The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Schedule by 10 MWs. -Correct Answer A) Increase Net Interchange Schedule by 20 MWs. A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the change of which of the following values? 1. Actual Net Interchange 2. Scheduled Frequency 3. Scheduled Net Interchange 4. Area Control Error A) 4 only B) 1 & 3 C) 1 & 4 D) 3 & 4 -Correct Answer C) 1 & 4 Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency, and all __________. A) Tie lines readings B) Generators output C) Scheduled frequency indications D) Transformer load -Correct Answer A) Tie lines readings Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE? A) -100 B) 0 C) 10 D) 100 -Correct Answer A) -100 A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a summer day. The Net Interchange Actual for those same hours respectively were -230 MW, -275 MW, -250 MW and -270 MW. What was the Balancing Authority's Inadvertent Interchange for the 4-hour period? A) 6 MWs out B) 25 MWs in C) 25 MWs out D) 6 MWs in -Correct Answer B) 25 MWs in For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and all ________________ must be metered. A) Generation B) Communications C) Transformers D) Tie lines -Correct Answer D) Tie lines If the frequency bias setting is set to a less negative value than the frequency response of a Balancing Authority and a frequency increase is caused by a sudden loss of load in an external balancing area, what will be the result? A) The ACE will be zero and will take no AGC action B) The ACE will be a negative value and AGC will increase generation C) The ACE will be a positive value and AGC will lower generation D)This will not affect the ACE -Correct Answer B) The ACE will be a negative value and AGC will increase generation If the frequency bias setting is less negative than the frequency response of a Balancing Authority and a frequency decline is caused by a sudden loss of generation in an external balancing area, what will be the result? A) The ACE will be a negative value and AGC will increase generation. B) This will not affect the ACE. C) The ACE will be a positive value and AGC will lower generation. D) The ACE will be zero and will take no AGC action. -Correct Answer C) The ACE will be a positive value and AGC will lower generation. It is the responsibility of which entity/entities to develop, maintain, and implement load shedding plans? A) Transmission Operators and Balancing Authorities B) Reliability Coordinator C) Load Serving Entities D) Balancing Authority -Correct Answer A) Transmission Operators and Balancing Authorities A Transmission line is loaded 25% above its SOL. A parallel line is out for routine maintenance and can be placed in service in 10 minutes. What is the first step the Operator should take to reduce the line loading?

Vista previa del contenido

SOS NERC



SOS NERC PREP RELIABILITY ACTUAL EXAM 2025
The Reliability Coordinator just informed you of a slow time error correction which will
begin at the top of the next hour. Your EMS system will not let you change your
scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should
you take?


A) Increase Net Interchange Schedule by 20 MWs.


B) Inform the Reliability Coordinator that you cannot participate in the time error
correction.


C) Decrease Net Interchange Schedule by 20 MWs.



D) Increase Net Interchange Schedule by 10 MWs. -Correct Answer ✔A) Increase Net
Interchange Schedule by 20 MWs.


A Balancing Authority has a sudden loss of a large block of load in its area. This loss will
be seen instantaneously in the change of which of the following values?


1. Actual Net Interchange
2. Scheduled Frequency
3. Scheduled Net Interchange
4. Area Control Error


A) 4 only
B) 1 & 3



SOS NERC

,SOS NERC


C) 1 & 4

D) 3 & 4 -Correct Answer ✔C) 1 & 4


Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties,
actual frequency, and all __________.




A) Tie lines readings
B) Generators output
C) Scheduled frequency indications

D) Transformer load -Correct Answer ✔A) Tie lines readings


Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual
Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If Balancing
Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE?


A) -100
B) 0
C) 10

D) 100 -Correct Answer ✔A) -100


A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600
on a summer day. The Net Interchange Actual for those same hours respectively were -
230 MW, -275 MW, -250 MW and -270 MW. What was the Balancing Authority's
Inadvertent Interchange for the 4-hour period?


A) 6 MWs out



SOS NERC

,SOS NERC


B) 25 MWs in
C) 25 MWs out

D) 6 MWs in -Correct Answer ✔B) 25 MWs in


For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and
all ________________ must be metered.


A) Generation
B) Communications
C) Transformers

D) Tie lines -Correct Answer ✔D) Tie lines


If the frequency bias setting is set to a less negative value than the frequency response
of a Balancing Authority and a frequency increase is caused by a sudden loss of load in
an external balancing area, what will be the result?


A) The ACE will be zero and will take no AGC action


B) The ACE will be a negative value and AGC will increase generation


C) The ACE will be a positive value and AGC will lower generation



D)This will not affect the ACE -Correct Answer ✔B) The ACE will be a negative value and
AGC will increase generation




SOS NERC

, SOS NERC


If the frequency bias setting is less negative than the frequency response of a Balancing
Authority and a frequency decline is caused by a sudden loss of generation in an
external balancing area, what will be the result?


A) The ACE will be a negative value and AGC will increase generation.


B) This will not affect the ACE.


C) The ACE will be a positive value and AGC will lower generation.


D) The ACE will be zero and will take no AGC action. -Correct Answer ✔C) The ACE will be
a positive value and AGC will lower generation.


It is the responsibility of which entity/entities to develop, maintain, and implement load
shedding plans?


A) Transmission Operators and Balancing Authorities


B) Reliability Coordinator


C) Load Serving Entities



D) Balancing Authority -Correct Answer ✔A) Transmission Operators and Balancing
Authorities


A Transmission line is loaded 25% above its SOL. A parallel line is out for routine
maintenance and can be placed in service in 10 minutes. What is the first step the
Operator should take to reduce the line loading?


SOS NERC

Información del documento

Subido en
16 de abril de 2025
Número de páginas
253
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$23.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PossibleA
3.9
(149)
Vendido
1060
Seguidores
651
Artículos
13881
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes