ACTUAL Exam Questions and CORRECT
Answers
12-24v - CORRECT ANSWER - What is the input voltage range of the Doorbell Cam?
16.5 VAC - CORRECT ANSWER - What is the output voltage of the transformer used to
power the SkyControl panel?
true - CORRECT ANSWER - True or False: When programming a sensor into the sky panel
you can type in the serial number or "learn" it in by triggering the device
2 - CORRECT ANSWER - When programming a DW21, which loop number is used?
1
2
3
beans and wire caps - CORRECT ANSWER - Which of the following materials can you use
to group multiple ground terminals in a takeover module:
Solder
String
Wire Caps
Duct Tape
Beans
True - CORRECT ANSWER - T or F: When installing the firefighter, it is required to test the
customer's existing smoke detectors
, 3/4" - CORRECT ANSWER - When installing a DW21, what size bit should you use to drill
the hole for the sensor?
1/2"
3/8"
3/4"
1"
True - CORRECT ANSWER - T or F: When installing the TAKE-345, you must ensure that
the transformer is supplying power to the power supply before the battery.
True - CORRECT ANSWER - T or F: You are required to test signals from all secondary
keypads and key fobs even though they are not detection devices
False - CORRECT ANSWER - T or F: When running power to the TAKE-345 polarity does
not apply
- CORRECT ANSWER - What is the correct height at which to install the PIR2?
7 ft
At least 5 ft
At least 7 ft
At 7.5 ft
How would you program a CO3 if mounted on a hallway wall?
Loop 1 Zone 8
Loop 1 Zone 14
Loop 3 Zone 4
Loop 1 Zone 4 - CORRECT ANSWER -