GCOR ACTUAL TEST PAPER 2025 QUESTIONS WITH SOLUTIONS GUARANTEE A+ What is required before utility employee may work on, under, or in between rolling equipment? (5.13.1B) - 1. All members of the crew must communicate with each other to understand the work to be done. 2. The engineer must be in the cab of the assigned controlling locomotive. However, another member of the same crew may replace the engineer when the locomotive is stationary. What conditions must be met before a utility employee may be released from a train or yard crew? (5.13.1C) - 1. The utility employee has notified the designated crew member of the work is completed. 2. The designated crew member has notified each crew member that the utility employee is being released. 3. The designated crew member has released the utility employee from the train or yard crew, after each crew member has acknowledged this notice. What must a train have before occupying and initiating movement on the main track? (6.2, 6.3) - 1. Track bulletins affecting their movement. 2. Main track authorization.

Content preview

GCOR ACTUAL TEST PAPER 2025 QUESTIONS WITH
SOLUTIONS GUARANTEE A+
✔✔What is required before utility employee may work on, under, or in between rolling
equipment? (5.13.1B) - ✔✔1. All members of the crew must communicate with each
other to understand the work to be done.
2. The engineer must be in the cab of the assigned controlling locomotive. However,
another member of the same crew may replace the engineer when the locomotive is
stationary.

✔✔What conditions must be met before a utility employee may be released from a train
or yard crew? (5.13.1C) - ✔✔1. The utility employee has notified the designated crew
member of the work is completed.
2. The designated crew member has notified each crew member that the utility
employee is being released.
3. The designated crew member has released the utility employee from the train or yard
crew, after each crew member has acknowledged this notice.

✔✔What must a train have before occupying and initiating movement on the main
track?
(6.2, 6.3) - ✔✔1. Track bulletins affecting their movement.
2. Main track authorization.

✔✔Which rules authorize a train to occupy a main track?
6.3 - ✔✔- Rule 6.13, Yard limits.
- Rule 6.14, restricted limits.
- Rule 6.15, block register territory.
- Rule 9.14, movement with the current of traffic.
- Rule 9.15, track permits.
- Rule 10.1, authority to enter CTC limits.
- Rule 14.1, authority to enter TWC limits.
- Rule 14.6, movement against the current of traffic.
- Rule 15.3, authorizing movement against the current of traffic.
- Rule 16.1, authority to enter DTC limits.
- At manual interlockings, verbal authority from the control operator or a controlled
signal that indicates proceed.
- Special instructions or general order.

✔✔If you have authority joint with another employee or another train when may you
occupy the overlapping limits of this authority? (6.3) - ✔✔1. When working limits are
described and information is received to enter the overlapping limits from the employees
listed on the authority.
2. Advice is received from the train dispatcher or a control operator that the employees
have reported clear of the limits.

, ✔✔In Train Coordination, what is a train's authority used to establish? (6.3.1) -
✔✔Working limits for men or equipment.

✔✔May a maintenance of way foreman request train coordination if the train's authority
he is trying to use is not stopped and in view? (6.3.1) - ✔✔No, the train must be in view
and stopped.

✔✔When may an engineer make movements when Train Coordination has been
established with his train? (6.3.1) - ✔✔Only as permitted by the employee in charge of
the working limits established, until the working limits have been released to the
engineer.

✔✔Where can reverse movements be made? (6.4) - ✔✔On any main track, controlled
siding, or on any track where block system is in effect, within the limits a train has
authority to occupy the main track.

✔✔How are reverse movements made? (6.4) - ✔✔At restricted speed.

✔✔When is permission required for a reverse movement? (6.4) - ✔✔1. When
movement will be made outside the currently occupied signal block.
2. When working limits are established.

✔✔Who can give permission for a reverse movement? (6.4) - ✔✔1. The train
dispatcher, when leaving the currently occupied signaled blocked.
2. When working limits are established, the employee in charge of the working limits.

✔✔What must be determined before equipment can be shoved? (6.5) - ✔✔1. The
portion of the track to be used is clear.
2. The track will remain clear for the duration of the movement.
3. All switches and derails are lined properly.

✔✔At what speed must movements be made when cars are being shoved on a main
track or controlled siding in the direction authorized? (6.5) - ✔✔Max 30 mph in
passenger, 20 mph in freight.

✔✔When must a train protect against unusual conditions? (6.21) - ✔✔Whenever it is
necessary for their safety.

✔✔How are trains required to approach potentially hazardous points? (6.21) -
✔✔Prepared to stop.

✔✔Who can authorize a train to operate through water that is three or more inches
above the rail? (6.21) - ✔✔Mechanical department supervisor.

Document information

Uploaded on
April 22, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Pyramids
4.0
(2)
Sold
22
Followers
3
Items
7772
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions