, FLORIDA CONTRACTORS MANUAL TEST FINAL EXAM AND PRACTICE EXAM QUESTIONS
CURRENTLY TESTING 2025 COMPLETE ACCURATE EXAM QUESTIONS WITH DETAILED
VERIFIED ANSWERS (100% CORRECT ANSWERS)/ALREADY GRADED A+
investigation by the department are confidential and are exempt until 10 days after
probable cause has been found or until privilege of confidentiality is waived which ever
comes first
The law governing licensure of contractors in Florida is - (ANSWER)Page 2-5 Florida
statutes chapter 489 provide for the licensure and regulations of all types of contractors
in Florida
Incomplete contract exists at the time of death of a contractor the contract may be
completed by any contractor even though not certified or registered. - (ANSWER)Page
2-89 the contract may be completed by any person even though not certified or
registered and shall notify the board within 30 days after death of the contractor and the
board approves
A construction project is considered to be abandoned after ________ days if the
contractor terminate the project without proper notification to the owner and without just
cause - (ANSWER)Page 2-96 project is presumed abandon after 90 days if the
contractor terminates the project without just cause of proper notification to the owner or
fails to perform work without just cause for 90 consecutive days
Which of the following is not an act require disciplinary proceedings by the construction
industry licensing board - (ANSWER)Page 2-95&96 Aiding or abetting in an uncertified
or unregistered person to invade the provisions of this act
The scope of work of a building contractors limit to commercial and residential
construction which does not exceed ________ - (ANSWER)Page 2-69 building
contractor means a contractor whose services are limited to construction of commercial
buildings and single dwelling or multiple dwellings residential buildings which do not
exceed three stories in height