CQM-C QUESTTIONS WITH CORRECT
ANSWERS
The purpose of Construction Quality Management is to: - answer-Achieve the quality
c c c c c c c c c c c
established by properly developed requirements through the combined responsibility,
c c c c c c c c c
but seperate efforts of contractpr smd government personnel.
c c c c c c c c
Construction Quality Management is the performance of tasks, which ensure that
c c c c c c c c c c
construction is performed. - answer-According to plans and specifications, on time,
c c c c c c c c c c c
within a defined budget and a safe work environment.
c c c c c c c c c
Partnering relationships are based upon: - answer-Building trust and dedication to
c c c c c c c c c c
common goals
c c
It is the responsibility of Quality Assurance Personnel to: - answer-Periodically verify that
c c c c c c c c c c c c
cthe contractors system of control is working effectively.
c c c c c c c
An effective contractor quality control program will: - answer-Be an incentive for work to
c c c c c c c c c c c c c
be done correctly the first time resulting in earlier completion, reduced field overhead
c c c c c c c c c c c c c
costs, and greater profits.
c c c c
The success or failure of all contractors is based upon: - answer-The ability to control
c c c c c c c c c c c c c c
costs, finance work, estimate jobs, schedule the work, and maintain effective quality
c c c c c c c c c c c c
control.
c
Quality Assurance Personnel have the responsibility to: - answer-Require contractors to
c c c c c c c c c c
maintain the quality specified in the plans and specifications.
c c c c c c c c c
Inspection is: - answer-The process by which ongoing and completed work is examined
c c c c c c c c c c c c
During the punch-out inspection of a project: - answer-Quality Assurance Personnel
c c c c c c c c c c
must assure that the contractor prepares a punch-list and makes corrections.
c c c c c c c c c c c
If there is a disagreement whether the contractors work complies with the contract: -
c c c c c c c c c c c c c
canswer-The government makes the final determination c c c c c
Characteristics that describe a definable feature of work include: - answer-Cross-
c c c c c c c c c c
referenced listings to the contractors construction schedule that may have more than
c c c c c c c c c c c
cone definable feature under a section of the specifications.
c c c c c c c c
ANSWERS
The purpose of Construction Quality Management is to: - answer-Achieve the quality
c c c c c c c c c c c
established by properly developed requirements through the combined responsibility,
c c c c c c c c c
but seperate efforts of contractpr smd government personnel.
c c c c c c c c
Construction Quality Management is the performance of tasks, which ensure that
c c c c c c c c c c
construction is performed. - answer-According to plans and specifications, on time,
c c c c c c c c c c c
within a defined budget and a safe work environment.
c c c c c c c c c
Partnering relationships are based upon: - answer-Building trust and dedication to
c c c c c c c c c c
common goals
c c
It is the responsibility of Quality Assurance Personnel to: - answer-Periodically verify that
c c c c c c c c c c c c
cthe contractors system of control is working effectively.
c c c c c c c
An effective contractor quality control program will: - answer-Be an incentive for work to
c c c c c c c c c c c c c
be done correctly the first time resulting in earlier completion, reduced field overhead
c c c c c c c c c c c c c
costs, and greater profits.
c c c c
The success or failure of all contractors is based upon: - answer-The ability to control
c c c c c c c c c c c c c c
costs, finance work, estimate jobs, schedule the work, and maintain effective quality
c c c c c c c c c c c c
control.
c
Quality Assurance Personnel have the responsibility to: - answer-Require contractors to
c c c c c c c c c c
maintain the quality specified in the plans and specifications.
c c c c c c c c c
Inspection is: - answer-The process by which ongoing and completed work is examined
c c c c c c c c c c c c
During the punch-out inspection of a project: - answer-Quality Assurance Personnel
c c c c c c c c c c
must assure that the contractor prepares a punch-list and makes corrections.
c c c c c c c c c c c
If there is a disagreement whether the contractors work complies with the contract: -
c c c c c c c c c c c c c
canswer-The government makes the final determination c c c c c
Characteristics that describe a definable feature of work include: - answer-Cross-
c c c c c c c c c c
referenced listings to the contractors construction schedule that may have more than
c c c c c c c c c c c
cone definable feature under a section of the specifications.
c c c c c c c c