CSLB Class B General Contractor's
License - Building's Exam With
Correct Questions And Answers:
Framing & Structural
6 inches - Correct Answer ✔✔ - How much clearance is needed between the ground and wood siding?
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
4X10d nails - Correct Answer ✔✔ - When nailing a continuous header to the studs, best practice is to
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
use:
JC
Moisture content, Grade, Species - Correct Answer ✔✔ - Graded lumber is stamped with information
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
about the lumber. What is included?
JC JC JC JC JC JC
In load bearing walls with holes exceeding 40% of the stud depth. - Correct Answer ✔✔ - When are
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
studs doubled?
JC JC
5/8 inch - Correct Answer ✔✔ - A solid plywood roof deck at 3/12 pitch or greater, receiving asphalt
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
shingles and having rafters laid out 24 inches on center, should have a minimum plywood sheathing
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
thickness of ______.
JC JC JC
OSB with edge nailing 4" o.c. and field 6 "o.c. - Correct Answer ✔✔ - Specific information about shear
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
walls, such a type of sheathing and nailing, can usually be found on the building plans. Abbreviations
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
such as "6W4" are common, which would mean:
JC JC JC JC JC JC JC JC
S-GRN: "Surfaced Green" Not dried, moisture content over 19%.S-DRY: "Surfaced Dry" Air dried to a
JC JC JC JC JC JC JC JC JC JC JC JC JC JC
moisture content less than 19%. KD: "Kiln Dry" Dried in a heated kiln to a moisture content less than
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
19%.MC 15: "Moisture Content 15%" Dried to a moisture content of 15% or less.HT: "Heat Treated"
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
Heated to at least 133° Fahrenheit for 30 minutes at the board's core to kill any insects present in the
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
wood. - Correct Answer ✔✔ - Graded lumber is marked with an indication of moisture content; which
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
is the driest designation?
JC JC JC JC
To shed water away from the structure at roof to wall transitions
JC JC JC JC JC JC JC JC JC JC JC JC
(Step flashing are interwoven between each course of shingles and protect the transition from water
JC JC JC JC JC JC JC JC JC JC JC JC JC JC
intrusion by creating a water shed aka shingle effect.
JC JC JC JC JC JC JC JC JC
Next Question JC
,Leave Feedback) - Correct Answer ✔✔ - What is the purpose of a step flashing?
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
A) Will always be parallel - Correct Answer ✔✔ - Bracing lines:
JC JC JC JC JC JC JC JC JC JC JC JC
A) Will always be parallel
JC JC JC JC
B) Should intersect at 90˚
JC JC JC JC
C) Always run in the same direction
JC JC JC JC JC JC
D) Can be added at any time
JC JC JC JC JC JC
D) Weave shingles under the lower end of the base flashing and over the upper portion of the base
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
flashing
JC
(In re-roof overlays, many roofers will conceal the base flashing under the shingles and apply mastic at
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
the transition. While this method is allowable for overlays, it is not recommended due to the inherent
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
likelihood of moisture influence under the shingles at these locations.) - Correct Answer ✔✔ - Proper
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
installation of roof pipe and vent penetration base flashing should consist of:
JC JC JC JC JC JC JC JC JC JC JC JC
A) Apply shingles so as to completely conceal base flashing
JC JC JC JC JC JC JC JC JC
B) Apply shingles under the base flashing and seal perimeter of base flashing with roof cement
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
C) Seal pipe/vent penetration with roof cement
JC JC JC JC JC JC
D) Weave shingles under the lower end of the base flashing and over the upper portion of the base
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
flashing
JC
A) Structural light framing No: 1 - Correct Answer ✔✔ - Grade designations indicate the recommended
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
use of lumber. Which grade would you chose for building trusses?
JC JC JC JC JC JC JC JC JC JC JC
A) Structural light framing No: 1
JC JC JC JC JC
B) Structural light framing No: 3
JC JC JC JC JC
C) Light framing: Construction
JC JC JC
D) Light framing: Standard
JC JC JC
, 18" - Correct Answer ✔✔ - In crawlspace, if the floor is built out of non-pressure treated wood, how
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
high is the floor joist from the soil?
JC JC JC JC JC JC JC JC
A) Blocking is required at the beginning of any overhang - Correct Answer ✔✔ - When building a deck,
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
it may be necessary to use blocking between joists.
JC JC JC JC JC JC JC JC JC
A) Blocking is required at the beginning of any overhang
JC JC JC JC JC JC JC JC JC
B) Blocking is required every 10 feet
JC JC JC JC JC JC
C) Blocking is required if joists are 24" o.c. or more
JC JC JC JC JC JC JC JC JC JC
D) Blocking is required if joists are 8"x or larger
JC JC JC JC JC JC JC JC JC
24" o. c. - Correct Answer ✔✔ - What is the maximum spacing of 2 x 4 inch studs on a 1 story house?
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
B) Not be notched - Correct Answer ✔✔ - Engineered floor trusses and I-Joists should:
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
A) Always be kept in low humidity
JC JC JC JC JC JC
B) Not be notched
JC JC JC
C) Purchased in batches
JC JC JC
D) Always be approved by an engineer
JC JC JC JC JC JC
D) 16d 16" o.c.
JC JC JC
(According to the California Residential Code, 16d common nails at 16" o.c. face nail or 10d box nails at
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
12" o.c. face nail.) - Correct Answer ✔✔ - Double top plates are best nailed together with:
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
A) 10d 24" o.c
JC JC JC
B) 16d 24" o.c
JC JC JC
C) 10d 16" o.c
JC JC JC
D) 16d 16" o.c.
JC JC JC
A) Between floors - Correct Answer ✔✔ - Hold-downs are usually set into the foundation or pad.
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
Where else might you need to install them?
JC JC JC JC JC JC JC JC
License - Building's Exam With
Correct Questions And Answers:
Framing & Structural
6 inches - Correct Answer ✔✔ - How much clearance is needed between the ground and wood siding?
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
4X10d nails - Correct Answer ✔✔ - When nailing a continuous header to the studs, best practice is to
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
use:
JC
Moisture content, Grade, Species - Correct Answer ✔✔ - Graded lumber is stamped with information
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
about the lumber. What is included?
JC JC JC JC JC JC
In load bearing walls with holes exceeding 40% of the stud depth. - Correct Answer ✔✔ - When are
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
studs doubled?
JC JC
5/8 inch - Correct Answer ✔✔ - A solid plywood roof deck at 3/12 pitch or greater, receiving asphalt
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
shingles and having rafters laid out 24 inches on center, should have a minimum plywood sheathing
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
thickness of ______.
JC JC JC
OSB with edge nailing 4" o.c. and field 6 "o.c. - Correct Answer ✔✔ - Specific information about shear
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
walls, such a type of sheathing and nailing, can usually be found on the building plans. Abbreviations
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
such as "6W4" are common, which would mean:
JC JC JC JC JC JC JC JC
S-GRN: "Surfaced Green" Not dried, moisture content over 19%.S-DRY: "Surfaced Dry" Air dried to a
JC JC JC JC JC JC JC JC JC JC JC JC JC JC
moisture content less than 19%. KD: "Kiln Dry" Dried in a heated kiln to a moisture content less than
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
19%.MC 15: "Moisture Content 15%" Dried to a moisture content of 15% or less.HT: "Heat Treated"
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
Heated to at least 133° Fahrenheit for 30 minutes at the board's core to kill any insects present in the
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
wood. - Correct Answer ✔✔ - Graded lumber is marked with an indication of moisture content; which
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
is the driest designation?
JC JC JC JC
To shed water away from the structure at roof to wall transitions
JC JC JC JC JC JC JC JC JC JC JC JC
(Step flashing are interwoven between each course of shingles and protect the transition from water
JC JC JC JC JC JC JC JC JC JC JC JC JC JC
intrusion by creating a water shed aka shingle effect.
JC JC JC JC JC JC JC JC JC
Next Question JC
,Leave Feedback) - Correct Answer ✔✔ - What is the purpose of a step flashing?
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
A) Will always be parallel - Correct Answer ✔✔ - Bracing lines:
JC JC JC JC JC JC JC JC JC JC JC JC
A) Will always be parallel
JC JC JC JC
B) Should intersect at 90˚
JC JC JC JC
C) Always run in the same direction
JC JC JC JC JC JC
D) Can be added at any time
JC JC JC JC JC JC
D) Weave shingles under the lower end of the base flashing and over the upper portion of the base
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
flashing
JC
(In re-roof overlays, many roofers will conceal the base flashing under the shingles and apply mastic at
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
the transition. While this method is allowable for overlays, it is not recommended due to the inherent
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
likelihood of moisture influence under the shingles at these locations.) - Correct Answer ✔✔ - Proper
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
installation of roof pipe and vent penetration base flashing should consist of:
JC JC JC JC JC JC JC JC JC JC JC JC
A) Apply shingles so as to completely conceal base flashing
JC JC JC JC JC JC JC JC JC
B) Apply shingles under the base flashing and seal perimeter of base flashing with roof cement
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
C) Seal pipe/vent penetration with roof cement
JC JC JC JC JC JC
D) Weave shingles under the lower end of the base flashing and over the upper portion of the base
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
flashing
JC
A) Structural light framing No: 1 - Correct Answer ✔✔ - Grade designations indicate the recommended
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
use of lumber. Which grade would you chose for building trusses?
JC JC JC JC JC JC JC JC JC JC JC
A) Structural light framing No: 1
JC JC JC JC JC
B) Structural light framing No: 3
JC JC JC JC JC
C) Light framing: Construction
JC JC JC
D) Light framing: Standard
JC JC JC
, 18" - Correct Answer ✔✔ - In crawlspace, if the floor is built out of non-pressure treated wood, how
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
high is the floor joist from the soil?
JC JC JC JC JC JC JC JC
A) Blocking is required at the beginning of any overhang - Correct Answer ✔✔ - When building a deck,
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
it may be necessary to use blocking between joists.
JC JC JC JC JC JC JC JC JC
A) Blocking is required at the beginning of any overhang
JC JC JC JC JC JC JC JC JC
B) Blocking is required every 10 feet
JC JC JC JC JC JC
C) Blocking is required if joists are 24" o.c. or more
JC JC JC JC JC JC JC JC JC JC
D) Blocking is required if joists are 8"x or larger
JC JC JC JC JC JC JC JC JC
24" o. c. - Correct Answer ✔✔ - What is the maximum spacing of 2 x 4 inch studs on a 1 story house?
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
B) Not be notched - Correct Answer ✔✔ - Engineered floor trusses and I-Joists should:
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
A) Always be kept in low humidity
JC JC JC JC JC JC
B) Not be notched
JC JC JC
C) Purchased in batches
JC JC JC
D) Always be approved by an engineer
JC JC JC JC JC JC
D) 16d 16" o.c.
JC JC JC
(According to the California Residential Code, 16d common nails at 16" o.c. face nail or 10d box nails at
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
12" o.c. face nail.) - Correct Answer ✔✔ - Double top plates are best nailed together with:
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
A) 10d 24" o.c
JC JC JC
B) 16d 24" o.c
JC JC JC
C) 10d 16" o.c
JC JC JC
D) 16d 16" o.c.
JC JC JC
A) Between floors - Correct Answer ✔✔ - Hold-downs are usually set into the foundation or pad.
JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC JC
Where else might you need to install them?
JC JC JC JC JC JC JC JC