Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA)

Document preview thumbnail
Preview 3 out of 16 pages

ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA) The standard practice describes the _____ _____ and _____ required to obtain a representative sample of fresh concrete and to assess its tractability to the structure it represents. - ANSWERSprocedures, location and sample size The procedures used in sampling shall include the use of every precaution that will assist in obtaining samples that are truly representative of the _____and _______ of the concrete. - ANSWERSnature and conditions Intermittent scooping of the sample in shovelfuls or bucketfuls into a wheelbarrow or tray as the concrete continues to flow down the delivery chute is an acceptable technique? - ANSWERSFalse The concrete sample must be protected at all times from sun, wind,____and - ANSWERSrapid evaporation, contaminants the minimum size sample for making three 100mm diameter strength test cylinder specimens is - ANSWERS20l for 100x200mm The grab sample form a mixer must be obtained between the ____% and ____%points of the discharge(except when sampling prior to the addition of a super plasticizer.) - ANSWERS10, 90 When the concrete contains aggregate whose nominal size is larger than that permitted for a particular test method, the sample of concrete must be _____before making the test(except for Density tests) - ANSWERSWet Sieved(over the appropriate sieve size)

Content preview

ACI CONCRETE FIELD TESTING
TECHNICIANS GRADE 1 (IN CANADA)

The standard practice describes the _____ _____ and _____ required to obtain a representative
sample of fresh concrete and to assess its tractability to the structure it represents. -
ANSWERSprocedures, location and sample size



The procedures used in sampling shall include the use of every precaution that will assist in
obtaining samples that are truly representative of the _____and _______ of the concrete. -
ANSWERSnature and conditions



Intermittent scooping of the sample in shovelfuls or bucketfuls into a wheelbarrow or tray as
the concrete continues to flow down the delivery chute is an acceptable technique? -
ANSWERSFalse



The concrete sample must be protected at all times from sun, wind,____and - ANSWERSrapid
evaporation, contaminants



the minimum size sample for making three 100mm diameter strength test cylinder specimens is
- ANSWERS20l for 100x200mm



The grab sample form a mixer must be obtained between the ____% and ____%points of the
discharge(except when sampling prior to the addition of a super plasticizer.) - ANSWERS10, 90



When the concrete contains aggregate whose nominal size is larger than that permitted for a
particular test method, the sample of concrete must be _____before making the test(except for
Density tests) - ANSWERSWet Sieved(over the appropriate sieve size)

,When sampling for uniformity of mixed concrete____grab samples shall be obtained from
widely separated portions of the batch during discharge - ANSWERSThree



The temperature of the concrete must be determined within ___ minutes of obtaining the grab
sample. - ANSWERS5 minutes



Air content (pressure method) measurement and slump must both be completed within ______
minutes after the sample has been transported and remixed. - ANSWERS10 minutes



Moulding of concrete strength cylinders or flexural beams must be completed within
____minutes after the sample has been transported and remixed. - ANSWERS20 minutes



Air content (volumetric method) must be started within ____ minutes after the sample has
been transported and remixed. - ANSWERS5 minutes



What document produced by the concrete supplier contains information relating to
identification of the concrete sample? - ANSWERSThe delivery ticket



Describe the operation of obtaining a sample for evaluation of concrete quality. -
ANSWERSObtain a single grab sample at one point of the discharge in as short a time as
possible.



Between what two points of the mixer discharge must the concrete be sampled? - ANSWERSthe
10% and 90% points



How is the sample obtained from the discharge stream of a mixer truck? - ANSWERSPass the
receptacle completely through discharge stream OR completely divert discharge stream into
sample container.

, What is the minimu size of sample to be obtained when strength test specimens are to be
moulded? - ANSWERS20l when 100dia x 200mm cylinder are made

30l when 150dia x 300mm cylinders are made

55l when three flexural beams are to be made



From what conditions must the concrete sample be protected? - ANSWERSSun, wind, rapid
evaporation and contamination



What must be done between taking the sample form the mixer and performing the test? -
ANSWERSTransport the sample to the place where the tests are to be performed

Remix with a shovel



What is the time limit for completion of sampling? - ANSWERS10 minutes



The test for temperature must be completed in how many minutes after obtaining the sample? -
ANSWERS5 minutes



Tests for slump and air content must be completed within how many minutes after sample has
been transported and remixed? - ANSWERS10 minutes



Moulding of strength test specimens must be completed within how many minutes after sample
has been transported and remixed? - ANSWERS20 minutes



CSA A23.2-3C gives standardized procedures for _____and ______ of test cylinders and flexural
test beams from samples of fresh concrete. - ANSWERSmaking, curing



The tamping rod must be a round, straight steel rod with a diameter of ___mm for the standard
100mm diameter cylinders - ANSWERS10mm

Document information

Uploaded on
April 6, 2025
Number of pages
16
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bensuda
3.7
(164)
Sold
904
Followers
445
Items
23098
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions