Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

CHFM QUESTIONS AND ANSWERS

Puntuación
-
Vendido
-
Páginas
11
Grado
A+
Subido en
11-04-2025
Escrito en
2024/2025

CHFM QUESTIONS AND ANSWERS

Institución
CERTIFIED HEALTHCARE FACILITY MANAGER
Grado
CERTIFIED HEALTHCARE FACILITY MANAGER

Vista previa del contenido

CHFM QUESTIONS AND ANSWERS
A project estimator is developing a cost estimate for construction of a new diagnostic
imaging wing. The projected costs are:

Fixed equipment installation charges $700,000

Site isolation $50,000

Annual utilities $425,000

Construction materials $1,200,000

Portable equipment $900,000

Annual depreciation $275,000

What are the expected contractor expenses? - Answers :1,600,000

Which of the following contribute to typical general contractor fees:

1. Permit and inspection fees

2. General conditions

3. Overhead and profit

4. Site condition assessment fees - Answers :2, 3, and 4

Demand side management (DSM) programs are developed and offered to organizations
by energy providers to do which of the following during peak service? - Answers
:Provide emergency energy demand sources

When developing a preventive maintenance program, a facility manager should ensure
that an annual test is conducted on every required battery-powered lighting system.
This test should be run for NOT less than: - Answers :30 seconds

In existing facilities, doors that open onto exit corridors should have 1-3/4 inch solid
bonded wood core or be of construction that resists fire for NOT less than: - Answers
:20 minutes

Total dissolved solids in a cooling tower are regulated by: - Answers :Variable speed
drive fans

What contracts requires a schedule of values when negotiating? - Answers :Guaranteed
maximum price

, A project has a budget of $6,600,000. Planning and design fees are estimated at
$700,000 and construction expenses are estimated at $5,100,000. What is the amount
of a 10% construction contingency? - Answers :580,000

The Joint Commission standards require that an organization develop and implement a
policy to prohibit smoking except in specified circumstances. The standard is intended
to reduce risks of:

1. Possible adverse effects on care, treatment, and services to people who smoke

2. Passive smoke to others

3. Fire

4. False alarms - Answers :2, 3, and 4

When planning demolition, construction, or renovation, an organization selects and
implements proper controls to reduce risk and minimize the impact of these activities on
infection control. Which of the following are proper controls within the construction area:

1. Providing negative air machines

2. Installing dust barriers

3. Wet-mopping the floors

4. Ensuring debris-free job site - Answers :2, 3, and 4

A facility is installing an air intake for a medical air compressor. What is the minimum
heights, in ft., at which this should be located above the ground? - Answers :5

When using a load bank to perform a load test on an Emergency Power Supply System
(EPSS) because the monthly test could not achieve 30% of the name plate load rating,
the test is run for a minimum of: - Answers :30 minutes

The process of a hospital construction project close-out by the contractor includes:

1. A punch list

2. Operations and maintenance manuals

3. As-built construction drawings

4. Final cleaning to be readied for patient use - Answers :1, 2, and 3

Escuela, estudio y materia

Institución
CERTIFIED HEALTHCARE FACILITY MANAGER
Grado
CERTIFIED HEALTHCARE FACILITY MANAGER

Información del documento

Subido en
11 de abril de 2025
Número de páginas
11
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2121
Miembro desde
4 año
Número de seguidores
1446
Documentos
56061
Última venta
1 día hace

3.8

360 reseñas

5
179
4
61
3
48
2
17
1
55

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes