, 1. A ladder should extend a minimum of ____ above the top of a trench or
excavation.
o 3'.
2. According to OSHA, shoring lumber shall be _______.
o Select structural.
3. Cal/OSHA inspectors cannot, under most circumstances:
o Enter a business outside of normal business hours.
4. Every employer is required to post Material Safety Data Sheets:
o On each job site.
5. Handrails must be installed on all open sides of a scaffold if workers are subject
to falls of _____ or more.
o 7 1/2'.
6. When boom-type equipment is in operation, how close can it be to high voltage
power lines?
o 10'.
7. How should you store oily mops or rags at the job site?
o In a closed metal container.
8. If a Cal/OSHA inspector is coming to inspect a job site, it is best for the
contractor to:
o Personally walk through the job site and check the work.
9. In most cases, a crane cannot lift more than _____ % of its capacity. Always
consult the manufacturer's operations manual and all applicable codes before
using a crane and never attempt to use one without being thoroughly trained and
certified to operate the crane.
o 75%.
10. In stable oil, a trench that is _______ or deeper requires shoring.
o 5 Feet.
11. On a construction site, flammable liquids can be found in ______ containers.
o Red.
12. Prior to erecting scaffolding, it is best to consult the:
GENERAL B TRADE PRACTICE
EXAM 2 108 QUESTIONS
VERIFIED
[Document subtitle]
[DATE]
[COMPANY NAME]
[Company address]
, 1. A ladder should extend a minimum of ____ above the top of a trench or
excavation.
o 3'.
2. According to OSHA, shoring lumber shall be _______.
o Select structural.
3. Cal/OSHA inspectors cannot, under most circumstances:
o Enter a business outside of normal business hours.
4. Every employer is required to post Material Safety Data Sheets:
o On each job site.
5. Handrails must be installed on all open sides of a scaffold if workers are subject
to falls of _____ or more.
o 7 1/2'.
6. When boom-type equipment is in operation, how close can it be to high voltage
power lines?
o 10'.
7. How should you store oily mops or rags at the job site?
o In a closed metal container.
8. If a Cal/OSHA inspector is coming to inspect a job site, it is best for the
contractor to:
o Personally walk through the job site and check the work.
9. In most cases, a crane cannot lift more than _____ % of its capacity. Always
consult the manufacturer's operations manual and all applicable codes before
using a crane and never attempt to use one without being thoroughly trained and
certified to operate the crane.
o 75%.
10. In stable oil, a trench that is _______ or deeper requires shoring.
o 5 Feet.
11. On a construction site, flammable liquids can be found in ______ containers.
o Red.
12. Prior to erecting scaffolding, it is best to consult the: