SCDOTSecond
Asphalt Half
Roadway
Study Technician
Guide
SCDOT
– Certification
Second
Asphalt Half
Roadway
Prep
Study
PDF.pdf
Technician
Guide – Certification
Second HalfPrep
Study
PDF.pdf
Guide – Certification Prep PDF.pdf
SCDOT Asphalt Roadway Technician
Second Half Study Guide – Certification
Prep PDF
Guidehttps://www.stuvia.com/dashboard!@_)#*)(@$)($@*($@)($@*_
SCDOT Asphalt Roadway Technician
SCDOTSecond
Asphalt Half
Roadway
Study Technician
Guide
SCDOT
– Certification
Second
Asphalt Half
Roadway
Prep
Study
PDF.pdf
Technician
Guide – Certification
Second HalfPrep
Study
PDF.pdf
Guide – Certification Prep PDF.pdf
,Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf
Terms in this set (32)
What does OGFC stand for? Open Graded Friction Course
What is OGFC? Thin lift with high air voids that allow for water to run through and drain to
the side of a road instead of in the middle of the road
What common sieves do we use daily? 200
100
30
8
4
3/8 inch
1/2 inch
3/4 inch
1 inch
1/2 inch
Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf
,Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf
What is the mix temperature for 76-22? 300-350 degrees F
How much does a steel wheel roller weigh? 8-12 tons
How often does the ambient air temperature get Before paving starts, then 2 per lot
taken?
How often does the truck temperature get taken? 4 per lot
How often does the mat temperature behind the 4 per lot
screws get checked?
Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf
, Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf
How often is the calculated lay down rate taken? 1 per 200 tons
How often is the tack rate checked? 1 per application
What type of mixes require cores to be cut when Intermediate A & B
checking in place density? Surface A & B
On mixes that require cores to be cut, how often are Every 1500 feet
they taken?
Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf Scdot asphalt roadway technician second half.pdf