• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

CHFM Study Guide Exam Questions And Answers Latest Updated 2025 100% Verified.

Document preview thumbnail
Preview 3 out of 17 pages

©EVERLY 2025 ALL RIGHTS RESERVED 1 CHFM Study Guide Exam Questions And Answers Latest Updated 2025 100% Verified. A project estimator is developing a cost estimate for construction of a new diagnostic imaging wing. The projected costs are: Fixed equipment installation charges $700,000 Site isolation $50,000 Annual utilities $425,000 Construction materials $1,200,000 Portable equipment $900,000 Annual depreciation $275,000 What are the expected contractor expenses? - Answer1,600,000 Which of the following contribute to typical general contractor fees: 1. Permit and inspection fees ©EVERLY 2025 ALL RIGHTS RESERVED 2 2. General conditions 3. Overhead and profit 4. Site condition assessment fees - Answer2, 3, and 4 Demand side management (DSM) programs are developed and offered to organizations by energy providers to do which of the following during peak service? - AnswerProvide emergency energy demand sources When developing a preventive maintenance program, a facility manager should ensure that an annual test is conducted on every required battery-powered lighting system. This test should be run for NOT less than: - Answer30 seconds In existing facilities, doors that open onto exit corridors should have 1-3/4 inch solid bonded wood core or be of construction that resists fire for NOT less than: - Answer20 minutes Total dissolved solids in a cooling tower are regulated by: - AnswerVariable speed drive fans What contracts requires a schedule of values when negotiating? - AnswerGuaranteed maximum price A project has a budget of $6,600,000. Planning and design fees are estimated at $700,000 and construction expenses are estimated at $5,100,000. What is the amount of a 10% construction contingency? - Answer580,000 The Joint Commission standards require that an organization develop and implement a policy to prohibit smoking except in specified circumstances. The standard is intended to reduce risks of: ©EVERLY 2025 ALL RIGHTS RESERVED 3 1. Possible adverse effects on care, treatment, and services to people who smoke 2. Passive smoke to others 3. Fire 4. False alarms - Answer2, 3, and 4 When planning demolition, construction, or renovation, an organization selects and implements proper controls to reduce risk and minimize the impact of these activities on infection control. Which of the following are proper controls within the construction area: 1. Providing negative air machines 2. Installing dust barriers 3. Wet-mopping the floors 4. Ensuring debris-free job site - Answer2, 3, and 4 A facility is installing an air intake for a medical air compressor. What is the minimum heights, in ft., at which this should be located above the ground? - Answer5 When using a load bank to perform a load test on an Emergency Power Supply System (EPSS) because the monthly test could not achieve 30% of the name plate load rating, the test is run for a minimum of: - Answer30 minutes The process of a hospital construction project close-out by the contractor includes:

Content preview

©EVERLY 2025 ALL RIGHTS RESERVED




CHFM Study Guide Exam Questions And
Answers Latest Updated 2025 100% Verified.



A project estimator is developing a cost estimate for construction of a new diagnostic imaging
wing. The projected costs are:


Fixed equipment installation charges $700,000


Site isolation $50,000


Annual utilities $425,000


Construction materials $1,200,000


Portable equipment $900,000


Annual depreciation $275,000



What are the expected contractor expenses? - Answer✔1,600,000


Which of the following contribute to typical general contractor fees:


1. Permit and inspection fees

1

, ©EVERLY 2025 ALL RIGHTS RESERVED




2. General conditions


3. Overhead and profit



4. Site condition assessment fees - Answer✔2, 3, and 4


Demand side management (DSM) programs are developed and offered to organizations by
energy providers to do which of the following during peak service? - Answer✔Provide
emergency energy demand sources


When developing a preventive maintenance program, a facility manager should ensure that an
annual test is conducted on every required battery-powered lighting system. This test should be
run for NOT less than: - Answer✔30 seconds


In existing facilities, doors that open onto exit corridors should have 1-3/4 inch solid bonded
wood core or be of construction that resists fire for NOT less than: - Answer✔20 minutes



Total dissolved solids in a cooling tower are regulated by: - Answer✔Variable speed drive fans



What contracts requires a schedule of values when negotiating? - Answer✔Guaranteed
maximum price


A project has a budget of $6,600,000. Planning and design fees are estimated at $700,000 and
construction expenses are estimated at $5,100,000. What is the amount of a 10% construction
contingency? - Answer✔580,000


The Joint Commission standards require that an organization develop and implement a policy
to prohibit smoking except in specified circumstances. The standard is intended to reduce risks
of:

2

, ©EVERLY 2025 ALL RIGHTS RESERVED




1. Possible adverse effects on care, treatment, and services to people who smoke


2. Passive smoke to others


3. Fire



4. False alarms - Answer✔2, 3, and 4


When planning demolition, construction, or renovation, an organization selects and
implements proper controls to reduce risk and minimize the impact of these activities on
infection control. Which of the following are proper controls within the construction area:


1. Providing negative air machines


2. Installing dust barriers


3. Wet-mopping the floors



4. Ensuring debris-free job site - Answer✔2, 3, and 4


A facility is installing an air intake for a medical air compressor. What is the minimum heights, in
ft., at which this should be located above the ground? - Answer✔5


When using a load bank to perform a load test on an Emergency Power Supply System (EPSS)
because the monthly test could not achieve 30% of the name plate load rating, the test is run
for a minimum of: - Answer✔30 minutes


The process of a hospital construction project close-out by the contractor includes:
3

Document information

Uploaded on
April 23, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Everly
4.3
(4)
Sold
32
Followers
1
Items
2748
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions