Building Automation lvl 2 2025/2026
Exam Questions and Answers | A+ Score
Assured
protocol - 🧠ANSWER ✔✔A set of codes, message structures, signals, and
procedures implemented in hardware and software that permits the
exchange of information between nodes.
interoperability - 🧠ANSWER ✔✔The capability of network devices from
different manufacturers and systems to interact using a common
communication network and language framework
gateway network architecture - 🧠ANSWER ✔✔A network configuration
where a gateway is used to integrate separate control systems based on
different protocols
flat network architecture - 🧠ANSWER ✔✔A network configuration where
control devices are arranged in a peer-to-peer way.
proprietary protocol - 🧠ANSWER ✔✔A communications and network
protocol that is developed and used by only one device manufacturer.
1
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
,open protocol - 🧠ANSWER ✔✔A standardized communications and
network protocol that is published for use by any device manufacturer.
gateway - 🧠ANSWER ✔✔A network device that translates transmitted
information between different protocols.
control point - 🧠ANSWER ✔✔A variable in a control system.
low-limit control - 🧠ANSWER ✔✔A control strategy that makes system
adjustments necessary to maintain a control point above a certain value.
high-priority load - 🧠ANSWER ✔✔A load that is important to the operation
of a building and is shed last when demand goes up.
transient holiday - 🧠ANSWER ✔✔A holiday that changes its date each
year.
holiday and vacation scheduling - 🧠ANSWER ✔✔The programming of time-
based control functions during holidays and vacations.
Offset - 🧠ANSWER ✔✔The difference between the value of a control point
and its corresponding setpoint.
data trending - 🧠ANSWER ✔✔The recording of past building equipment
operating information.
2
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
, daily multiple time period scheduling - 🧠ANSWER ✔✔The programming of
time-based control functions for atypical periods of building occupancy.
control logic - 🧠ANSWER ✔✔The portion of controller software that
produces the necessary outputs based on the inputs.
seven-day scheduling - 🧠ANSWER ✔✔The programming of time-based
control functions that are unique for each day of the week.
proportional control algorithm - 🧠ANSWER ✔✔A control algorithm in which
the output is in direct response to the amount of offset in the system.
control strategy - 🧠ANSWER ✔✔A method for optimizing the control of
building system equipment.
thermal recovery coefficient - 🧠ANSWER ✔✔The ratio of a temperature
change to the length of time it takes to obtain that change.
control loop - 🧠ANSWER ✔✔The continuous repetition of the control logic
decisions.
optimum start control - 🧠ANSWER ✔✔A supervisory control strategy in
which the HVAC load is turned ON as late as possible to achieve the indoor
environment setpoints by the beginning of building
3
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
Exam Questions and Answers | A+ Score
Assured
protocol - 🧠ANSWER ✔✔A set of codes, message structures, signals, and
procedures implemented in hardware and software that permits the
exchange of information between nodes.
interoperability - 🧠ANSWER ✔✔The capability of network devices from
different manufacturers and systems to interact using a common
communication network and language framework
gateway network architecture - 🧠ANSWER ✔✔A network configuration
where a gateway is used to integrate separate control systems based on
different protocols
flat network architecture - 🧠ANSWER ✔✔A network configuration where
control devices are arranged in a peer-to-peer way.
proprietary protocol - 🧠ANSWER ✔✔A communications and network
protocol that is developed and used by only one device manufacturer.
1
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
,open protocol - 🧠ANSWER ✔✔A standardized communications and
network protocol that is published for use by any device manufacturer.
gateway - 🧠ANSWER ✔✔A network device that translates transmitted
information between different protocols.
control point - 🧠ANSWER ✔✔A variable in a control system.
low-limit control - 🧠ANSWER ✔✔A control strategy that makes system
adjustments necessary to maintain a control point above a certain value.
high-priority load - 🧠ANSWER ✔✔A load that is important to the operation
of a building and is shed last when demand goes up.
transient holiday - 🧠ANSWER ✔✔A holiday that changes its date each
year.
holiday and vacation scheduling - 🧠ANSWER ✔✔The programming of time-
based control functions during holidays and vacations.
Offset - 🧠ANSWER ✔✔The difference between the value of a control point
and its corresponding setpoint.
data trending - 🧠ANSWER ✔✔The recording of past building equipment
operating information.
2
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
, daily multiple time period scheduling - 🧠ANSWER ✔✔The programming of
time-based control functions for atypical periods of building occupancy.
control logic - 🧠ANSWER ✔✔The portion of controller software that
produces the necessary outputs based on the inputs.
seven-day scheduling - 🧠ANSWER ✔✔The programming of time-based
control functions that are unique for each day of the week.
proportional control algorithm - 🧠ANSWER ✔✔A control algorithm in which
the output is in direct response to the amount of offset in the system.
control strategy - 🧠ANSWER ✔✔A method for optimizing the control of
building system equipment.
thermal recovery coefficient - 🧠ANSWER ✔✔The ratio of a temperature
change to the length of time it takes to obtain that change.
control loop - 🧠ANSWER ✔✔The continuous repetition of the control logic
decisions.
optimum start control - 🧠ANSWER ✔✔A supervisory control strategy in
which the HVAC load is turned ON as late as possible to achieve the indoor
environment setpoints by the beginning of building
3
COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED