• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 38 pages
Exam (elaborations)

Voice-Data-Video System Drawings and Specifications

Document preview thumbnail
Preview 4 out of 38 pages

Voice-Data-Video System Drawings and Specifications

Content preview

Voice-Data-Video System Drawings and
Specifications

Chapter 1: Project Professionals, Design Phases, and the Construction Process

A typical commercial construction project begins with a( n ) __________ seeking
to develop a new or existing property to meets specific needs.

A. Architect
B. Engineer
C. General Contractor ( GC )
D. Owner Correct Answer - Owner

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The __________ is responsible for all inspections, the final building occupancy
approval sign-off, and the commissioning of all building systems.

A. Architect
B. Engineer
C. General Contractor ( GC )
D. Owner Correct Answer - General Contractor ( GC )

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The __________ phase gives the owner the first opportunity to see the potential
design and get an approximation of the costs

A. Bidding
B. Construction document
C. Design development
D. Schematic design Correct Answer - Schematic design

Chapter 1: Project Professionals, Design Phases, and the Construction Process

,The __________ are the fully completed design that complies with building codes
and industry standards and are ready for bidding and, ultimately, the
construction of the facility

A. Addendum
B. Construction documents
C. Drawings
D. Specifications Correct Answer - Construction documents

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The bidding method is often used for the electrical and VDV system portions
of a project.

A. Competing
B. Cost-plus
C. Labor-only
D. Negotiated/design-assist Correct Answer - Labor-only

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The __________ bidding method can often save time, provide flexibility, and
avoid the risk of removing completed or partially completed work and
starting over.

A. Competitive
B. Cost-plus
C. Labor-only
D. Negotiated/design-assist Correct Answer - Cost-plus

Chapter 1: Project Professionals, Design Phases, and the Construction Process

Most often, the product selection for private work is specified by __________.

A. Cost
B. Industry standards
C. Specific OEMs
D. Performance Correct Answer - Specific OEMS

,Chapter 1: Project Professionals, Design Phases, and the Construction Process

A( n ) __________ is a document that project managers use to resolve conflicts
early in the process to attempt to eliminate costly corrective measures

A) Addendum
B) Construction change directive
C) Punch list
D) Request for information ( RFI ) Correct Answer - Request for
information ( RFI )

Chapter 1: Project Professionals, Design Phases, and the Construction Process

A( n ) __________ is typically used to provide clarification and small changes,
such as slightly altering locations or dimensions on a print.

A) Addendum
B) Architect's supplemental instruction ( ASI )
C) Construction change directive
D) Request for information ( RFI ) Correct Answer - Architect's
supplemental instruction ( ASI )

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The end of the construction process includes a( n ) __________ generated by the
architect and the architect's design team outlining work. That remains to be
completed, work not installed as specified, and work requiring adjustment or
needing to be cleaned.

A) Addendum
B) Application assurance warranty
C) Architect's supplemental instruction
D) Punch list Correct Answer - Punch list

Chapter 1: Project Professionals, Design Phases, and the Construction Process

A professional engineer ( PE ) is an individual or commercial firm that
specializes in a particular trade or field of construction.

, True or False Correct Answer - False

Chapter 1: Project Professionals, Design Phases, and the Construction Process

Many OEMS typically provide warranties for VDV systems for a period of 5
years to 25 years

True or False Correct Answer - True

Chapter 1: Project Professionals, Design Phases, and the Construction Process

OEM-standardized VDV systems are also known as "proprietary systems."

True or false Correct Answer - True

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The most common method for bidding on a project from a contractor's
perspective is the labor-only method

True or false Correct Answer - False - It's the least common method

Chapter 1: Project Professionals, Design Phases, and the Construction Process

The owner of a project determines the parameters of the necessary building
space based on items such as property size and shape, desired interior and
exterior spaces, and available project budget.

True or False Correct Answer - False

Chapter 1: Project Professionals, Design Phases, and the Construction Process

__________ is the initial design phase that defines the general scope and
conceptual design of a project.

A) Schematic design
B) Drawing development
C) Coordination of requirements
D) Design development Correct Answer - Schematic design

Document information

Uploaded on
April 11, 2025
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$27.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LeCrae
4.0
(447)
Sold
2142
Followers
1409
Items
22650
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions