What are the requirements for a new patient room door for a healthcare occupancy? -
Answer✔45.5 inches wide & smoke tight
What are the typical contractor responsibilities during healthcare construction? -
Answer✔Operations manuals
Maintenance Manuals
Punch list
TAB Reports
Medical gas verification
What is a TAB report? - Answer✔Testing Adjustment Balancing Report
What are typically NOT a contractor's responsibility during healthcare construction? -
Answer✔Final cleaning
Training
What type of rooms require 2 total outdoor air changes? - Answer✔Patient room
NICU
ICU
CCU
1
, ©EVERLY 2025 ALL RIGHTS RESERVED
Airborne Infection Isolation Room
Protective environment room
Radiology waiting
ED waiting
Triage
What type of rooms require 3 total outdoor air changes? - Answer✔Procedure room
What type of rooms require 4 total outdoor air changes? - Answer✔OR room
Delivery room
What type of rooms require 4 total air changes? - Answer✔Patient room
What type of rooms require 6 total air changes? - Answer✔NICU
ICU
CCU
What type of rooms require 12 total air changes? - Answer✔Isolation room
Protective environment room
ED Waiting
Radiology waiting
Triage
What type of room requires 20 total air changes? - Answer✔OR room
A patient room requires how many total Outdoor ACH and how many total ACH? - Answer✔2
Total outdoor air changes
2