"Sampling Fresh Concrete: Portions of a composite sample shall be thoroughly remixed before
beginning tests on the sample? True or False? - CORRECT ANSWER True (Reference 1.5.5)"
"Sampling Fresh Concrete: Start tests for slump, temperature, and air content within
________________ after obtaining the final portion of the composite sample. - CORRECT
ANSWER 5 minutes (Reference 1.5.5 & Figure 1.6)"
"Sampling Fresh Concrete: Start molding specimens for strength tests within
___________________ after fabricating the composite sample. - CORRECT ANSWER 15
minutes (Reference 1.5.5 & Figure 1.6)"
"Sampling Fresh Concrete: The concrete sample must be protected from contamination and
______________________. - CORRECT ANSWER Evaporation (Reference 1.2)"
"Sampling Fresh Concrete: The minimum sample for making strength test specimens is
_____________________. - CORRECT ANSWER 1 FT^3 (28 L) (Reference 1.5.1)"
"Sampling Fresh Concrete: Where sampling from a stationary mixer, the batch must be sampled
at ______ or more regularly spaced intervals during discharge of the middle portion of the
batch. - CORRECT ANSWER Two (Reference 1.5.2)"
"Sampling Fresh Concrete: Concrete samples from a truck mixer must be obtained before any
water or admixtures are added to the mixer at the job site. True or False? - CORRECT
ANSWER False (Reference 1.5.2)"
"Sampling Fresh Concrete: When the concrete contains aggregate larger than that permitted
for a particular test method, the sample of concrete must be ______________________ before
making the test. - CORRECT ANSWER Wet screened (Reference 1.5.1)"
"Temperature of Fresh Concrete: The stem of the thermometer is submerged a minimum of
_______________________. - CORRECT ANSWER 3 inches (75 mm) (Reference 2.4)"
1
, "Temperature of Fresh Concrete: A composite sample of concrete is required even if the only
purpose for obtaining the sample is to determine temperature. True or False? - CORRECT
ANSWER False (Reference 2.3.3)"
"Temperature of Fresh Concrete: What must be done to the sample container prior to sampling
the concrete? - CORRECT ANSWER Dampened (with water) (Reference 2.3.3)"
"Temperature of Fresh Concrete: There is a specified maximum temperature of freshly mixed
concrete. True or False? - CORRECT ANSWER False"
"Temperature of Fresh Concrete: The sample of concrete used for temperature determination
must be rodded 25 times. True or False? - CORRECT ANSWER False"
"Slump of Fresh Concrete: When the concrete contains aggregate larger than allowed for the
slump test, the large aggregate must be
______________________________________________________________________________
_. - CORRECT ANSWER Wet screened over 1-1/2 in. (37.5 mm) sieve. ( Reference 3.5)"
"Slump of Fresh Concrete: The mold for making the slump test is in the shape of
______________________________________________________________________________
____________________. - CORRECT ANSWER The frustrum of a cone. (Reference 3.5)"
"Slump of Fresh Concrete: The height of the slump mold is _____________________. -
CORRECT ANSWER 12 in. ( 300 mm) (Reference 3.5)"
"Slump of Fresh Concrete: The interior surface of the slump mold is allowed to have minor
irregularities. True or False? - CORRECT ANSWER False (Reference 3.5)"
"Slump of Fresh Concrete: For use in the slump test, the tamping end or both ends of the
tamping rod must be ____________________________________________________________.
- CORRECT ANSWER Rounded to a hemispherical tip. (Reference 3.5)"
"Slump of Fresh Concrete: Rod each layer _______________ times uniformly over the cross
section with the rounded end of the rod. - CORRECT ANSWER 25 (Reference 3.5)"