100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NERC Exams questions with correct answers

Rating
-
Sold
-
Pages
36
Grade
A+
Uploaded on
06-04-2025
Written in
2024/2025

NERC Exams questions with correct answers

Institution
NERC
Course
NERC











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
April 6, 2025
Number of pages
36
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC Exams questions with correct
answers,37

Operating reserve may be provided by which of the following?

A. LTCs

B. Capacitor banks

C. Voltage regulators

D. Interruptible loads - correct answersD. Interruptible loads



Which of the following is the responsibility of a reserve sharing group (RSG)?

A. Complying with DCS as if it was a single control area

B. Proving regulation service for neighboring RSGs

C. Ensuring each control area in the group maintains 50% blackstart capability

D. Complying with the control performance standards as if it was a single control area -
correct answersA. Complying with DCS as if it was a single control area



Generation is not sufficient to meet load, the control area is importing heavily, and voltage is
decaying, which of the following actions should be taken by the operator?

A. Shed load

B. Correct schedule deviation

C. Use the Interconnection Hotline

D. Schedule interchange transaction - correct answersA. Shed load



What measures power flow data between control areas?

A. OASIS

,B. Interchange

C. Transactions

D. Tie-Line metering - correct answersD. Tie-Line metering



Transmission line removal as a voltage control can be used if:

A. Loop flow remains high

B. Reactive equipment is available

C. Reliability stays at acceptable levels

D. Synchronous condensers are off the line - correct answersC. Reliability stays at acceptable
levels



Control Area A is generating and sending Control Area B a schedule. Both control areas should
verify all of the following EXCEPT:

A. Magnitude (MW)

B. Ramp rate

C. Price

D. Start/stop times - correct answersC. Price



The AGC control mode that is normally used for system operation is:

A. Flat Tie Mode

B. Flat Frequency Mode

C. Frequency Bias Mode

D. Tie Line Bias Mode - correct answersD. Tie Line Bias Mode



There has been a wide-area disturbance. The transfers through the system have increased and
there is a possibility that loss of one major tie line would cause corresponding loading and
voltage deviations. Having system resources available, the security coordinator should:

,A. Increase generation to reduce flows across the ties

B. Implement schedule changes across the hour

C. Implement a voltage reduction plan

D. Advise the supervisor - correct answersA. Increase generation to reduce flows across the
ties



When referring to transmission lines of an interconnected network, neighboring systems
should use:

A. Own line identifiers and ratings

B. NERC line identifiers and ratings

C. Region line identifiers and ratings

D. Uniform (common) line identifiers and ratings - correct answersD. Uniform (common) line
identifiers and ratings



To what level should a control area maintain its own reactive reserves?

A. 105% voltage level

B. 95% voltage level

C. First contingency conditions

D. Second contingency conditions - correct answersC. First contingency conditions



Which load shedding step should be implemented first (per Policy 6B)?

A. Manual

B. Underfrequency

C. Rate of voltage decay

D. Rate of frequency decay - correct answersA. Manual

, Between sending, receiving, and intermediary control areas, what is the minimum
information pertaining to an interchange schedule that must be confirmed?

1. The scheduling path & magnitude of the transaction

2. The Start/stop times, ramp times, and duration

3. Price of energy

4. Loss accounting including MVAR at points of receipt and delivery

A. 1 and 2

B. 1 and 4

C. 2 and 3

D. 3 and 4 - correct answersA. 1 and 2



Control areas shall NOT operate to cause any other system to violate established operating
reliability criteria from changes made to:

A. Interchange schedules

B. Capacitor banks

C. Reactors

D. LTCs - correct answersA. Interchange schedules



Per Policy 4, 4A, In order to predict the system's near term load pattern, a system operator
must have information including weather forecasts and:

A. Sufficient metering

B. Past load patterns

C. Projected load patterns

D. Generator overhaul schedules - correct answersB. Past load patterns



All of the following electric system security data are to be updated at least every 10 minutes
EXCEPT:

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SMARTPRO Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
22
Member since
8 months
Number of followers
0
Documents
6187
Last sold
2 days ago

Welcome to your reliable partner for academic achievement. My page is built on one principle: providing the shortest, clearest path to mastery and confidence. I create high-impact resources designed to turn your study hours into top performance, offering expert Study Guides (concise notes that simplify challenging concepts) and strategic Revision Papers (realistic practice questions that maximize your score potential). Success is a strategy. Stop wading through endless readings and start using proven tools to guarantee your best possible outcome. All the best.

Read more Read less
4.0

4 reviews

5
2
4
0
3
2
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions