ECBA EXAM questions n complete /verified
solution already passed
1. Q1.Which of the following techniques can be
D. Decision modelling
used to model the rationale of a change? A.
Roles and Permis- sions Matrix B.
Organizational modelling C. Business capability
analysis D. Decision modelling
2. Q2.The main reason for implementing appropriate lev- A. Not all
stakeholders find
els of abstraction is because: A. Not all value in the entire set of
stakeholders find value in the entire set of requirements
requirements B. Re- quirements do not have
necessary attributes C. Re- quirements have
missing components D. Stakeholders don't
have interest
A. Glossary
3. Q3.Which of the following is used to record the
mean- ing of relevant business terms while
analyzing require- ments? A. Glossary B. Scope
model C. State model D. Data dictionary
4. Q4.Which of the following can be used for quality con- D. Checklists
trol when verifying requirements and designs? A.
Data model B. Templates C. Information
management ap- proach D. Checklists
5. Q5.Which of the following stakeholders can participate D. Any
stakeholders
in specify and model requirements task? A. Only
Spon- sor and PM B. Only developers and
implementation SME C. Only technical architect
and PM D. Any stake- holders
1/
17
,ECBA EXAM questions n complete /verified
solution already passed
6. Q6.A set of conventions that define how requirements B. Viewpoints
will be represented; organized and related is known as:
A. Views B. Viewpoints C. Architecture D. Attributes
7. B. Unambiguous
2/
17
, ECBA EXAM questions n complete /verified
solution already passed
Q7.If there are no relationships between requirements
that link elements in two different and
conflicting ways; then the relationship satisfies
which of the fol- lowing quality criteria? A.
Consistent B. Unambiguous
C. Necessary D. Defined
8. Q8.Which of the following describes how all of the busi- A. Business
analysis infor-
ness analysis information for a change relates will help C
includ- ing the relationship between various the most? A.
types of informa- tion? A. Business analysis Penalty B.
information architecture B. Architectural Cost C.
framework C. Viewpoints D. Views Benefit D.
Risk
9. Q9.Business analyst A has decomposed BA
informa- tion into components to further 12. Q12.Which
examine constraints or assumptions that of the
impact the components. What is A doing? A. following
Modelling requirements B. Analyzing re- prioritization
quirements C. Implementing requirements D. factors con-
Repre- senting attributes siders
consequenc
10. Q10.Which of the following provides a plan es resulting
to tran- sition from the current state to the from not
future state?A. Business policies B. Change implementin
strategy C. Current state description D. BA ga
performance assessment requirement
? A. Benefit
11. Q11.Business Analyst C wants to prioritize
B. Penalty C.
require- ments based on the highest value that
Cost D. Risk
it can provide. Which of the following factors
3/
17
solution already passed
1. Q1.Which of the following techniques can be
D. Decision modelling
used to model the rationale of a change? A.
Roles and Permis- sions Matrix B.
Organizational modelling C. Business capability
analysis D. Decision modelling
2. Q2.The main reason for implementing appropriate lev- A. Not all
stakeholders find
els of abstraction is because: A. Not all value in the entire set of
stakeholders find value in the entire set of requirements
requirements B. Re- quirements do not have
necessary attributes C. Re- quirements have
missing components D. Stakeholders don't
have interest
A. Glossary
3. Q3.Which of the following is used to record the
mean- ing of relevant business terms while
analyzing require- ments? A. Glossary B. Scope
model C. State model D. Data dictionary
4. Q4.Which of the following can be used for quality con- D. Checklists
trol when verifying requirements and designs? A.
Data model B. Templates C. Information
management ap- proach D. Checklists
5. Q5.Which of the following stakeholders can participate D. Any
stakeholders
in specify and model requirements task? A. Only
Spon- sor and PM B. Only developers and
implementation SME C. Only technical architect
and PM D. Any stake- holders
1/
17
,ECBA EXAM questions n complete /verified
solution already passed
6. Q6.A set of conventions that define how requirements B. Viewpoints
will be represented; organized and related is known as:
A. Views B. Viewpoints C. Architecture D. Attributes
7. B. Unambiguous
2/
17
, ECBA EXAM questions n complete /verified
solution already passed
Q7.If there are no relationships between requirements
that link elements in two different and
conflicting ways; then the relationship satisfies
which of the fol- lowing quality criteria? A.
Consistent B. Unambiguous
C. Necessary D. Defined
8. Q8.Which of the following describes how all of the busi- A. Business
analysis infor-
ness analysis information for a change relates will help C
includ- ing the relationship between various the most? A.
types of informa- tion? A. Business analysis Penalty B.
information architecture B. Architectural Cost C.
framework C. Viewpoints D. Views Benefit D.
Risk
9. Q9.Business analyst A has decomposed BA
informa- tion into components to further 12. Q12.Which
examine constraints or assumptions that of the
impact the components. What is A doing? A. following
Modelling requirements B. Analyzing re- prioritization
quirements C. Implementing requirements D. factors con-
Repre- senting attributes siders
consequenc
10. Q10.Which of the following provides a plan es resulting
to tran- sition from the current state to the from not
future state?A. Business policies B. Change implementin
strategy C. Current state description D. BA ga
performance assessment requirement
? A. Benefit
11. Q11.Business Analyst C wants to prioritize
B. Penalty C.
require- ments based on the highest value that
Cost D. Risk
it can provide. Which of the following factors
3/
17