Exam (elaborations)

BICSI RTPM UPDATED ACTUAL Exam Questions and CORRECT ANSWERs

Rating
-
Sold
-
Pages
37
Grade
A+
Uploaded on
29-04-2025
Written in
2024/2025

terests of each stakeholder - ANSWER -Project Manager Procurement Management - ANSWER -Procurement of resources outside of the team, (materials & subcontractors) Client Needs Assessment - ANSWER -Starts with a meeting with the client to evaluate their needs ICT Professional must understand: - ANSWER -Industry, Business, Technology and Strategic plans ICT Professional should understand: - ANSWER -Strengths/ Weaknesses Vertical Market Unique Requirements Developing a Project Plan by ANSWERing Questions - ANSWER -Lessons Learned from previous projects What needs done (SOW) How will accidents be prevented (Safety Plan) Who will affect or be affected (Stakeholder MGMT) Who should participate in project plan (OBS) Who performs each task (WBS) When is each task performed (PERT, CPM, Gantt) What is the Project Budget (EVM) How will the quality be checked (Quality Plan) How will risks be assessed (Risk plan) How will communication be tracked (Comm MGMT) Lessons Learned Questions - ANSWER -What went right/ wrong What produced best results What processes can be improved Did we learn anything Corrective Action Plan - ANSWER -Should be developed for the purpose of continuous quality Request for Proposal (RFP) - ANSWER -Invitation for a contractor to submit proposal for a service What dictates scope but leaves the decisions to the firm? - ANSWER -RFP It is advisable for the project manager to send the 90% draft of the RFP to the: - ANSWER -Project Manager's Legal Team Parts of the RFP - ANSWER -Cover Letter Executive Summary Background Description of Solution Concept Drawing Projected Pricing Business References Code of Silence - ANSWER -An oath by a solicitor, or other employee, not to disclose any information in regards to the RFP Violating the Code of Silence: - ANSWER -will automatically disqualify the proposal and the company could be further penalized in future RFP submittals Design Team Members - ANSWER -Owner Architect Professional Engineer Consultant Owner - ANSWER -Defines requirements, provides approval @ each design phase Architect - ANSWER -Lead design professional, hired by the owner Who usually hires professional engineers and consultants? - ANSWER -Architect Professional Engineer - ANSWER -A licensed design professional, recognized by a state or local authority, who focuses on the design of a specific system or requirement (e.g., civil, structural, mechanical, electrical). Many members of an engineering firm are ICT professionals who are supervised by a PE. Consultant - ANSWER -A design professional, recognized by an industry or industry association, who focuses on the design of a specific system or requirement that does not require a PE designation. Construction Team Members - ANSWER -Construction Manager Construction Manager at Risk (CMAR) General Contractor Contractors/ Subcontractor Construction Manager - ANSWER -Hired by Owner to assist in the management

Show more Read less
Institution
BICSI RTPM UPDATED
Course
BICSI RTPM UPDATED











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BICSI RTPM UPDATED
Course
BICSI RTPM UPDATED

Document information

Uploaded on
April 29, 2025
Number of pages
37
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

BICSI RTPM UPDATED ACTUAL Exam Questions and
CORRECT ANSWERs


terests of each stakeholder - ANSWER -Project Manager

Procurement Management - ANSWER -Procurement of resources outside of the
team, (materials & subcontractors)

Client Needs Assessment - ANSWER -Starts with a meeting with the client to
evaluate their needs

ICT Professional must understand: - ANSWER -Industry, Business, Technology
and Strategic plans

ICT Professional should understand: - ANSWER -Strengths/ Weaknesses
Vertical Market
Unique Requirements

Developing a Project Plan by ANSWERing Questions - ANSWER -Lessons
Learned from previous projects
What needs done (SOW)
How will accidents be prevented (Safety Plan)
Who will affect or be affected (Stakeholder MGMT)
Who should participate in project plan (OBS)
Who performs each task (WBS)
When is each task performed (PERT, CPM, Gantt)
What is the Project Budget (EVM)
How will the quality be checked (Quality Plan)
How will risks be assessed (Risk plan)
How will communication be tracked (Comm MGMT)

Lessons Learned Questions - ANSWER -What went right/ wrong
What produced best results

,What processes can be improved
Did we learn anything
Corrective Action Plan - ANSWER -Should be developed for the purpose of
continuous quality

Request for Proposal (RFP) - ANSWER -Invitation for a contractor to submit
proposal for a service

What dictates scope but leaves the decisions to the firm? - ANSWER -RFP

It is advisable for the project manager to send the 90% draft of the RFP to the: -
ANSWER -Project Manager's Legal Team

Parts of the RFP - ANSWER -Cover Letter
Executive Summary
Background
Description of Solution
Concept Drawing
Projected Pricing
Business References

Code of Silence - ANSWER -An oath by a solicitor, or other employee, not to
disclose any information in regards to the RFP

Violating the Code of Silence: - ANSWER -will automatically disqualify the
proposal and the company could be further penalized in future RFP submittals

Design Team Members - ANSWER -Owner
Architect
Professional Engineer
Consultant

Owner - ANSWER -Defines requirements, provides approval @ each design
phase

,Architect - ANSWER -Lead design professional, hired by the owner
Who usually hires professional engineers and consultants? - ANSWER -Architect

Professional Engineer - ANSWER -A licensed design professional, recognized by
a state
or local authority, who focuses on the design of a specific system or requirement
(e.g., civil, structural, mechanical, electrical). Many members of an engineering
firm are
ICT professionals who are supervised by a PE.

Consultant - ANSWER -A design professional, recognized by an industry or
industry association, who focuses on the design of a specific system or
requirement that does not require a PE designation.

Construction Team Members - ANSWER -Construction Manager
Construction Manager at Risk (CMAR)
General Contractor
Contractors/ Subcontractor

Construction Manager - ANSWER -Hired by Owner to assist in the management
of a bid

Construction Managers can also be - ANSWER -General Contractors

CMAR - ANSWER -CM but acts as the consultant to the owner, or as GC during
construction
Usually the low bidder

General Contractor - ANSWER -Hired by owner to complete work

Contractor/ Subcontractor - ANSWER -Hired by owner or general contractor to
complete a portion of work

Design Phases - ANSWER -Schematic Design
Design Development

, Construction Document

Schematic Design - ANSWER -Prepared for the owner, includes sketches,
graphics, logical diagrams, general design criteria and cost estimates

Design Development - ANSWER -After schematic designs approved by owner,
design team begins design development
Includes outline, specs, drawing and cost estimates

Formal reviews begin at what percentage of design development - ANSWER -50
and 80

Construction Documents - ANSWER -After owner approves DD, design team
prepares ___________ __________, which are used to obtain pricing of required
work

Owner Bidding Role - ANSWER -Supplies bidding and contracting requirements,
sends invites to prospective bidders

Design Team Bidding Role - ANSWER -Produce any Addenda based on the
QBD

Construction Manager Bidding Role - ANSWER -May lead or participate in bid
process

General Contractor Bidding Roles - ANSWER -Prepare and submit their bids to
the owner

Contractor, Subcontractor Bidding Roles - ANSWER -Prepare and submit their
bids to the General Contractor

Types of Bid Structures - ANSWER -RFP
RFQ
DBB
DB
$15.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
rachaelmumbi

Get to know the seller

Seller avatar
rachaelmumbi Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
9 months
Number of followers
0
Documents
53
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions