©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+ 1 General Contractor License Exam Questions And Answers |Latest 2025 | Guaranteed Pass When a repair must be performed in a emergency situation, when shall the permit application be submitted? - AnswerThe next working business day Section 105.2.1 Emergency Repairs Once the permit has been issued, how long is it valid? - Answer180 days Section 105.5- Expiration How long should a permit remain at the site of the work? - AnswerUntil the completion of the project Section 105.7 Placement of permit What included within the "Exterior wall envelope"? - Answerflashing intersections with dissimilar materials, corners, end details, control joints, intersections at roofs, eaves or parapets, means of drainage, water-resistive membranes and details around openings. Built-Up roof covering consist of - AnswerTwo or more layers of felt cemented together and surfaced with a cap sheet, mineral aggregate, smooth coating or similar surfacing material Chapter 2- Definition-Built-up Roof covering Positive roof drainage will ensure drainage of the roof within ___ hours of precipitation - Answer48 hours ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+ 2 Chapter 2 Positive roof drainage An example of a live load on a roof includes? - AnswerDuring maintenance by workers, during the life of the structure by movable objects, and by the use and occupancy of the roof for roof gardens or assembly areas Chap 2 Live loads, ROOF A _____ is the process of installing an additional roof covering over a prepared existing roof covering without removing the existing roof. - AnswerRoof Recover Chap 2 Definitions roof recover Parapet walls shall be not less than _____ inches above the point where the roof surface and the wall intersect - Answer30 inches Section 705.11.1 Parapet Construction What is the requirement for combustible roof insulation? - AnswerIt must be covered by an approved roof covering Section 720.5 roof insulation An opening not less than 20"x30" shall be provided to any attic area having a clear height of over_____ - Answer30 inches Section 1208.2 Access to Unoccupied Spaces- Attics Spaces Flashing shall be installed at the perimeters of exterior door and window assemblies, penetrations and terminations of exterior wall assemblies, and what other locations? - AnswerExterior wall intersections with roofs, chimneys, porches, decks, balconies and similar projections and at built-in gutters and similar locations where moisture could enter the wall Section 1404.4 Installation of wall covering flashing ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+ 3 When a scupper is used as secondary roof drainage, what is the minimum opening size of the scupper? - Answer4 inches Section 1502.3 Scuppers A cricket shall be installed where a roof penetration is greater than ___ inches wide when measured perpendicular to the slope? - Answer30 inches Section 1503.5 Cricket and Saddles A building with aggregate roofing in an area with a nominal design wind speed of 110 mph in exposure category C can have a maximum roof height of how many feet - AnswerNo permitted Table 1504.8 Table for Maximum allowed mean roof height permitted for buildings aggregate on the roof outside an HVHZ How many layers of underlayment are required for an asphalt shingle roof with a slope of 2:12? - Answer2 layers Section 1507.2.2- Asphalt Shingles Slope How far into asphalt shingle roofing materials shall fasteners penetrate into the roof sheathing? - AnswerMinimum of 3/4" Section 1507.2.5 Fasteners An ice barrier shall extend from the lowest edge of the roof surface a point at least ___ inside the exterior wall line of the building - Answer24 inches Section 1507.2.1 Ice barrier What is the minimum thickness, in inches, of cap flashing for a roof? - Answer.019 inches Section 1507.2.8.1 Base and cap flashing

Content preview

©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+




General Contractor License Exam Questions
And Answers |Latest 2025 | Guaranteed Pass



When a repair must be performed in a emergency situation, when shall the permit application
be submitted? - Answer✔The next working business day
Section 105.2.1 Emergency Repairs



Once the permit has been issued, how long is it valid? - Answer✔180 days
Section 105.5- Expiration



How long should a permit remain at the site of the work? - Answer✔Until the completion of the
project
Section 105.7 Placement of permit



What included within the "Exterior wall envelope"? - Answer✔flashing intersections with
dissimilar materials, corners, end details, control joints, intersections at roofs, eaves or
parapets, means of drainage, water-resistive membranes and details around openings.



Built-Up roof covering consist of - Answer✔Two or more layers of felt cemented together and
surfaced with a cap sheet, mineral aggregate, smooth coating or similar surfacing material
Chapter 2- Definition-Built-up Roof covering


Positive roof drainage will ensure drainage of the roof within ___ hours of precipitation -
Answer✔48 hours

1

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+


Chapter 2 Positive roof drainage



An example of a live load on a roof includes? - Answer✔During maintenance by workers, during
the life of the structure by movable objects, and by the use and occupancy of the roof for roof
gardens or assembly areas


Chap 2 Live loads, ROOF


A _____ is the process of installing an additional roof covering over a prepared existing roof
covering without removing the existing roof. - Answer✔Roof Recover
Chap 2 Definitions roof recover


Parapet walls shall be not less than _____ inches above the point where the roof surface and
the wall intersect - Answer✔30 inches
Section 705.11.1 Parapet Construction



What is the requirement for combustible roof insulation? - Answer✔It must be covered by an
approved roof covering
Section 720.5 roof insulation


An opening not less than 20"x30" shall be provided to any attic area having a clear height of
over_____ - Answer✔30 inches
Section 1208.2 Access to Unoccupied Spaces- Attics Spaces


Flashing shall be installed at the perimeters of exterior door and window assemblies,
penetrations and terminations of exterior wall assemblies, and what other locations? -
Answer✔Exterior wall intersections with roofs, chimneys, porches, decks, balconies and similar
projections and at built-in gutters and similar locations where moisture could enter the wall
Section 1404.4 Installation of wall covering flashing



2

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+


When a scupper is used as secondary roof drainage, what is the minimum opening size of the
scupper? - Answer✔4 inches
Section 1502.3 Scuppers


A cricket shall be installed where a roof penetration is greater than ___ inches wide when
measured perpendicular to the slope? - Answer✔30 inches
Section 1503.5 Cricket and Saddles


A building with aggregate roofing in an area with a nominal design wind speed of 110 mph in
exposure category C can have a maximum roof height of how many feet - Answer✔No
permitted
Table 1504.8 Table for Maximum allowed mean roof height permitted for buildings aggregate
on the roof outside an HVHZ


How many layers of underlayment are required for an asphalt shingle roof with a slope of 2:12?
- Answer✔2 layers
Section 1507.2.2- Asphalt Shingles Slope


How far into asphalt shingle roofing materials shall fasteners penetrate into the roof sheathing?
- Answer✔Minimum of 3/4"
Section 1507.2.5 Fasteners


An ice barrier shall extend from the lowest edge of the roof surface a point at least ___ inside
the exterior wall line of the building - Answer✔24 inches
Section 1507.2.1 Ice barrier



What is the minimum thickness, in inches, of cap flashing for a roof? - Answer✔.019 inches
Section 1507.2.8.1 Base and cap flashing




3

, ©BRIGHTSTARS 2025 ALL RIGHTS RESERVED 9:46 AM A+


For a tile roof with a slope of 5 in 12, what is the minimum number of layers of underlayment
and lap? - Answer✔1 layer lapped 2 inches
Table 1507.1.1(2) - Clay and concrete tile


Valley flashing shall extend at least ____ from the centerline of the valley each way. -
Answer✔11 inches
Section 1507.3.9 - Flashing


What is the minimum roof slope allowed for the installation of standing-seam metal roof
panels? - Answer✔1/4 unit vertical in 12 horizontal
Section 1507.4.2- Metal Roof Panels-Deck slope #3



What is the head lap of slate shingle installed on a roof that is 5 in 12? - Answer✔4 inches
Table 1507.7.6 Slate Shingle Head Lap



What is the minimum slope allowed for the installation of wood shingles? - Answer✔3 units
vertical in 12 units horizontal
Section 1507.8.2 Wood shingles - Deck Slope


What is the minimum nominal thickness of spaced sheathing boards used as decking for wood
shakes? - Answer✔1 inch
Section 1507.9.1-wood shakes-deck requirements


A 90 clock tower which is 500 sf in area would be required to be constructed of and supported
on what type of construction? - Answer✔Type I or II conctruction
Section 1510.5 Towers, spires, domes and cupolas


Roof replacement is required to remove all layers of roofing down to the roof deck except for :
ice barrier membranes which are adhered to the roof deck. Where the existing roof cover is

4

Document information

Uploaded on
April 16, 2025
Number of pages
42
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brightstars
3.3
(41)
Sold
269
Followers
7
Items
14962
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions