PROFESSIONAL PRACTICE
REFRESHER
- ANSWER-*OTHER TOPICS YOU SHOULD KNOW*
- ANSWER-If the owner wants to build a house after 1 year, how much is the fee?
- ANSWER-If the project's budget is constrained, what means should be used to achieve 3D
understanding of the project?
a. Animation
b. Scale Model
c. Perspective
d. Manual Sketch
- ANSWER-The Owner likes a particular bidder. He is delayed and fails to beat the deadline. What
factors can be considered so that he can still join the bid?
*PLANNING MANDATES OF H.L.U.R.B.*
▪ Formulate guidelines for Comprehensive Land Use Planning (CLUP)
▪ Assist cities and municipalities in preparing their CLUPs
▪ Assist Provincial Land Use Committees (PLUC) and Regional Land Use Committees (RLUC) in reviewing
CLUPs
▪ Review and approve CLUP's for highly urbanized cities and Provincial Physical Framework Plans (PPFPs)
▪ Monitor actual land use and the implementation of CLUPs by local government units
▪ Update and revise the National Urban Development and Housing Framework
▪ Train LGUs in subdivision plan approval and zoning enforcement - ANSWER-Most notably *Executive
Order 90* which renamed it as the *"HOUSING and Land Use Regulatory Board (H.L.U.R.B)"*
The *Housing and Land Use Regulatory Board* is the sole regulatory body for housing and land use
development.
,PROFESSIONAL PRACTICE
REFRESHER
In order to achieve the goal of rational land use, the HLURB performs the twin roles of enhancing the
reinforcing rational housing and real estate service delivery through the implementation of the following
three (3) strategies: policy, planning and regulation. *HLURB* approves condominium plans protect
buyers of housing units and home lots as well as condomium units from unscrupulous practices; ands
licenses to sell.
*SPP Doc. 200* - Code of Ethics
*SPP Doc. 201* - Pre-Desing Services
*SPP Doc. 202* - Regular Design
*SPP Doc. 203* - Specialized Services (Answer)
*SPP Doc. 204*- Construction Services
*SPP Doc. 204a* - Full time Construction Services
*SPP Doc. 204b* - Construction Management
*SPP Doc. 205* - Post Construction Services
*SPP Doc. 206* - Comprehensive Architectural Services
*SPP Doc. 207* - Design Build Services
*SPP Doc. 208* - Architecural Design Competition
*SPP Doc. 209* - Professional Architectural Consulting
*SPP Doc. 210* - Methods of Compensation - ANSWER-The third (3) phase of the Architect's services?
• The primary clients of the HGC are lenders (NOT borrowers). These include banks, government and
private financial institutions, housing developers, and Building and Loan Associations (BLAs). These
lending institutions must apply for a Guaranty Line from
HGC in order for them to be covered. - ANSWER-WHO ARE THE CLIENTS OF HGC?
1. After plan is approved.
2. Additional specifications after specifications were approved.
,PROFESSIONAL PRACTICE
REFRESHER
3. Supervision - ANSWER-1. What is Change Order?
2. What is Supplementary Specs?
3. It is the primary power of the Architect over the Contractor during construction?
1. Bidding - ANSWER-1. The owner finally agree and accepts the Architect's Plans/Drawings. What is the
next logical step?
1. Pre-Bid Conference
2. Contract
3. Bid which is a compliant with the scope of works - ANSWER-1. It is the stage when the
contractor manager informs unqualified bidders of supplementary info prior to bidding?
2. It is signed immediately when the contractor is awarded the Contract?
3. What should be considered in the selection of the winning bid?
1. Prime / Lead Organization
2. Ar. Robert Sac - ANSWER-1. What is U.A.P. responsibility as I.A.P.O.A.?
2. When U.A.P was designated as I.A.P.O.A. who was its President?
, PROFESSIONAL PRACTICE
REFRESHER
1. Time Frame
2. Corporate Practice
*RA 545 - Old ver. of the law
*RA 9266 - Architecture Act of 2004 (New ver.)
3. Corporate Practice - ANSWER-1. What is the difference between a Site Plan and a Master Plan?
2. What is the difference between RA 9266 and RA 545?
3. New provision in RA 9266 not found in RA 545
10 % of Income tax;
12% of Professional fee
Note: Verify Answer! - ANSWER-How many %of tax should Architect Pay?
12%
Note: Verify Answer! - ANSWER-How many % of tax is taken form M.B.F?
6% or Php. 120,000 - ANSWER-The Architect's professional fee for a Bakery project worth 2 Million
pesos?
a. % of Construction cost - ANSWER-How is the Architect remunerated for basic services?
a. % of Construction cost
REFRESHER
- ANSWER-*OTHER TOPICS YOU SHOULD KNOW*
- ANSWER-If the owner wants to build a house after 1 year, how much is the fee?
- ANSWER-If the project's budget is constrained, what means should be used to achieve 3D
understanding of the project?
a. Animation
b. Scale Model
c. Perspective
d. Manual Sketch
- ANSWER-The Owner likes a particular bidder. He is delayed and fails to beat the deadline. What
factors can be considered so that he can still join the bid?
*PLANNING MANDATES OF H.L.U.R.B.*
▪ Formulate guidelines for Comprehensive Land Use Planning (CLUP)
▪ Assist cities and municipalities in preparing their CLUPs
▪ Assist Provincial Land Use Committees (PLUC) and Regional Land Use Committees (RLUC) in reviewing
CLUPs
▪ Review and approve CLUP's for highly urbanized cities and Provincial Physical Framework Plans (PPFPs)
▪ Monitor actual land use and the implementation of CLUPs by local government units
▪ Update and revise the National Urban Development and Housing Framework
▪ Train LGUs in subdivision plan approval and zoning enforcement - ANSWER-Most notably *Executive
Order 90* which renamed it as the *"HOUSING and Land Use Regulatory Board (H.L.U.R.B)"*
The *Housing and Land Use Regulatory Board* is the sole regulatory body for housing and land use
development.
,PROFESSIONAL PRACTICE
REFRESHER
In order to achieve the goal of rational land use, the HLURB performs the twin roles of enhancing the
reinforcing rational housing and real estate service delivery through the implementation of the following
three (3) strategies: policy, planning and regulation. *HLURB* approves condominium plans protect
buyers of housing units and home lots as well as condomium units from unscrupulous practices; ands
licenses to sell.
*SPP Doc. 200* - Code of Ethics
*SPP Doc. 201* - Pre-Desing Services
*SPP Doc. 202* - Regular Design
*SPP Doc. 203* - Specialized Services (Answer)
*SPP Doc. 204*- Construction Services
*SPP Doc. 204a* - Full time Construction Services
*SPP Doc. 204b* - Construction Management
*SPP Doc. 205* - Post Construction Services
*SPP Doc. 206* - Comprehensive Architectural Services
*SPP Doc. 207* - Design Build Services
*SPP Doc. 208* - Architecural Design Competition
*SPP Doc. 209* - Professional Architectural Consulting
*SPP Doc. 210* - Methods of Compensation - ANSWER-The third (3) phase of the Architect's services?
• The primary clients of the HGC are lenders (NOT borrowers). These include banks, government and
private financial institutions, housing developers, and Building and Loan Associations (BLAs). These
lending institutions must apply for a Guaranty Line from
HGC in order for them to be covered. - ANSWER-WHO ARE THE CLIENTS OF HGC?
1. After plan is approved.
2. Additional specifications after specifications were approved.
,PROFESSIONAL PRACTICE
REFRESHER
3. Supervision - ANSWER-1. What is Change Order?
2. What is Supplementary Specs?
3. It is the primary power of the Architect over the Contractor during construction?
1. Bidding - ANSWER-1. The owner finally agree and accepts the Architect's Plans/Drawings. What is the
next logical step?
1. Pre-Bid Conference
2. Contract
3. Bid which is a compliant with the scope of works - ANSWER-1. It is the stage when the
contractor manager informs unqualified bidders of supplementary info prior to bidding?
2. It is signed immediately when the contractor is awarded the Contract?
3. What should be considered in the selection of the winning bid?
1. Prime / Lead Organization
2. Ar. Robert Sac - ANSWER-1. What is U.A.P. responsibility as I.A.P.O.A.?
2. When U.A.P was designated as I.A.P.O.A. who was its President?
, PROFESSIONAL PRACTICE
REFRESHER
1. Time Frame
2. Corporate Practice
*RA 545 - Old ver. of the law
*RA 9266 - Architecture Act of 2004 (New ver.)
3. Corporate Practice - ANSWER-1. What is the difference between a Site Plan and a Master Plan?
2. What is the difference between RA 9266 and RA 545?
3. New provision in RA 9266 not found in RA 545
10 % of Income tax;
12% of Professional fee
Note: Verify Answer! - ANSWER-How many %of tax should Architect Pay?
12%
Note: Verify Answer! - ANSWER-How many % of tax is taken form M.B.F?
6% or Php. 120,000 - ANSWER-The Architect's professional fee for a Bakery project worth 2 Million
pesos?
a. % of Construction cost - ANSWER-How is the Architect remunerated for basic services?
a. % of Construction cost